An activated sludge tank treats 1 MGD from the primary clarify and has an X of
2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank
and has an [SS] of 3980 ppm. The concentration of the BOD exiting the primary clarier is 200
ppm.
(a) What are Qw and Xw?
(b) What are Qc and Xc?
(c) What are Q1 and X1?
(d) What is Xe? (Answer = 24.4 ppm)
(e) Calculate the volume of the tank that will satisfy the following requirements:
(e-1) BOD loading < 35 lb BOD/1000 ft3day
(e-2) Sludge age > 5 days
(e-3) Aeration period > 4 hr

Related Discussions:- Environmental Question

Explain the term - uniaxial - biaxial -triaxial prestressing, Explain the t...

Explain the term - Uniaxial - Biaxial -Triaxial Prestressing These terms refer to cases when the concrete is prestressed in only one direction, in two mutually perpendicular di

Explain the tertiary treatment for wastewater, Explain the Tertiary Treatme...

Explain the Tertiary Treatment for Wastewater Tertiary Treatment: in cases where secondary treatment is not adequate (particularly if the discharges are into a sensitive water

Explain civil fe hydraulics and hydrologic systems, Explain Civil Fe Hydrau...

Explain Civil Fe Hydraulics and Hydrologic Systems When spills occur at grade on soils in areas where unconfined aquifers are present, remediation procedures to remove the poll

Define the coefficient of permeability - hydraulic system, Define the Coeff...

Define the Coefficient of Permeability: (K) A measurement of the ability of the soil or an aquifer for the movement of water through it. Also termed "hydraulic conductivity", C

Highway Engg, what are lab and field test carried on soil subgrade

what are lab and field test carried on soil subgrade?

Survey, chaining on level surface

chaining on level surface

Highway pavement design, Explain the important factors affecting the design...

Explain the important factors affecting the design of pavement?

Routing maintenance and major maintenance, What is the difference between r...

What is the difference between routing maintenance and major maintenance in school facilities? Ans) The routine maintenance is the minor and consistent repairs that are engaged

Sub-base for concrete carriageway - non-strength provider, Sub-base for con...

Sub-base for concrete carriageway - non-strength provider Essentially sub-base for a concrete carriageway is provided for the below reasons: (i)  It provides aneven and smo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd