Environmental Question, Civil Engineering

Assignment Help:
An activated sludge tank treats 1 MGD from the primary clarify and has an X of
2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank
and has an [SS] of 3980 ppm. The concentration of the BOD exiting the primary clarier is 200
ppm.
(a) What are Qw and Xw?
(b) What are Qc and Xc?
(c) What are Q1 and X1?
(d) What is Xe? (Answer = 24.4 ppm)
(e) Calculate the volume of the tank that will satisfy the following requirements:
(e-1) BOD loading < 35 lb BOD/1000 ft3day
(e-2) Sludge age > 5 days
(e-3) Aeration period > 4 hr

Related Discussions:- Environmental Question

Concrete technology, why strength of transition zone is less than bulk past...

why strength of transition zone is less than bulk paste

Compatibility condition, Compatibility Condition: Total strain in ste...

Compatibility Condition: Total strain in steel = Total strain in copper i.e. 3 × 10 -4 + 1.965 × 10 -5 P s   = 4.5 × 10 -4 + 1.8421 × 10 -5 P c Recognising that P

Load carrying element of min-piles, Q. A pipe or groups of bars be adopted ...

Q. A pipe or groups of bars be adopted as load carrying element of min-piles? The design of mini-piles someway differs from other traditional pile types. For example the design

Define the types of pump performance curves, Define the types of Pump Perfo...

Define the types of Pump Performance Curves Two types of pump performance curves: x-axis = flow rate; y-axis = head (TDH). Characteristic curves: Provided by the pump m

Reinforcement in thrust blocks, Reinforcement in thrust blocks In gene...

Reinforcement in thrust blocks In general situation, reinforcement isn't essential for thrust blocks in pressurized pipelines. Though certain amount of reinforcement hasto be

Explain beam-columns, Explain Beam-Columns 1. A specific case of a beam...

Explain Beam-Columns 1. A specific case of a beam subjected to:  Axial loading Strong axis flexural stress   2. The section is also pinned at both ends pe

Estimate the activity durations - construction management, Estimate the Act...

Estimate the Activity Durations The total labor cost for emergency bridge rehabilitation on an interstate highway is $5,716,440.  The average crew-hour cost is $15,879 for this

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd