Q. Estimation of design flood discharge?

These methods are also in vogue for estimating maximum discharge. Discharge estimated using the above three methods may be compared with design discharge based on the concept of return period and if the latter is significantly smaller, modification in design discharge figure may be made as considered necessary.

Where a formula has been established or graphs or charts prepared for discharge estimation based on actual hydrological and meteorological considerations, the values given by them may be adopted.

In case of new bridges, a temporary stream gauging station should be set up at or near the bridge site for as long a period prior to the design stage as practicable and gauge and discharge data collected. The highest flood level obtained in the past should be determined by local inquiries. A stage discharge curve should be drawn using the observed data and discharge corresponding to highest known flood level determined by extrapolation of the curve. Preparation and extrapolation of gauge discharge or stage-discharge curve has been dealt with in Chapter 10 on measurement of river water levels and discharge.

Where stage-discharge data cannot be obtained through field observations, a few points along the course of the river indicating the highest flood marks should be determined by local inquiries. The flood slope should be calculated from these marks and the discharge determined by Slope Area method.


Related Discussions:- Estimation of design flood discharge

Simple stresses and strains, Simple stresses and strains: In this simp...

Simple stresses and strains: In this simple stresses and strains you have learnt the concepts of stress, strain, elastic modulus and the primary concepts in application to ana

Explain the statements about the differential levelling, Explain the Statem...

Explain the Statements about the Differential Levelling I.  Bench mark (BM) - relatively permanent point of known elevation as indicated on the Contract drawings  II. Back s

Fy steel, what is the yield stress for reinforcement steel?

what is the yield stress for reinforcement steel?

Terminology of earthquake, TERMINOLOGY 1. Focus: The point on the fau...

TERMINOLOGY 1. Focus: The point on the fault where slip begins is the focus. It is also called as hypocentre 2. Epicentre: The point vertically above the focus on the su

Survey, how can find forebearing

how can find forebearing

PLANKING AND STRUTING FOR SHALLOW EXCAVATION, DEFINITION TYPE STEP OF CON...

DEFINITION TYPE STEP OF CONSTRUCTION STEP OF SAFETY

Define categories of spalls -underwater inspection of bridge, Define catego...

Define categories of Spalls -underwater inspection of bridge? Spalls are classified as follows:  i. Small spalls - up to 25 mm deep or approximately 150 mm in diameter. i

Basic keywords related to road materials, Basic Keywords related to road ma...

Basic Keywords related to road materials: Sub-grade     :            The portion of road embankment immediately below the pavement. Soil Classifications :            A sy

What do you mean by river gauging, Q. What do you mean by River Gauging? ...

Q. What do you mean by River Gauging? Due to certain behavior of rivers the problem of gauging then is quit complex. The purpose of river gauging is to stabilize the river chan

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd