Estimating movement for movement joints, Civil Engineering

Assignment Help:

Question

Should reversible moisture movement be taken into account in estimating movement for movement joints?


Answer

Size of concrete is affected by changes in distinctive humidity- moisture reasons growth although drying causes shrinkage. Such humidity movement is reversible. This is entirely different from aeration shrinkage in which concrete slowly loses humidity during hardening, thus causing irreparable reduction.

In fact, variation of humidity and estimated reversible moisture movement is not significant (about 30 percent) and so, its contribution to group does not validate for group joints .

 


Related Discussions:- Estimating movement for movement joints

Determine the station and elevation of turning point, A -3.00% grade inters...

A -3.00% grade intersects a +1.25% grade at Sta. 85+80 and elevation 210.00 ft.  A 350-ft vertical curve connects the two grades.  Determine the station and elevation of turning po

Major differences between sureties and security, Question What are majo...

Question What are major differences between sureties and security ? Answer During construction contracts, if a contractor fails to carry out works, employer would e

Estimate the size estimating the rcc structures, PART - A 1.  Can you e...

PART - A 1.  Can you enumerate the benefits of individual wall method of estimation? 2.  Estimate the single room of size  3m x 4m x height 3m  using individual wall method?

Dams, The regulations and specifications that followed for compaction works...

The regulations and specifications that followed for compaction works for earth dam in Oman

Tests on bricks, Tests on Bricks The following laboratory tests can be...

Tests on Bricks The following laboratory tests can be conducted on the bricks to find their suitability: 1.    Crushing strength 2.    Absorption 3.    Shape and size

Concrete mixers, what do you mean by buttering mixers

what do you mean by buttering mixers

Cross drainage work, Cross Drainage Work: Several natural streams, ri...

Cross Drainage Work: Several natural streams, rivers and canals cross the road. They have to be led across the road through culverts and bridges. That given structures is kno

Explain the coefficient of permeability, A sand deposit of 12 m thick overl...

A sand deposit of 12 m thick overlies a clay layer. The water table is 3 m below the ground surface. In a field permeability pump-out test, the water is pumped out at a rate of 540

State the procedure of prestressing, State the procedure of prestressing ...

State the procedure of prestressing When these wires cool down, concrete is poured in the moulds in which these tendons are provided in a stretched condition. Using this proces

Widening on curves, Widening on Curves: Pavements have to be widened ...

Widening on Curves: Pavements have to be widened on curves because of the fact that : (a) the vehicle has a wheel base and overhang on the front and rear, and the vehicle

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd