Explain about overhauling of level xing, Civil Engineering

Assignment Help:

Q. Explain about Overhauling of Level xing?

Each level crossing except those laid with PSC sleepers must be opened out and the condition of sleepers and fittings, rails and fastenings inspected at least once a year or more frequently, as warranted by conditions. However, level crossings laid with PSC sleepers should be overhauled with each cycle of machine packing or more frequently as warranted by conditions and in no case shall opening be delayed by more than two years. In all cases, rails and fastenings in contact with the road shall be thoroughly cleaned with wire brush and a coat of coal tar/anti-corrosive paint applied. Flange way clearances, cross level, gauge and alignment should be checked and corrected as necessary, and the track packed thoroughly before reopening the level crossing for road traffic.


Related Discussions:- Explain about overhauling of level xing

Explain the properties of poly tetra fluoro ethylene, Explain the Propertie...

Explain the Properties of Poly Tetra Fluoro Ethylene? PTFE is a linear chain polymer of great molecular strength, known for its chemical inertness and low coefficient of fricti

Stone, Explain the crushing strength test

Explain the crushing strength test

Whole base of mat, Question In modeling a nonrigid mat foundation by us...

Question In modeling a nonrigid mat foundation by using elastic springs, have a uniform modulus of subgrade reaction be used along whole base of mat ? Answer A bed of

Mechanics, What is the parallelogram law of force and prove it?

What is the parallelogram law of force and prove it?

Find a suitable slab thickness, The continuous one-way slab shown below is ...

The continuous one-way slab shown below is loaded with a uniform service live load of 80 psf, and a superimposed dead load of 40 psf. Assume the beam width is 16" and use f'c = 5 k

What do you mean by river gauging, Q. What do you mean by River Gauging? ...

Q. What do you mean by River Gauging? Due to certain behavior of rivers the problem of gauging then is quit complex. The purpose of river gauging is to stabilize the river chan

Physics, interplanar spacing

interplanar spacing

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd