Estimate Bridge Pier Concrete, Civil Engineering

Assignment Help:
Takeoff the 3 elements for the following bridge pier components:
1. Pier Footing,
2. Pier Column,
3. Pier Cap (Top).
• Misc Items to include Shear Key.
• Misc Items to exclude Rebar.
• Include the following Finishes:
1. Bearing Pad Surfaces (the complete top surface, not just the pads);
2. Concrete Sealing of ALL Exposed surfaces including 600mm below grade.
• Show all work on quantity take off sheets using proper order and numbering system

Related Discussions:- Estimate Bridge Pier Concrete

Survey, underground installations

underground installations

Biodiversity, actual meaning of it? Is it a unit to measure the functions o...

actual meaning of it? Is it a unit to measure the functions of enviroment?

Determine the total lateral pressure on the wall, A masonry retaining wall ...

A masonry retaining wall is 1.5 m wide at the top, 3.5 m wide at the base and 6 m high. It is trapezoidal in section and has a vertical face on the earth side. The backfill is leve

What is tendonand describe its working, What is Tendonand describe its work...

What is Tendonand describe its working It is a steel element, such as a wire, cable, bar or strand which is provided, in a stretched form, to impart prestressing force in con

Corrosion, Distinguish between dry and wet corrosion

Distinguish between dry and wet corrosion

Torsion, assumptions made in the simple torsion theory

assumptions made in the simple torsion theory

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd