Evaluate crippling load, Mechanical Engineering

Assignment Help:

A column of timber section 15cm x 20cm is 6 meter long both side being fixed. If the youngs modulus for timber is 17.5 KN/mm2, Evaluate:

a) Crippling load and

b) Safe load for column if factor of safety is 3.


Related Discussions:- Evaluate crippling load

Determine work done per second, A nozzle of 50 mm. dia. delivers a stream o...

A nozzle of 50 mm. dia. delivers a stream of water that strikes a flat plate which is held normal to the axis of stream. If the issuing jet has a velocity of 15 m/sec., determine:

Flash butt welding, Flash Butt Welding The two pieces to be welded are ...

Flash Butt Welding The two pieces to be welded are pressed against each other by applying a pressure. To whatever finish the faces are machined, there will be some protuberance

The gage pressure reading on the pressure gage, The cylindrical tank with h...

The cylindrical tank with hemispherical ends shown in Fig. have volatile liquid and its vapor. The liquid density is 800 kg/m3, and its vapor density is negligible. The pressure in

What is euler operators, What is euler operator Once a polyhedron model...

What is euler operator Once a polyhedron model is available one might want to edit it by adding or deleting vertices, edges and faces to create a new polyhedron. These operatio

Steam engine terminology, STEA M ENGINE TERMINOLOGY: 1 .     Cylind...

STEA M ENGINE TERMINOLOGY: 1 .     Cylinder Bore: Inside diameter of cylinder. 2 .     Cover End and Crank End of cylinder: In the horizontal cylinders the end that

Drum peel strength, what is the dimensions of drum peel strength testing fi...

what is the dimensions of drum peel strength testing fixtures

Define pattern colour code, Q. Define pattern colour code? The patterns...

Q. Define pattern colour code? The patterns are normally painted with contrasting colours such that the mould maker would be able to understand the functions clearly. The colou

Temporary stone scuppers - culverts, Temporary Stone Scuppers: In hil...

Temporary Stone Scuppers: In hill roads, it is customary to cut the roads from the hill-face and to open up the road immediately thereafter to traffic. Further improvements s

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd