Q. Explain about Unit pipe racks?
Unit pipe racks are the main arteries carrying the pipes and cables into the units, and as such should be centrally located. They are usually elevated, and are of sufficient height to allow vehicle access beneath. The width of rack will be determined by the number of lines and cable trays with an allowance for future requirements.
Piping should enter/leave from above or below the rack level. Piping should not flat turn on or off the rack closing out space for installation of future lines. Lines requiring expansion loops should be located close to pipe rack columns and should be grouped together to enable use of common supports. Space between levels must be sufficient to allow the largest lines to leave or enter the rack.
Electrical and instrument cable trays are normally run in or off the side of the pipe racks. The Piping Designer shall liaise with these disciplines to allocate these areas. Cable trays systems shall be kept away from hot lines. When there are large numbers of cable trays, they should be installed at the highest levels of the rack and process pipes should not be crossing or running above them.
Q. Explain about Fired Heaters and Combustion Engines? Fired heaters and combustion engines shall normally be located at a safe distance from hazardous areas as they provide po
The space truss is supported by a ball-and-socket joint at D and short links at C and E. Determine the force and stress in each member and state if the members are buckle or
kinds of machine tempering
Hazardous Waste and Material Standards Each hazardous site must be examined and evaluated for its characteristics before workers are allowed entry. This will pre decide an
A single phase series resistive-inductive heating element draws a measured current of 15A when connected to a 225V single phase 50 Hz AC supply. Tests have shown that a minimum
What are the Constructional Aspects of Well Foundations There are several aspects which require careful consideration during sinking of well foundations. They are i) Prepa
significance & relevance of lubrication
Ask qu1. A small maintenance project consists of the following 10 jobs, whose precedence relationships are identified by their node numbers: JOB NODE NUMBERS ESTIMATED DURATION (DA
Q. What is Clad plate and overlay welding? Strip back cladding on clad plate a minimum of 5 mm (3/16") from the edges of weld preparation before welding on the backing plate.
Austempering: The component to be hardened is initialy austenised and after that quenched into a lead or salt bath held at just over the martensite transformation temperature
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd