Q. Explain about Vierendeel girder?
Vierendeel girder design is sometimes adopted in design of footbridges. Traditionally truss design, triangular shape of truss is generally used since the shape can't be changed without altering the length of its members. By applying loads only to joints of trusses, members of truss are only subjected to a uniform tensile or compressive stress across their cross sections since their lines of action pass through a common hinged joint.
Vierendeel girder/truss is characterized by having only vertical members between the top and bottom chords and is a statically indeterminate structure. Therefore bending, shear and axial capacity of these members contribute to resistance to external loads. The use of this girder enables footbridge to span larger distances and present an attractive outlook. Though it suffers from the disadvantage that distribution of stresses is more complicated than normal truss structures.
Fig.Vierendeel Truss.
what is stone lime shall lime and kankar lime
Q. Write short note on Stock Verification? It is desirable that there should be a frequent reconciliation of the balances as shown in the numerical ledgers kept by the subordin
In bridge widening projects, means of stitching is normally employed for connecting existing deck to a new deck. What are the problems that occur connected with this process in ter
Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by
about plane table traversing
looking for someone good at structure analysis and design courswork
Retardation of fresh concrete has numerous benefits as below: (i) A rapid hydration process leads to loss in concrete strength since concrete will have a poorer structure with
A retaining wall is battered away from the fill from bottom to top at an angle of 15° with the vertical. Height of the wall is 6 m. The fill slopes upwards at an angle 15° away fro
what is motor cycle. please explain.
Q. Necessity of air voids in bituminous pavement? If the presence of air voids is too high, it results in an increase of permeability of bituminous pavement. This enables the f
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd