An activated sludge tank treats 1 MGD from the primary clarify and has an X of
2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank
and has an [SS] of 3980 ppm. The concentration of the BOD exiting the primary clarier is 200
ppm.
(a) What are Qw and Xw?
(b) What are Qc and Xc?
(c) What are Q1 and X1?
(d) What is Xe? (Answer = 24.4 ppm)
(e) Calculate the volume of the tank that will satisfy the following requirements:
(e-1) BOD loading < 35 lb BOD/1000 ft3day
(e-2) Sludge age > 5 days
(e-3) Aeration period > 4 hr

Related Discussions:- Environmental Question

Necessity of reinforcement in precast concrete manhole units, Necessity of ...

Necessity of reinforcement in precast concrete manhole units Precast concrete manholes are generally constructed by placing the bases of manholes firstly. Walls of precast man

Concrete, what are the appropriate methods of concreting

what are the appropriate methods of concreting

Minimisation of differential settlement, Minimisation of Differential Settl...

Minimisation of Differential Settlement You are aware that differential settlement causes more distress to the structure, when compared with that of total settlement. The var

What is meant by normally consolidated clay stratum, Determine what is mean...

Determine what is meant by normally consolidated clay stratum and over-consolidated clay stratum. Draw typical results of consolidation test data to a suitable plot relating the vo

Upper bound of indirect tensile strength, Question While designing rese...

Question While designing reservoirs, indirect tensile strength of the concrete mix is particular to be less than a specific value such as 2.8N/mm2 for potable water. Why ought

Determine the dimension of the vertical side walls, Determine the dimension...

Determine the dimension of the vertical side walls for a rectangular open channel designed to convey 150 cfs of storm water runoff. The runoff is collected in the parking lots and

Construction management, i would like to get a project done. I have some pl...

i would like to get a project done. I have some plans and I need a cost estimate on how much it will cost to get it constructed.

Concrete, What is compacting factor

What is compacting factor

Millennium miles, Construction planning millennium miles

Construction planning millennium miles

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd