Example Memory to Registers
Example: Write assembly language statement to copy data byte 36H stored at 2025 H to register B.
Solution : Assuming 2025 H is stored in register pair HL and 36 H and 36 stored at this location . the statement is
MOV B, M
Contents of the memory location pointed by HL register pair are copied to registers B.
Illustrates about the power dissipation management in embedded system? Power Dissipation Management a. Clever real-time programming through Wait and Stop instructions b.
Voltage Doubler: The network of Fig. is a half wave voltage doublers. During the positive voltage half cycle across the transformer, secondary diode D 1 conducts, charging ca
Q. What do you mean by diversifiability of total risk? Traditional finance theory assets that the rate of return on risk assets depends on the size of business risk, financial
No-load and blocked-rotor tests are conducted on a three-phase,wye-connected inductionmotor with the following results. The line-to-line voltage, line current, and total input powe
Q. A 25-kVA, 2300:230-V, 60-Hz, single-phase transformer has the following parameters: resistance of high-voltage winding 1.5 , resistance of low-voltage winding 0.015 , leakage
Explain the signals HOLD, READY and SID HOLD indicates that a peripheral such as DMA controller is requesting the use of address bus, data bus and control bus. READY is used to
Why are the operating voltages of a CRT arranged so that the deflection plates are nearly at ground potential?
1. Derive the necessary formula/method to determine the effective value or RMS of a triangular wave. Use either a similar method to the class example of the RMS determination
Q. A magnetic force exists between two adjacent, parallel current-carryingwires. Let I1 and I2 be the currents carried by the wires, and r the separation between them.
A power company is developing an upgrade to an existing power plant and needs to make a requirements decision with respect to the maximum power output capacity for the upgrade. Thi
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd