Q. Estimation of design flood discharge?
These methods are also in vogue for estimating maximum discharge. Discharge estimated using the above three methods may be compared with design discharge based on the concept of return period and if the latter is significantly smaller, modification in design discharge figure may be made as considered necessary.
Where a formula has been established or graphs or charts prepared for discharge estimation based on actual hydrological and meteorological considerations, the values given by them may be adopted.
In case of new bridges, a temporary stream gauging station should be set up at or near the bridge site for as long a period prior to the design stage as practicable and gauge and discharge data collected. The highest flood level obtained in the past should be determined by local inquiries. A stage discharge curve should be drawn using the observed data and discharge corresponding to highest known flood level determined by extrapolation of the curve. Preparation and extrapolation of gauge discharge or stage-discharge curve has been dealt with in Chapter 10 on measurement of river water levels and discharge.
Where stage-discharge data cannot be obtained through field observations, a few points along the course of the river indicating the highest flood marks should be determined by local inquiries. The flood slope should be calculated from these marks and the discharge determined by Slope Area method.
explain the importance of following standard procedure
Define Collisions - Underwater Inspection of Bridge? Structural damage to underwater portions of a bridge can either be collision related or direct result of a collision. Colli
Construction of Passenger Terminal Building: There are various concepts in planning and constructing passenger terminal buildings. These are : (a) The international
Q. What do you mean by Depth of Scour? The maximum scour depth in a stream can be ascertained when ever possible by actual sounding at or near the site proposed for the bridge
What is Stress Corrosion Stress corrosion takes place in prestressed concrete tendons due to the combined actions of corrosion and static tensile stresses. This type of attack
what type of basin in which is stored and what is silos what is channel and correcting basins what type of clinker is formed
How to calculate Coefficient of permeability
"Mortar mechanism" vs. "stone contact mechanism" in bituminous materials 'Stone contact mechanism' applies to well graded aggregates coated with bitumen (for example dense bit
what is the design of syphon
What is cofferdams
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd