Unit pipe racks are the main arteries carrying the pipes and cables into the units, and as such should be centrally located. They are usually elevated, and are of sufficient height to allow vehicle access beneath. The width of rack will be determined by the number of lines and cable trays with an allowance for future requirements.
Piping should enter/leave from above or below the rack level. Piping should not flat turn on or off the rack closing out space for installation of future lines. Lines requiring expansion loops should be located close to pipe rack columns and should be grouped together to enable use of common supports. Space between levels must be sufficient to allow the largest lines to leave or enter the rack.
Electrical and instrument cable trays are normally run in or off the side of the pipe racks. The Piping Designer shall liaise with these disciplines to allocate these areas. Cable trays systems shall be kept away from hot lines. When there are large numbers of cable trays, they should be installed at the highest levels of the rack and process pipes should not be crossing or running above them.
Find out the centre of gravity of solid sphere: Find out the C. G. of a body formed by a solid sphere placed over a solid cylinder of similar radius a as illustrated in Figure
Fifth Service and Sixth Service Following extra mandatory checks are required during the fifth service of a 125 cc motorcycle : Inspect engine oil and top up as re
three vertical, parallel straight rods, each 2.6m in length have their upper ends firmly secured and their lower supporting a rigid horizontal bar with a weight of 8KN, which cause
diference between thermal and thermodynamic equallibrim
The Make Group of Euler Operators The Make group consists of four operators for adding some elements into the existing model creating a new one, and a Make-Kill operator for ad
constructing and working of he- ne laser
Two mating spur gear with module pitch of 6.5 mm have 19 and 47 teeth of 20 degree pressure angle, and 6.5 mm addendum. Evaluate the number of pairs of teeth in contact and the ang
velocity of belt: velocity of belt passing over the driver pulley will decrease Now with this velocity belt pass over driven pulley, Now Velocity of Driven = Velocity
Q. What are the basic use of Sand rammer? It is the apparatus of make specimens of moulding sand, for tests such as - permeable test, the various strength tests, and shatter te
Internal Energy (U): It is the energy possessed by the system on account of its configurations, and motion of atoms and molecules. Not like potential energy and kinetic energy
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd