Unit pipe racks are the main arteries carrying the pipes and cables into the units, and as such should be centrally located. They are usually elevated, and are of sufficient height to allow vehicle access beneath. The width of rack will be determined by the number of lines and cable trays with an allowance for future requirements.

Piping should enter/leave from above or below the rack level. Piping should not flat turn on or off the rack closing out space for installation of future lines. Lines requiring expansion loops should be located close to pipe rack columns and should be grouped together to enable use of common supports. Space between levels must be sufficient to allow the largest lines to leave or enter the rack.

Electrical and instrument cable trays are normally run in or off the side of the pipe racks. The Piping Designer shall liaise with these disciplines to allocate these areas. Cable trays systems shall be kept away from hot lines. When there are large numbers of cable trays, they should be installed at the highest levels of the rack and process pipes should not be crossing or running above them.


Related Discussions:- Explain about unit pipe racks

Objectives of motorcycle servicing , Objectives After studyingmotercyc...

Objectives After studyingmotercycle servicing, you should be able to appreciate the importance of regular servicing and maintenance of a motorcycle and also to recommen

Working of boiler, Working of boiler : Water is filled in boiler ...

Working of boiler : Water is filled in boiler shell through the feed valve up to 2/3 rd of shell. Water flows down through the down take header by means of descending wa

Evaluate the air standard efficiency of the cycle, (a) Derive a mathematica...

(a) Derive a mathematical expression for the efficiency of a dual cycle. (b) An oil Engine working on a dual combustion cycle has a compression ratio 10 and cut-off takes place

Wrking cran, this is a problem for designing wrecking crane. there are 2 sc...

this is a problem for designing wrecking crane. there are 2 scenarios, one is when ball is held and one where its at maximum. i calculated the loads and now need to find the follow

Discover the fixing torques set up at the ends of the shaft, Discover the f...

Discover the fixing torques set up at the ends of the shaft: A solid shaft 6.5 m long is securely fixed at each of the end. A torque of 91 Nm is applied to the shaft at a sect

Cnc lathe job clamping system, can we use electrical power chuck for job cl...

can we use electrical power chuck for job clamping in cnc lathe.what are the issues related

Ratio of belt tension, Prove that the ratio of belt tension is given by the...

Prove that the ratio of belt tension is given by the T 1 / T 2   = e μθ Let  T1 = Tension in belt on the tight side T2 = Tension in belt on the slack side θ = Angle

Cylinder series test, Cylinder Series Test A series of round bars of ...

Cylinder Series Test A series of round bars of various diameters are austenitized and quenched into oil or water. The bars are long sufficient hence the cooling of section at

V pulley design, #wHAT WILL BE THE PULLEY CRITERIA TO DECIDE THE RPM

#wHAT WILL BE THE PULLEY CRITERIA TO DECIDE THE RPM

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd