Environmental Question, Civil Engineering

Assignment Help:
An activated sludge tank treats 1 MGD from the primary clarify and has an X of
2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank
and has an [SS] of 3980 ppm. The concentration of the BOD exiting the primary clarier is 200
ppm.
(a) What are Qw and Xw?
(b) What are Qc and Xc?
(c) What are Q1 and X1?
(d) What is Xe? (Answer = 24.4 ppm)
(e) Calculate the volume of the tank that will satisfy the following requirements:
(e-1) BOD loading < 35 lb BOD/1000 ft3day
(e-2) Sludge age > 5 days
(e-3) Aeration period > 4 hr

Related Discussions:- Environmental Question

Design of the aeration basin based on solids retention time, Design of the ...

Design of the Aeration Basin Based on Solids Retention Time - sewer construction: You are provided the following information about a municipal wastewater treatment plant. That

Determine the late start time for activity, For the project network shown, ...

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

Linear programming, what are the advantages of linear programming?

what are the advantages of linear programming?

Sir I want to do assignments, sir I want to do assignments which were provi...

sir I want to do assignments which were provided by you sir could you please check with that

Compaction to freshly placed concrete piles, Compaction to freshly placed c...

Compaction to freshly placed concrete piles  In general practice, reliance is placed on the self-compaction of particularly designed concrete mixes to achieve adequate compact

Steel work design, 1) A building constructed from steelwork requires the fo...

1) A building constructed from steelwork requires the following sections to be designed: a. A beam carrying a characteristic permanent load of 11kN/m and a characteristic variable

What do you mean by river gauging, Q. What do you mean by River Gauging? ...

Q. What do you mean by River Gauging? Due to certain behavior of rivers the problem of gauging then is quit complex. The purpose of river gauging is to stabilize the river chan

Water treatment, The transmission main from the well field to the community...

The transmission main from the well field to the community is 2500 ft, the velocity of flow at peak pumping capacity is 3.5 fps, water temperature is 10oC, and pH is 7.5. If free c

Write Your Message!

Captcha
Free Assignment Quote