Estimate Bridge Pier Concrete, Civil Engineering

Assignment Help:
Takeoff the 3 elements for the following bridge pier components:
1. Pier Footing,
2. Pier Column,
3. Pier Cap (Top).
• Misc Items to include Shear Key.
• Misc Items to exclude Rebar.
• Include the following Finishes:
1. Bearing Pad Surfaces (the complete top surface, not just the pads);
2. Concrete Sealing of ALL Exposed surfaces including 600mm below grade.
• Show all work on quantity take off sheets using proper order and numbering system

Related Discussions:- Estimate Bridge Pier Concrete

Bearings, what is the difference between whole circle bearing and reduced b...

what is the difference between whole circle bearing and reduced bearing?

Define diving equipments for underwater inspection of bridge, Define Diving...

Define Diving Equipments for Underwater Inspection of Bridge? Generally two types of diving, Scuba diving and surface supplied air diving, is employed in underwater inspection

Concrete, what are the appropriate methods of concreting

what are the appropriate methods of concreting

Calculate the settlement at the centre of the mat, A mat foundation of 15...

A mat foundation of 15 m x 15 m and weighing 20000 N/m 2 is to be constructed on the surface of a soil strata. The profile is given in Figure. The number of squares enclosed i

Water bound macadam, Water Bound Macadam: Water Bound Macadam (WBM) i...

Water Bound Macadam: Water Bound Macadam (WBM) is a dense and compact course of a road pavement composed of stone aggregates held together by a film consisting of gravel or s

Highway Engg, what are lab and field test carried on soil subgrade

what are lab and field test carried on soil subgrade?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd