Environmental Question, Civil Engineering

Assignment Help:
An activated sludge tank treats 1 MGD from the primary clarify and has an X of
2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank
and has an [SS] of 3980 ppm. The concentration of the BOD exiting the primary clarier is 200
ppm.
(a) What are Qw and Xw?
(b) What are Qc and Xc?
(c) What are Q1 and X1?
(d) What is Xe? (Answer = 24.4 ppm)
(e) Calculate the volume of the tank that will satisfy the following requirements:
(e-1) BOD loading < 35 lb BOD/1000 ft3day
(e-2) Sludge age > 5 days
(e-3) Aeration period > 4 hr

Related Discussions:- Environmental Question

Non-distortional prestressing, Non-distortional Prestressing Concrete m...

Non-distortional Prestressing Concrete members deflect due to their own self weight. If prestressing force is applied in such a way that these deflections are eliminated due to

Define design aspects of pot bearing, Define Design Aspects of Pot Bearing?...

Define Design Aspects of Pot Bearing? Basic elements of a POT bearing are: - POT or a shallow cylinder - An elastomeric pad - A set of sealing rings - A piston P

Determine the time of settlement of a sand particle, Using Stokes' law, det...

Using Stokes' law, determine the time of settlement of a sand particle of 0.2 mm size (specific gravity 2.67) through a depth of water of 30 cm. The viscosity of water is 0.001 N-s

Human values, give the two aspects of honesty& explain

give the two aspects of honesty& explain

Plinth wall, is it necessary for to put plinth wall in buildings

is it necessary for to put plinth wall in buildings

Settlement due to lowering of water table, Q. Settlement due to Lowering of...

Q. Settlement due to Lowering of Water Table? Water table is encountered with, whenever any excavations are made for foundations. The water is to be out for working conditions.

Hydraulics, In this question we consider a bended outlet of pipe flow AB. E...

In this question we consider a bended outlet of pipe flow AB. End A is attached to an incoming pipe by a flange connection. The pipe diameter at A is the same as the incoming pipe,

Concrete mix design, Concrete Mix Design: Concrete mix design is done...

Concrete Mix Design: Concrete mix design is done in a laboratory to achieve the desired strength and workability. The mix design is done to achieve strength slightly higher t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd