Estimate the size estimating the rcc structures, Civil Engineering

Assignment Help:

PART - A

1.  Can you enumerate the benefits of individual wall method of estimation?

2.  Estimate the single room of size  3m x 4m x height 3m  using individual wall method?

3.  Which method you will choose - center line method or individual wall method for estimation of buildings?

PART - B

4.  Write the parameters you should keep in mind while estimating the RCC structures?

5.  A singly reinforced concrete beam is 200 mm wide and 400mm deep to the center of the tension reinforcement which consists of 4 bars of 16mm diameter. If the stresses in concrete and steel are not to exceed 5N/mm2 and 140 N/mm2, Estimate the various materials for the said beam?.

6. A single room has four columns of size 400mm x 600mm x 3m. Estimate the total concrete required? Also estimate the various constituents of concrete? Use M20 grade of concrete? Assume the suitable data.

 


Related Discussions:- Estimate the size estimating the rcc structures

HIGHWAY CONSTRUCTION & MAINTENANCE, what is the difference between feasibil...

what is the difference between feasibility study and traffic counting

Quality control of concrete roads, Quality Control of Concrete Roads: ...

Quality Control of Concrete Roads: Concrete roads require a very high degree of quality control. The following aspects need to be checked regularly: (a) Strength, shape an

What do you mean by laying of apron in design of bridge, Q. What do you mea...

Q. What do you mean by Laying of apron in design of bridge? Width of apron laid on river bed should be 1.5 D1 where D 1 is estimated scour depth in metres below river bed. Thi

Strength of Materials , Need to know about compressive strength test and te...

Need to know about compressive strength test and tensile strength test of cement

Determine the dimension of the vertical side walls, Determine the dimension...

Determine the dimension of the vertical side walls for a rectangular open channel designed to convey 150 cfs of storm water runoff. The runoff is collected in the parking lots and

Present worth of an infinite series of annual amount, The construction of a...

The construction of a new bakery requires the property development firm to pay the municipality the cost to expand its sewage treatment plant. In addition to the expansion costs, t

Calculate the effective annual interest rate, A credit card advertises a no...

A credit card advertises a nominal rate of 18% compounded monthly. If no monthly payments are made, the effective annual interest rate is most nearly: The actual rate is, (18%

Show the benefits of adopting marine fill, In reclamation involving large v...

In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material?  There are two

Moment distribution method hinges, Analyse the continuous beam using moment...

Analyse the continuous beam using moment distribution. A continuous beam ABCDE fixed at A carry a load of 2KN one metre from A at AB 3m. BC 3m, carry a UDL of 3KN/m and hinge at

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd