Explain about best hydraulic section, Civil Engineering

Assignment Help:

Q. Explain about Best hydraulic section?

The best hydraulic section of an open channel is considered by provision of maximum discharge with a given cross sectional area. Channels with circular shape is the best hydraulic sections whereas a rectangular channel with channel width being equal to two times the height of channel is the best hydraulic section amongst all rectangular sections. Actually the choice of best hydraulic section also possesses other benefits than hydraulic performance. For example for a given discharge rate use of best hydraulic section could assure the least cross sectional area of the channels. Considerable savings could be made from the reduction in the amount of excavation and from the useof less channel linings.


Related Discussions:- Explain about best hydraulic section

Aashto method, Question 1: A stationary 40 kN single axle load (applied on...

Question 1: A stationary 40 kN single axle load (applied on a circular contact area of radius = 152 mm = 6") is applied to each of the flexible pavement structures indicated below

High and narrow beams, Question Give a reason that why are high and na...

Question Give a reason that why are high and narrow beams not desirable in concrete piers? Answer Supported on past experience in other, high and narrow beams after

structure analysis 2, what is ild for indeterminate beam and explain its p...

what is ild for indeterminate beam and explain its procedure

Define surface communication-underwater inspection of bridge, Define Surfac...

Define Surface Communication - Underwater Inspection of Bridge? It is not necessary to have voice communication in all situations, particularly for shallow dives where the dive

Brick, what is fist class brick?

what is fist class brick?

Main problems related with prestressed concrete piles, Question What ar...

Question What are main problems related with prestressed concrete piles ? Answer Origin of Daido piles comes from Japan where these prestressed actual piles are used

Low cost roads connecting villages, Low Cost Roads Connecting Villages: ...

Low Cost Roads Connecting Villages: Problem of Village Connectivity It is estimated that nearly 45 per cent of India's villages are not connected by an all-weather ro

Pumping for concreting works, Question What are the key problems if use pu...

Question What are the key problems if use pumping for concreting works ? Answer In pumping operation , force exerted by pumps have to overcome friction involving concrete an

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd