Q. Explain about Unit pipe racks?
Unit pipe racks are the main arteries carrying the pipes and cables into the units, and as such should be centrally located. They are usually elevated, and are of sufficient height to allow vehicle access beneath. The width of rack will be determined by the number of lines and cable trays with an allowance for future requirements.
Piping should enter/leave from above or below the rack level. Piping should not flat turn on or off the rack closing out space for installation of future lines. Lines requiring expansion loops should be located close to pipe rack columns and should be grouped together to enable use of common supports. Space between levels must be sufficient to allow the largest lines to leave or enter the rack.
Electrical and instrument cable trays are normally run in or off the side of the pipe racks. The Piping Designer shall liaise with these disciplines to allocate these areas. Cable trays systems shall be kept away from hot lines. When there are large numbers of cable trays, they should be installed at the highest levels of the rack and process pipes should not be crossing or running above them.
Q. Combustion Chamber and Radiant Section? The combustion chamber and the radiant heat transfer section of the Steam Generators shall be a horizontal, multiple pass arrangement
Find the Location of the Centroid a) Write the integrals for the determination of the location of the centroid of the area shown in Figure-(a). Only set up the integral.
Q. Piping Inspection and Test Plan? Piping Inspection and Test Plan review and Piping Materials Test Results review shall be by the Piping Materials group, or by / with assista
trend monitoring in cbm
The objective of the project is to protect damage of the DC motors. If the motor is not working it will be shown with red light, if working normally then green and if working at a
Modal Dispersion in Step-Index Fibers Determine the core radius of a multi-mode step index fiber with a numerical aperture NA = 0.1 if the number of modes M = 5000 when the wave
Q. Safety and Loss Prevention? Are there special venting requirements for flammables and toxic materials? Air conditioning, heating and ventilation: • are non-sparking fa
Q. Standard factory formed insulation on Flanges and Valves? All fittings are to be insulated with standard factory formed insulation. All joints shall be buttered and sealed.
ELECTRON BEAM WELDING PROCESS AND ITS APPLICATIONS Electron Beam Welding (EBW) is one of the advanced welding technologies required for the precision welding applications
rankine hypothesis of critical load for columns
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd