Types of Surveys and Investigations: For preparing a good road project, the following surveys and investigations are needed: (a) Traffic Surveys (b) Topogr
Schedule control is concerned with all of the following except: a. Influencing the factors which create schedule changes b. Determining that the schedule has changed c.
If y1 and y2 are alternate depths of a rectangular channel show that Yc³ =2y1²y2²/(y1+y2) Also specific energy E = y1²+y1y2+y2²/(y1+y2)
describe in detail the various parts of a total station
Explain briefly shallow foundation?
Los Angeles Abrasion Test: In which the aggregates are placed in a rotating drum in which a certain number of cast iron cylindrical balls are also placed, and the drum rotated
what is premix carpet open graded and where is it used and what are its limitations ?
Streams Not Wholly Alluvial In streams which are not wholly alluvial, consisting of bed of pebbles, rock, etc. the liner waterway is kept equal to the actual surface width of
Explain the Basic requirement of Design of shock transmission unit? The STU must withstand the specified design load. The stroke of the piston must be bigger than the movement
Test on specially moulded test piece The test piece shall be moulded by the manufacturer with identical compound and under identical vulcanizing conditions as used in manufact
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd