Q. Explain about Best hydraulic section?
The best hydraulic section of an open channel is considered by provision of maximum discharge with a given cross sectional area. Channels with circular shape is the best hydraulic sections whereas a rectangular channel with channel width being equal to two times the height of channel is the best hydraulic section amongst all rectangular sections. Actually the choice of best hydraulic section also possesses other benefits than hydraulic performance. For example for a given discharge rate use of best hydraulic section could assure the least cross sectional area of the channels. Considerable savings could be made from the reduction in the amount of excavation and from the useof less channel linings.
Determine the area ratio of a thin walled tube samples having an external diameter of 6 cm and a wall thickness of 2.25 mm. Do you recommend the sampler for getting undisturbed soi
In a specific gravity test, 1.17 N of oven-dired soil was taken. The weight of pyknometer, soil and water was obtained as 6.51 N. The weight of pyknometer full of water alone was 5
Determine about the post-tensioned concrete The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling th
Preparation for Underwater Inspection - Availability of Tools and Equipment The engineer-in-charge, before taking up the inspection, should list out the complete equipment req
Example for Productivity Analysis and Improvement An excavator with a bucket capacity of 3-yd 3 has a standard production rate of 2,160-yd 3 for an 8-hour day. The job site
Los Angeles Abrasion Test: In which the aggregates are placed in a rotating drum in which a certain number of cast iron cylindrical balls are also placed, and the drum rotated
what are the 2 principle factors affecting the allowable bearing pressure in the design of a specific footing
from surveying to school building finish
The local survey crew measures a distance of 1,135 ft of new drainage pipe that is required for the new road construction. The beginning point for the drainage is located at statio
kaltile joint
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd