Explain data collection, Software Engineering

Assignment Help:

Data collection

A metrics programme should be based on a set of product and process data.

Data should be collected immediately (not in retrospect) and, if possible, automatically.

Three types of automatic data collection

  • Static product analysis;
  • Dynamic product analysis;
  • Process data collation.

 


Related Discussions:- Explain data collection

What is code coverage and code inspection, What is Code Coverage and Code I...

What is Code Coverage and Code Inspection - This is an analysis method which verifies which parts of the software have already been covered by the test case suite and which are

What are the advantages and disadvantages of big-bang, What are the advanta...

What are the advantages and disadvantages of big-bang? Advantages: This approach is easy. Disadvantages: It is difficult to debug.It is not easy to isolate errors whereas te

State the system engineering hierarchy, State the System Engineering Hierar...

State the System Engineering Hierarchy? The world view is composed of a set of domains (Di), which can each be a system, or system of systems. WV = {D1,D2,D3,...........,Dn}

What is boundary data- Test data, What is boundary data- Test data Ex...

What is boundary data- Test data Extreme/boundary data -  This is data at the limits of validity/acceptability (for instance, if a date is being input, two values at the

What is usability, What is Usability? Ans) "Usability" means simple of u...

What is Usability? Ans) "Usability" means simple of use; the simple with which a user can learn to control, prepare inputs for, and intended the outputs of a software product.

Iterative enhancement and evolutionary development model, Q. Differentiate ...

Q. Differentiate between iterative Enhancement Model and Evolutionary Development model. Ans. Iterative Enhancement Model: This model has the similar phases as the waterfall

What is stochastic testing, Stochastic testing is the similar as "monkey te...

Stochastic testing is the similar as "monkey testing", but stochastic testing is a lot more technical sounding name for the similar testing process.

Object oriented concepts used in software engineering, Explain various Obje...

Explain various Object Oriented concepts used in Software Engineering. The concepts of Object Oriented concepts used in Softwar Engineering: Object Class:- Enc

What are the three activities of risk assessment, What are the three activi...

What are the three activities of risk assessment? Ans: The three activities are analyzing, identifying and giving priorities. Risks are able to be identified by a check list

What is parallel/audit testing, Parallel/audit testing is testing where the...

Parallel/audit testing is testing where the user reconciles the output of the latest system to the output of the present system to determine the new system performs the operations

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd