Estimate Bridge Pier Concrete, Civil Engineering

Assignment Help:
Takeoff the 3 elements for the following bridge pier components:
1. Pier Footing,
2. Pier Column,
3. Pier Cap (Top).
• Misc Items to include Shear Key.
• Misc Items to exclude Rebar.
• Include the following Finishes:
1. Bearing Pad Surfaces (the complete top surface, not just the pads);
2. Concrete Sealing of ALL Exposed surfaces including 600mm below grade.
• Show all work on quantity take off sheets using proper order and numbering system

Related Discussions:- Estimate Bridge Pier Concrete

Levelling procedure, how to carry on leveling using dumpy level????????????...

how to carry on leveling using dumpy level????????????

Deflections of bars, how do one uses the Macauleys model to find deflection...

how do one uses the Macauleys model to find deflections of bars

Dam, how many types of drainage galleries and foundation treatment

how many types of drainage galleries and foundation treatment

Process of installation of elastomeric bearing, The process of installation...

The process of installation of elastomeric bearing differs in case of precast vis-a-vis cast-in-situ girders. For precast girders, the bearing may be fixed to the underside of the

State the term- friction in tendon, State the term- friction in tendon ...

State the term- friction in tendon Considerable frictional loss takes place due to friction between the tendon and the material surrounding it, namely the concrete or the sheat

Strenght of meterials 2, Difference between direct and bending stress diagr...

Difference between direct and bending stress diagrams

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd