Explain a production manager at a contour manufacturing, Operation Management

Assignment Help:

A production manager at a Contour Manufacturing plant has inspected the number of defective plastic molds in five random samples of 30 observations each. Following are the number of defective molds found in each sample:


Sample Number of Defects Number of Observations in Sample

1 2 30
2 0 30
3 1 30
4 0 30
5 2 30

Total 5 150


find
(Round your answers to 2 decimal places, the tolerance is +/-0.01)

CL =
UCL =
LCL

 


Related Discussions:- Explain a production manager at a contour manufacturing

Assignment, Hierarchical planning in operations/production management and t...

Hierarchical planning in operations/production management and types of time frames in each hierarchy

How team structure related to the project managers authority, How is the pr...

How is the project team structure related to the project manager's authority level?

Explain patent infringements, Which of the direct variables help MitiTech w...

Which of the direct variables help MitiTech with its competitive position? a. customers and owners b. suppliers and customers c. competition and customers d. competition and su

Explain current managerial ranks or be sought from outside, Should the plan...

Should the plant manager come from inside the current managerial ranks or be sought from outside?

Explain what is the critical path, The following represents a project that ...

The following represents a project that should be scheduled using CPM: Time (DAYS) Activity Immediate Predecessors a m b A - 1 3 5 B - 1 2 3 C A 1 2 3 D A 2 3 4 E B 3 4 11 F

Define the break-even point for each range, A manager must decide how many ...

A manager must decide how many machines of a certain type to purchase. Each machine can process 100 customers per day. One machine will result in a fixed cost of $2000 per day, whi

Explain use debt financing, If you decide to use debt financing, which kind...

If you decide to use debt financing, which kind of loan, fixed-rate or variable-rate, would you prefer? Why? If you decide to use equity financing, where would you find equity f

Determine the process capability indices and p chart control, 1. If the des...

1. If the design tolerance limits for the process are 9.7/11.2, determine the process capability indices C p and C pk . Comment on the values obtained.  2. 1000 items produced

Explain project manager is normally directly accountable, The project manag...

The project manager is normally directly accountable for the project result, schedule and budget.

Explain what is the multifactor productivity for each system, A grocery cha...

A grocery chain is considering the installation of a set of 4 self-checkout lanes. The new self-checkout lane setup will replace 2 old cashier lanes that were staffed by a cashier

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd