Q. Explain about Unit pipe racks?
Unit pipe racks are the main arteries carrying the pipes and cables into the units, and as such should be centrally located. They are usually elevated, and are of sufficient height to allow vehicle access beneath. The width of rack will be determined by the number of lines and cable trays with an allowance for future requirements.
Piping should enter/leave from above or below the rack level. Piping should not flat turn on or off the rack closing out space for installation of future lines. Lines requiring expansion loops should be located close to pipe rack columns and should be grouped together to enable use of common supports. Space between levels must be sufficient to allow the largest lines to leave or enter the rack.
Electrical and instrument cable trays are normally run in or off the side of the pipe racks. The Piping Designer shall liaise with these disciplines to allocate these areas. Cable trays systems shall be kept away from hot lines. When there are large numbers of cable trays, they should be installed at the highest levels of the rack and process pipes should not be crossing or running above them.
how to calculate the mean effective pressure of a dual cycle
how it works
Determine ratio between mass flow rate to condensing steam: In steam power plant, the steam 0.1 bar and 0.95 dry enters condenser and leaves as saturated liquid at 0.1 bar an
vibration via footpegs and handlebars.
Determine the maximum permissible eccentricity of the load: A small hollow cylindrical column carries a compressive force of 400 kN. The external diameter of the column is 200
We shutdown our furnace and always encountered crack on our piping at the weld joints. I investigated that upon shutdown the furnace cracking, our maintenance immediately remove th
Q. What is Boiler feedwater? The boiler feedwater will be a mixture of desalinated water, treated make-up water and returned condensate, deaerated and heated, supplied by other
Q. Ultrasonic Examination? Ultrasonic examination, UT and the acceptance criteria shall be in accordance with the Code and performed in accordance with written procedures. W
please help me with this project
calculate stress intensity factor
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd