Estimate stand-up time using the rmr system, Basic Statistics

Assignment Help:

SCENARIO

It is proposed to construct a 3m diameter, 50m long tunnel, heading 0950, through the andesite lava flow at Maori Bay (Muriwai). As part of the preliminary investigations you have been asked to write a report assessing the suitability of the rock mass for this project, & provide an initial indication of rock suitability (including stand-up time) & support that will be required in the tunnel.

Attached is a sheet from a preliminary defect survey carried out on the exposed face of the lava flow.

REPORT

1.    Describe the local geology (Maori Bay - Muriwai)

  • i.e. rock types & structures, etc at and around the site
  • Find formation & group names from an appropriate geological map or publication

2.    Represent the defect survey graphically (not in a table)

3.    Estimate stand-up time using the RMR System (showing workings)

4.    Comment on the ease & possible methods of excavation of the tunnel

5.    Identify possible methods for tunnel support (if any is needed) as given by the RMR system

6.    Your report should also contain:

7.    A map showing the location of the site

8.    An estimate of rock material (compressive) strength of the lava flow

9.    An estimate of what the RQD would be in a horizontal bore hole (showing workings)

10. A list of all references used. These must be cited in the report using the APA System


Related Discussions:- Estimate stand-up time using the rmr system

Homework help, example of descriptive statistics in word form

example of descriptive statistics in word form

Gain bandwidth product, Expertsmind.com  brings you unique solution in  phy...

Expertsmind.com  brings you unique solution in  physics What is Gain bandwidth product (GBW OR GB?)    Refer to the multiple of the open loop gain (continuous for a

Spectrum, example for pure and impure spectrum

example for pure and impure spectrum

Probability assessments, According to a weather forecaster's subjective pro...

According to a weather forecaster's subjective probability assessments, the probability of record-breaking rain during this year in Jamshedpur is 0.01 . However, if Ranchi has a r

examine the distributions of the sample data, A second file on DocDepot na...

A second file on DocDepot named Marks.mtp contains the final exam percentages of students in ADM2304A in the Fall 2011 semester. Assume that the class can be considered a random sa

Royalty accounts, Ritu acquired a mine on lease from Richa for a period of ...

Ritu acquired a mine on lease from Richa for a period of 8 years at a royalty of ` 60 per tonne of coal produced subject to minimum rent of ` 1,00,000 for the first year, increasin

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd