It is proposed to construct a 3m diameter, 50m long tunnel, heading 0950, through the andesite lava flow at Maori Bay (Muriwai). As part of the preliminary investigations you have been asked to write a report assessing the suitability of the rock mass for this project, & provide an initial indication of rock suitability (including stand-up time) & support that will be required in the tunnel.

Attached is a sheet from a preliminary defect survey carried out on the exposed face of the lava flow.

REPORT

1.    Describe the local geology (Maori Bay - Muriwai)

  • i.e. rock types & structures, etc at and around the site
  • Find formation & group names from an appropriate geological map or publication

2.    Represent the defect survey graphically (not in a table)

3.    Estimate stand-up time using the RMR System (showing workings)

4.    Comment on the ease & possible methods of excavation of the tunnel

5.    Identify possible methods for tunnel support (if any is needed) as given by the RMR system

6.    Your report should also contain:

7.    A map showing the location of the site

8.    An estimate of rock material (compressive) strength of the lava flow

9.    An estimate of what the RQD would be in a horizontal bore hole (showing workings)

10. A list of all references used. These must be cited in the report using the APA System


Related Discussions:- Estimate stand-up time using the rmr system

Statistical hypotheses - anova, Your company operates a machine shop, and, ...

Your company operates a machine shop, and, having heard you had experience in statistics and design of experiments, consulted you for your opinion on an experiment they want to run

Demographic characteristics , Data   If you look at the Variable vie...

Data   If you look at the Variable view (at top of screen - select View and select variables), you will see the names of variables and information about each one.  The lab

Working capital, prepare an estimate of working capital requirements from t...

prepare an estimate of working capital requirements from the following information 1. project annual sales 1,00000/- 2. selling price Rs. 8/unit 3.percentage of net profit on sale

Construct a stem-and-leaf diagram, An internal report issued by the marketi...

An internal report issued by the marketing manager of a oil-change franchise claims that the mean number of miles between oil changes is for franchise customers is at least 3600 mi

Homework, 9. From 11 positive integer scores on a 10-point quiz, the mean i...

9. From 11 positive integer scores on a 10-point quiz, the mean is 8, the median is 8, and the mode is 7. Find the maximum number of perfect scores possible on this test.

Costing for labour, ways or techniques for labour control policy

ways or techniques for labour control policy

Bond calculation, Calculate the original price of the bond. Bonds were issu...

Calculate the original price of the bond. Bonds were issued at $200,000 of x% ten-year term bond at an effective annual interest rate (market rate) of x%. The bonds pay interest se

Science, #question how to make an electron dot diagram

#question how to make an electron dot diagram

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd