Explain chlorine residuals, Civil Engineering

Assignment Help:

Explain Chlorine Residuals

Free Chlorine Residuals: Cl2, HOCl, OCl-  

Combined Chlorine Residuals: Chloramines (mono, di and tri chloramines)

The disinfecting ability of chloramines is much lower than that of free chlorine.

Satisfactory results can be obtained if a free chlorine residual of 0.2 to 0.5 mg/L can be maintained in the distribution system. Also if approved by health authorities  combined chlorine residuals in the range of 1 to 2 mg/L should maintained at distant points in the distribution system.    

 Trihalomethanes (the following) which are formed as a result of chlorination are harmful and this must be avoided.

CHCl3 trichloromethane (chloroform)

CHBrCl2  bromodichloromethane

CHBr2Cl dibromochloromethane

CHBr3   tribromomethane (bromoform)


Related Discussions:- Explain chlorine residuals

Construct the shear force and bending moment diagrams, A Beam A B 12 meter ...

A Beam A B 12 meter long rests on supports 9 meter apart the right hand end over hanging the supports by 1 m and the left hand end by 2 m . The beam carries a uniformity distribute

Explain the term - loss of prestress, Explain the term - Loss of Prestress ...

Explain the term - Loss of Prestress At the transfer stage, tendons produce compressive stresses in concrete. Sooner or later, the magnitude of  these stresses experiences a re

What is activated sludge process, Q. What is Activated Sludge process? ...

Q. What is Activated Sludge process? The term Activated Sludge is used to indicate the sludge which is obtained by settling sewage in presence of abundant oxygen. The Activated

Concrete technology, what is the actual quantity of water to be mixed in va...

what is the actual quantity of water to be mixed in various grade of concrete and also the size of gravel to be mixed with in RCC work. Also I want to know the difference between a

Geotech, soil sample investigation

soil sample investigation

Wet mix macadam - road pavements, Wet Mix Macadam: For heavily traffi...

Wet Mix Macadam: For heavily trafficked highways, the granular bases are constructed using Wet Mix Macadam (WMM). The WMM is a specification in which well graded aggregate is

Calculate the percent grade of line, 1. The topography of a local valley is...

1. The topography of a local valley is shown. The horizontal distance between point P and Q is 11,456-ft. The percent grade (%) of line P-Q .     2. Based on the info

Main advantages of using rubber dams, Question In assortment of dams in...

Question In assortment of dams in drainage channels, what are the main advantages of using rubber dams instead of steel-gate dams ? Answer Key Advantages of rubber d

Return period for design situations, Question While design life will it...

Question While design life will it be same as return period for design situations ? Answer Design life means least duration a structure is accepted to last. Longe

Mechanics of solid, determine the end slope and deflection in the beam

determine the end slope and deflection in the beam

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd