Explain about unit pipe racks, Mechanical Engineering

Assignment Help:

Q. Explain about Unit pipe racks?

Unit pipe racks are the main arteries carrying the pipes and cables into the units, and as such should be centrally located. They are usually elevated, and are of sufficient height to allow vehicle access beneath. The width of rack will be determined by the number of lines and cable trays with an allowance for future requirements.

Piping should enter/leave from above or below the rack level. Piping should not flat turn on or off the rack closing out space for installation of future lines. Lines requiring expansion loops should be located close to pipe rack columns and should be grouped together to enable use of common supports. Space between levels must be sufficient to allow the largest lines to leave or enter the rack.

Electrical and instrument cable trays are normally run in or off the side of the pipe racks. The Piping Designer shall liaise with these disciplines to allocate these areas. Cable trays systems shall be kept away from hot lines. When there are large numbers of cable trays, they should be installed at the highest levels of the rack and process pipes should not be crossing or running above them.


Related Discussions:- Explain about unit pipe racks

Relativity of simultaneity, Relativity of simultaneity Two events occur...

Relativity of simultaneity Two events occurring at different space co-ordinates x 1  and x 2  in an inertial frame S, are said to be simultaneous, if they occur at the same tim

Selecting dimension commands-autocad, Selecting Dimension Commands    ...

Selecting Dimension Commands                                            The Linear Dimension Commands As the name suggests the Linear dimension commands are used to

Open coiled helical spring, Open coiled helical spring: In an open coi...

Open coiled helical spring: In an open coiled helical spring along with α = 38 o , if the inclination of the coil is ignored, determine the percentage by which the axial exten

What is the aim of pdes, What is the aim of PDES The aim of PDES is to ...

What is the aim of PDES The aim of PDES is to provide an interface which permits the exchange of data of the entire product development cycle and production cycle, see also PDE

Solids of mechanics, Derive the equation for pure bonding of beam (simply)

Derive the equation for pure bonding of beam (simply)

Shielding gas, SHIELDING GAS The primary function of the shielding gas ...

SHIELDING GAS The primary function of the shielding gas is to exclude the atmospheric air from the arc zone. However, the shielding gas has significant influence on the arc cha

Moments and forces, 3. A string of length l is fastened to two point A and ...

3. A string of length l is fastened to two point A and B at the same level at a distance ‘a’ apart. A ring of weight W can slide on the string and a horizontal force P is applied s

Explain milling fixture, Explain Milling Fixture? A milling fixture...

Explain Milling Fixture? A milling fixture is a work holding device which is firmly clamped to the table of milling machine. It holds the work piece in correct position as

Annotation with leaders, Annotation with Leaders Ordinate dimensions ar...

Annotation with Leaders Ordinate dimensions are not really an dimensions at all in that they do not indicate a measurement.They annotate known as a co-ordinate points. The DIMO

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd