Explain dissolved impurities in water, Civil Engineering

Assignment Help:

Q. Explain Dissolved Impurities in water?

The impurities which are caused by the action of water and water forming Acids with organic matter and carbon dioxide from air during its flow over mineral Salts present in the soil are called dissolved impurities.

These include following :-

(a) Salts :- (I) Calcium and magnesium salts ( Carbonates; Bicarbonates; Chlorides; Sulfates.)

(ii) Sodium salts- Carbonates; Bicarbonates; Chlorides; Sulphates; fluorides.

(b) Metals:- Iron; Lead; Manganese; Arsenic.

( c ) Gases ;- Oxgyen; chlorine; Hydrogen; Sulphide; Carbon dioxide; Ammonia.

(d) Vegetable and Animal matter.


Related Discussions:- Explain dissolved impurities in water

Location of construction joints, Q. Location of construction joints? Co...

Q. Location of construction joints? Construction joints are generally required in construction works since there is limited supply of fresh concrete in concrete batching plants

Determine the late start time for activity, For the project network shown, ...

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

Understanding civil main things, i want to just understand civil eng main p...

i want to just understand civil eng main points of all subjects which i becam able to tell some body about this tha what is this ?

Explain rebound hammer - underwater non-destructive testing, Explain Reboun...

Explain Rebound Hammer - Underwater non-destructive testing? The underwater rebound hammer system is a surface hardness tester which can be employed to acquire a general condit

Quantity calculation for subgrade preparation, reparation of subgrade in sq...

reparation of subgrade in sqm for a road of span 12 km and width 5.25m,with shoulders of 0.75m span on both the sides...considering extrawidening too......plz help...i m preparing

Indicate quality of rock foundation, Question During piling works, norm...

Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by

Estimate the net present worth - construction management, Three alternative...

Three alternatives are being considered for improving a street intersection.The annual dollar savings on account of the improvement is shown below.  Assume that the intersection wi

Area bouded by curves, find the area bounded by the curve y=3x(x-2)^2 and t...

find the area bounded by the curve y=3x(x-2)^2 and the x-axis

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd