Q. Estimation of design flood discharge?

These methods are also in vogue for estimating maximum discharge. Discharge estimated using the above three methods may be compared with design discharge based on the concept of return period and if the latter is significantly smaller, modification in design discharge figure may be made as considered necessary.

Where a formula has been established or graphs or charts prepared for discharge estimation based on actual hydrological and meteorological considerations, the values given by them may be adopted.

In case of new bridges, a temporary stream gauging station should be set up at or near the bridge site for as long a period prior to the design stage as practicable and gauge and discharge data collected. The highest flood level obtained in the past should be determined by local inquiries. A stage discharge curve should be drawn using the observed data and discharge corresponding to highest known flood level determined by extrapolation of the curve. Preparation and extrapolation of gauge discharge or stage-discharge curve has been dealt with in Chapter 10 on measurement of river water levels and discharge.

Where stage-discharge data cannot be obtained through field observations, a few points along the course of the river indicating the highest flood marks should be determined by local inquiries. The flood slope should be calculated from these marks and the discharge determined by Slope Area method.


Related Discussions:- Estimation of design flood discharge

Write short note on stock verification, Q. Write short note on Stock Verifi...

Q. Write short note on Stock Verification? It is desirable that there should be a frequent reconciliation of the balances as shown in the numerical ledgers kept by the subordin

Define non-carbonate hardness (nch) - water softening, Non-carbonate hardne...

Non-carbonate hardness (NCH) - Water Softening 1. Permanent Hardness, not removed by heating water 2. Ca +2 , Mg +2 combining with ions outside of alkalinity such as Cl -1

Seasoning of timber, Seasoning of Timber It is a process by which moist...

Seasoning of Timber It is a process by which moisture content in a freshly cut tree is reduced to a appropriate level. The durability of timber is increased by doing so. The se

Number of segments for segmental linings in tunnelling, Q. Number of segmen...

Q. Number of segments for segmental linings in tunnelling? For the construction of tunnels by segmental linings, choice of the number of segments affects the durability and cos

Aggregates, list the properties of aggregates

list the properties of aggregates

Residual stresses in steel after welding, Q. Residual stresses in steel aft...

Q. Residual stresses in steel after welding? Considerable residual stresses are persuaded in connecting steel members after welding operation. Local temperature of steel where

Bearing pressure on soil nail, Question What is relation of bearing pr...

Question What is relation of bearing pressure on soil nail head to ratio La/Lb, where La is length of soil nail before potential slip circle as Lb is length of soil nail beyo

PORTAL FRAME, EXPLAIN SITUATION OF THE PORTAL FRAME CAN CAUSE SWAY WITH THE...

EXPLAIN SITUATION OF THE PORTAL FRAME CAN CAUSE SWAY WITH THE AID OF A DIGRAM

Brick, what is fist class brick?

what is fist class brick?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd