Explain about best hydraulic section, Civil Engineering

Assignment Help:

Q. Explain about Best hydraulic section?

The best hydraulic section of an open channel is considered by provision of maximum discharge with a given cross sectional area. Channels with circular shape is the best hydraulic sections whereas a rectangular channel with channel width being equal to two times the height of channel is the best hydraulic section amongst all rectangular sections. Actually the choice of best hydraulic section also possesses other benefits than hydraulic performance. For example for a given discharge rate use of best hydraulic section could assure the least cross sectional area of the channels. Considerable savings could be made from the reduction in the amount of excavation and from the useof less channel linings.


Related Discussions:- Explain about best hydraulic section

Surveying, Describe the two fundamental purpose of surveying.

Describe the two fundamental purpose of surveying.

Distinguish among active and passive earth pressure, Distinguish among  'ac...

Distinguish among  'active' and 'passive' earth pressure. Describe clearly Rebhann's graphical construction method to evaluate the earth pressure on a retaining wall. What are t

1, which Subject that wants civil engineers?

which Subject that wants civil engineers?

Determine condition of activity in the network flow diagram, Determine the ...

Determine the condition of each activity in the network flow diagram shown below   Ans: a. Activity C can be started only after the completion of activities A and

Surveying, What''re the procedures of contouring by graphical interpolation...

What''re the procedures of contouring by graphical interpolation

Principle for conducting surface regularity test, Question What is dist...

Question What is distinction in principle for conducting surface regularity test and sand test? Answer Purpose of surface regularity test is to assess riding quality

Basic, what you mean by civil engineering

what you mean by civil engineering

Building Drawing, Illustrate by mean of single line drawing the difference ...

Illustrate by mean of single line drawing the difference between couple truss and couple close truss

Increasing concrete cover beyond contractual, Question If contractor sugges...

Question If contractor suggests increasing concrete cover beyond contractual such as 40mm to 70mm shall engineers accept suggestion? Answer In contractual part, based on requir

Reinforcement, Where we can provided overlap in columns

Where we can provided overlap in columns

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd