Explain about unit pipe racks, Mechanical Engineering

Assignment Help:

Q. Explain about Unit pipe racks?

Unit pipe racks are the main arteries carrying the pipes and cables into the units, and as such should be centrally located. They are usually elevated, and are of sufficient height to allow vehicle access beneath. The width of rack will be determined by the number of lines and cable trays with an allowance for future requirements.

Piping should enter/leave from above or below the rack level. Piping should not flat turn on or off the rack closing out space for installation of future lines. Lines requiring expansion loops should be located close to pipe rack columns and should be grouped together to enable use of common supports. Space between levels must be sufficient to allow the largest lines to leave or enter the rack.

Electrical and instrument cable trays are normally run in or off the side of the pipe racks. The Piping Designer shall liaise with these disciplines to allocate these areas. Cable trays systems shall be kept away from hot lines. When there are large numbers of cable trays, they should be installed at the highest levels of the rack and process pipes should not be crossing or running above them.


Related Discussions:- Explain about unit pipe racks

Calculate the maximum stress, Determine the analytical solution for the max...

Determine the analytical solution for the maximum stress in the member shown. Submit screen shots that show the shape of the elements that result with a global element size of 0.15

Explain about active fire protection, Q. Explain about Active Fire Protecti...

Q. Explain about Active Fire Protection? Active Fire Protection - A fire fighting system that is normally dormant and is activated automatically upon detection of a fire hazard

Beam along the centreline, Determine the vertical de?ection in the beam alo...

Determine the vertical de?ection in the beam along the centreline and state the maximum de?ection.

Layout of vessels in plant design, Q. Layout of vessels in plant design? ...

Q. Layout of vessels in plant design? Layout of vessels needs to allow sufficient spacing for instruments, piping, operations, maintenance and firefighting access. Vessels o

MATERIAL SCIENCE, IF ONE SOLID PHASE SPLITS INTO TWO SOLID PHASES ON HEATIN...

IF ONE SOLID PHASE SPLITS INTO TWO SOLID PHASES ON HEATING THE REACTION IS CALLED

Concurrent force system - mechanics, Concurrent force system: It state...

Concurrent force system: It state that if force acting at a point on a rigid body, it can be considered to act at any other point on its line of action, given this point is ri

Fuel and steam generator, Boiler efficiency and heat losses, heat Balence s...

Boiler efficiency and heat losses, heat Balence sheet, boiler draught, high pressure boiler

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd