Q. Explain about Unit pipe racks?
Unit pipe racks are the main arteries carrying the pipes and cables into the units, and as such should be centrally located. They are usually elevated, and are of sufficient height to allow vehicle access beneath. The width of rack will be determined by the number of lines and cable trays with an allowance for future requirements.
Piping should enter/leave from above or below the rack level. Piping should not flat turn on or off the rack closing out space for installation of future lines. Lines requiring expansion loops should be located close to pipe rack columns and should be grouped together to enable use of common supports. Space between levels must be sufficient to allow the largest lines to leave or enter the rack.
Electrical and instrument cable trays are normally run in or off the side of the pipe racks. The Piping Designer shall liaise with these disciplines to allocate these areas. Cable trays systems shall be kept away from hot lines. When there are large numbers of cable trays, they should be installed at the highest levels of the rack and process pipes should not be crossing or running above them.
Solid Modeling: 3-D solid modelling techniques provide the user along with complete information regarding the model. These may be quickly created without having to describe in
Explain the Advantages of Automation 1. There is an increase in productivity. 2. The unit cost is reduced as larger number of components can be manufactured in shorter time
what is the application of the rank order clustering
what is cross head velocity
The resultant moment M acts through the centroid of the aluminum strut, inclined as shown. (a) Determine the orientation of the neutral axis and show the neutral axis on a sket
‘coefficient of insensitiveness’ of governors
ENTHALPE
Once vendor drawings are received and piping isometric drawings are prepared, the Mechanical engineer will provide a final stress package to the stress engineer per The stress a
Product Definition Data Interface (PDDI) IGES provided a very practical first solution for CAD data exchange, complete with an exchange file format. It was remarkable in the sp
The maximum stress in each material: A copper tube of external diameter 60 mm and internal diameter 40 mm is closely fitted to a steel rod of 40 mm diameter to compose a compo
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd