Estimate Bridge Pier Concrete, Civil Engineering

Assignment Help:
Takeoff the 3 elements for the following bridge pier components:
1. Pier Footing,
2. Pier Column,
3. Pier Cap (Top).
• Misc Items to include Shear Key.
• Misc Items to exclude Rebar.
• Include the following Finishes:
1. Bearing Pad Surfaces (the complete top surface, not just the pads);
2. Concrete Sealing of ALL Exposed surfaces including 600mm below grade.
• Show all work on quantity take off sheets using proper order and numbering system

Related Discussions:- Estimate Bridge Pier Concrete

Explain the design of waterway, Q. Explain the Design of waterway? When...

Q. Explain the Design of waterway? When the river flows between high banks and the whole width is actively functioning during high floods, the bridge waterway should practicall

Shape and soundness test - testing of aggregates, Shape and Soundness Test ...

Shape and Soundness Test - Testing of aggregates: Shape For providing a good interlock and strength, the aggregates should be cubical in shape. Elongated and flaky pa

Factor that affect the bearing capacity of a shallow footing, State the var...

State the various factors that affect the bearing capacity of a shallow footing. Write short note critical notes on settlement of foundations. How do you ascertain whether a fou

Joint filler in concrete expansion joints - a must, Joint filler in concret...

Joint filler in concrete expansion joints - a must?? Presence of joint filler is required to the proper functioning of concrete joints however some may doubt its value. For a c

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd