Q. Explain about Unit pipe racks?
Unit pipe racks are the main arteries carrying the pipes and cables into the units, and as such should be centrally located. They are usually elevated, and are of sufficient height to allow vehicle access beneath. The width of rack will be determined by the number of lines and cable trays with an allowance for future requirements.
Piping should enter/leave from above or below the rack level. Piping should not flat turn on or off the rack closing out space for installation of future lines. Lines requiring expansion loops should be located close to pipe rack columns and should be grouped together to enable use of common supports. Space between levels must be sufficient to allow the largest lines to leave or enter the rack.
Electrical and instrument cable trays are normally run in or off the side of the pipe racks. The Piping Designer shall liaise with these disciplines to allocate these areas. Cable trays systems shall be kept away from hot lines. When there are large numbers of cable trays, they should be installed at the highest levels of the rack and process pipes should not be crossing or running above them.
what is factor of safty
in orthographic projection why in quadrant is taken in anticlock wise
state and prove varigan theorm?
Material Selection and Process Mapping Selecting an optimal material from numerous candidates in one competitive aspect of manufacturing depends on factors such as properties,
how water turbine workes
Calculate Machining Time and Material Removal Rate A hole of 40 mm diameter and 50 mm depth is to be drilled in a mild steel component. The cutting speed can be taken as 65 m/
System of parallel forces: A rigid body is subjected to system of parallel forces as shown in the figure. Reduce this system to, ( i ) A single force system ( i
Planning of Railway Stations and Facilities Provided: The planning of railway stations should cover the following aspects: (a) The site selected should be easily ac
CLASSIFICATION OF POWER SOURCES ACCORDING TO CONSTRUCTION & DESIGN To give the desired output a power source may be constructed with different components. Therefore, a classifi
Industrial applications of ultrasonics-cleaning, welding, soldering, drilling
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd