Estimate stand-up time using the rmr system, Basic Statistics

Assignment Help:

SCENARIO

It is proposed to construct a 3m diameter, 50m long tunnel, heading 0950, through the andesite lava flow at Maori Bay (Muriwai). As part of the preliminary investigations you have been asked to write a report assessing the suitability of the rock mass for this project, & provide an initial indication of rock suitability (including stand-up time) & support that will be required in the tunnel.

Attached is a sheet from a preliminary defect survey carried out on the exposed face of the lava flow.

REPORT

1.    Describe the local geology (Maori Bay - Muriwai)

  • i.e. rock types & structures, etc at and around the site
  • Find formation & group names from an appropriate geological map or publication

2.    Represent the defect survey graphically (not in a table)

3.    Estimate stand-up time using the RMR System (showing workings)

4.    Comment on the ease & possible methods of excavation of the tunnel

5.    Identify possible methods for tunnel support (if any is needed) as given by the RMR system

6.    Your report should also contain:

7.    A map showing the location of the site

8.    An estimate of rock material (compressive) strength of the lava flow

9.    An estimate of what the RQD would be in a horizontal bore hole (showing workings)

10. A list of all references used. These must be cited in the report using the APA System


Related Discussions:- Estimate stand-up time using the rmr system

Definition of capitalization, Definition of capitalization is termed or sho...

Definition of capitalization is termed or shown as a process of recording & classifying the expenditure on assets in a balance sheet. Can you explain me this term more.

Explain hypothesis test, Oprah Winfrey endorsed Barack Obama in the Democra...

Oprah Winfrey endorsed Barack Obama in the Democratic presidential primary. Does Oprah's endorsement make a difference? If so, we would expect support for Obama to be higher among

R programm, 1. Generate a large dataset ( at least 1000 observations) µ wit...

1. Generate a large dataset ( at least 1000 observations) µ with a known mean, µ between 20 and 40 and variance s = 9 using rnorm(). identify it as D. Use the functions mean() and

Incomplete accounts, HOW TO PREPARE INCOMPLETE ACCOUNTS CORRECTLY?

HOW TO PREPARE INCOMPLETE ACCOUNTS CORRECTLY?

Binomial expansion, what is the largest coefficient of (1+3x)^4 is ?

what is the largest coefficient of (1+3x)^4 is ?

Replacement theory, who is the mathematician who invented replacement theor...

who is the mathematician who invented replacement theory of operation research

Balance sheet assignment, The High Company Balance Sheet Assignment (to be...

The High Company Balance Sheet Assignment (to be completed using Microsoft Excel) -Create T accounts for each transaction #1-10 -Create a trial balance -Create Income Statement -

Types of assets, explain different types of assets..

explain different types of assets..

Historigram, what is historigram in statistics please give the problems and...

what is historigram in statistics please give the problems and there solution in statistics as soon as possible

Histogram and Historigram, What are the differences between Histogram and H...

What are the differences between Histogram and Historigram, list out the points.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd