Environmental Question, Civil Engineering

Assignment Help:
An activated sludge tank treats 1 MGD from the primary clarify and has an X of
2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank
and has an [SS] of 3980 ppm. The concentration of the BOD exiting the primary clarier is 200
ppm.
(a) What are Qw and Xw?
(b) What are Qc and Xc?
(c) What are Q1 and X1?
(d) What is Xe? (Answer = 24.4 ppm)
(e) Calculate the volume of the tank that will satisfy the following requirements:
(e-1) BOD loading < 35 lb BOD/1000 ft3day
(e-2) Sludge age > 5 days
(e-3) Aeration period > 4 hr

Related Discussions:- Environmental Question

Define inspection of steel or cast iron substructures, Define Inspection of...

Define Inspection of Steel or Cast Iron Substructures? Corrosion is the principal cause of deterioration in steel waterfront substructures. On bare un-protected steel pilings,

Practically the dielectric constant of air is taken as , Practically  the ...

Practically  the dielectric constant of air is taken as? Answer: The dielectric constant of air is taken as  unity.

Define the pressure on a vertical plane, Define the Pressure on a vertical ...

Define the Pressure on a vertical plane Fluid pressure increases linearly with increasing depth. The average pressure on a vertical plane occurs at the average vertical depth.

Geotechnical Design, I need this to be done perfectly . It is a civil engin...

I need this to be done perfectly . It is a civil engineering assignment. Please let me know if you can solve this perfectly within no more than 40 hours. Thanks.

Determine the total lateral pressure on the wall, A masonry retaining wall ...

A masonry retaining wall is 1.5 m wide at the top, 3.5 m wide at the base and 6 m high. It is trapezoidal in section and has a vertical face on the earth side. The backfill is leve

Major differences between sureties and security, Question What are majo...

Question What are major differences between sureties and security ? Answer During construction contracts, if a contractor fails to carry out works, employer would e

Reliability of settlement computations, Inspite of the problems of sample d...

Inspite of the problems of sample disturbance, if 1) e or E vs log p curve is interpreted, reasonably with some corrections for sample disturbance, 2) if the sample disturbance

Joints in concrete carriageway, Question Is it necessary joints of conc...

Question Is it necessary joints of concrete kerbs be in line with joints in concrete carriageway ? Answer In regular practice, joints are provided in road kerbs to ca

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd