Explain about unit pipe racks, Mechanical Engineering

Assignment Help:

Q. Explain about Unit pipe racks?

Unit pipe racks are the main arteries carrying the pipes and cables into the units, and as such should be centrally located. They are usually elevated, and are of sufficient height to allow vehicle access beneath. The width of rack will be determined by the number of lines and cable trays with an allowance for future requirements.

Piping should enter/leave from above or below the rack level. Piping should not flat turn on or off the rack closing out space for installation of future lines. Lines requiring expansion loops should be located close to pipe rack columns and should be grouped together to enable use of common supports. Space between levels must be sufficient to allow the largest lines to leave or enter the rack.

Electrical and instrument cable trays are normally run in or off the side of the pipe racks. The Piping Designer shall liaise with these disciplines to allocate these areas. Cable trays systems shall be kept away from hot lines. When there are large numbers of cable trays, they should be installed at the highest levels of the rack and process pipes should not be crossing or running above them.


Related Discussions:- Explain about unit pipe racks

Desirable characteristics of the piston , Desirable Characteristics of the ...

Desirable Characteristics of the Piston Silent in operation. Seizure between piston surface and inside of cylinder should not occur. Sufficiently resistant to co

Explain working of plate heat exchangers, Q. Explain working of plate heat ...

Q. Explain working of plate heat exchangers? For gasket plate heat exchangers handling flammable materials, the same spacing requirements for air coolers should be applied. If

Strength of materials advanced, need help with reports on thin thick and co...

need help with reports on thin thick and combined cylinder theory

Surging, what is surging in turbo machines subject

what is surging in turbo machines subject

Need for electron beam welding(ebw) process, NEED FOR ELECTRON BEAM WELDING...

NEED FOR ELECTRON BEAM WELDING(EBW) PROCESS   The major advantage resulting from the use of a vacuum environment with a working pressure of from 10 -5 to 10 -3 mbar is esp

Waste water treatment, Q. Waste Water Treatment? Typically, there are a...

Q. Waste Water Treatment? Typically, there are a number of waste water streams which need to be treated before disposal to land or water. Depending on the nature of contaminati

Describe electron beam welding, Discuss any three of the following:- (i)...

Discuss any three of the following:- (i) Electron Beam Welding (ii) Friction Welding (iii) Thermit Welding (iv) Gas Welding Give their advantages, Limitations, and a

Find out the centre of gravity of a wire, Find out the centre of gravity of...

Find out the centre of gravity of a wire: Find out the C. G. of a wire of uniform cross-section bent into shape of a semicircle as illustrated in Figure. Solution

Calculate the vertical deflection - cantilever, Calculate the vertical defl...

Calculate the vertical deflection: Calculate the vertical deflection at the tip of the cantilever shown in Figure Figure Solution Measuring the distance x f

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd