Question Would a sub-base layer be served as a drainage layer to take away water from pavement? Answer As well providing load distribution in post-construction stage a
Describe the features of physical survey phase The Physical Survey (field and laboratory test) for the purpose of determination of physical and engineering properties of the ma
what is plastic?its types and composition and its uses as engineering material
The soil in a borrow pit has a void ratio of 0.90. A fill-in-place volume of 20,000 m 3 is to be constructed with an in-place dry density of 18.84 kN/m 3 . If the owner of borr
Question Comparing speed of "Formwork exceeding 300mm wide, horizontal and at any inclination up to and including 5o to horizontal" with speed of "Formwork exceeding 300mm wide, at
Strength of Concrete at the Transfer Stage Concrete strength in the member at the transfer stage should conform to the design requirements. The frequency of the sampling and t
s acceptec
Example : Line AB was drawn with a magnetic bearing of 136° 45′ while the magnetic declination was 2° 30′ east In an old map. If magnetic declination is 3° 30′ west to what m
difination of magnative bearing
Binder: Normally 60/70 penetration grade, and provides cohesion to the mixture and increases its stability. The mix design is done by the Marshall test, in which a specimen
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd