Explain cost savings by cutting the current price, Operation Management

Assignment Help:

A company has a new design for their product in next year that can reduce their material cost of producing units from $8.14 to $7.32. The company passes on half of all cost savings by cutting the current price to customers. For simplicity: - Use current labour costs of $4.15

Assume all period costs as reported on the Income Statement (Annual Rpt Pg 2) will remain the same.

Determine how many units (000) of the product would need to be sold next round to break even on the product.

Select: 1

1,050 units.

0 units.

993 units.

1,114 units.

1,366 units.


Related Discussions:- Explain cost savings by cutting the current price

Define the importance of management systems, 1. Propose a definition of inn...

1. Propose a definition of innovation in your own words (50-100 words). 2. Compare the concepts of innovation, invention, and creativity. 3. Describe the relationship between

Explain what are the minimum and maximum cycle times, An assembly line with...

An assembly line with 17 tasks is to be balanced. The longest task is 2.1 minutes, and the total time for all tasks is 23 minutes. The line will operate for 480 minutes per day. a.

Explain theory x, Explain Theory 'X'. These theory is place forward by ...

Explain Theory 'X'. These theory is place forward by Douglas McGregor. It is based upon the management thinking containing certain assumptions about human nature and human beha

Explain appropriate technique to develop a forecast, Air travel on Mountain...

Air travel on Mountain Airlines for the past 18 weeks was: Week Passengers Week Passengers 1 406 10 440 2 410 11 446 3 420 12 451 4 415 13 455 5 412 14 464 6 420 15 466 7 424 16 47

Explain concerns for product design in a dfma program, Name and briefly des...

Name and briefly describe the four primary concerns for product design in a DFMA program.

Explain an engine system consists of three main components, An engine syste...

An engine system consists of three main components in a series, all having the same reliability. Determine the level of reliability required for each of the components if the engin

Describe the advantages of the various methods of data, Describe the advant...

Describe the advantages and disadvantages of the various methods of data collection.

Explain the term objective or necessity in management, Explain the term obj...

Explain the term objective or necessity. Objective or Necessity: The objective or the need of permitting workers to participate in management can be: (i) To attain industr

Green supply chain management, what is the meaning of green sipply ...

what is the meaning of green sipply chain managent and is it applied in production process

Total and partial factor productivity measurements, Total and Partial Facto...

Total and Partial Factor Productivity Measurements  Total factor productivity (TFP) is the best measure when describing national productivity, because it includes all the inpu

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd