Environmental Question, Civil Engineering

Assignment Help:
An activated sludge tank treats 1 MGD from the primary clarify and has an X of
2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank
and has an [SS] of 3980 ppm. The concentration of the BOD exiting the primary clarier is 200
ppm.
(a) What are Qw and Xw?
(b) What are Qc and Xc?
(c) What are Q1 and X1?
(d) What is Xe? (Answer = 24.4 ppm)
(e) Calculate the volume of the tank that will satisfy the following requirements:
(e-1) BOD loading < 35 lb BOD/1000 ft3day
(e-2) Sludge age > 5 days
(e-3) Aeration period > 4 hr

Related Discussions:- Environmental Question

Acid test - tests on stones, Acid Test: This test is usually carried...

Acid Test: This test is usually carried out on sand stones to examine the presence of calcium carbonate that weakens the weather resisting quality. In this particular  test,

Formation of frost heave, Q. Formation of frost heave? In the past, it ...

Q. Formation of frost heave? In the past, it was believed that formation of frost heave was related to volumetric expansion of soil water which changed from liquid state to sol

Calculate the hydrostatic force, The steel oil container shown in the figur...

The steel oil container shown in the figure has a circular lid centred on its sloping wall. The lid is hinged at A and held closed with a frictionless stopper at B. The lid is made

PRC, what is the bleeding of concrete?

what is the bleeding of concrete?

Afflux on account of obstruction to flow, Q. Afflux on account of obstructi...

Q. Afflux on account of obstruction to flow? Even if the river constriction on account of approach banks is not excessive and bridge waterway is wider than that causing critica

What is the external load acting on a pre-stressed beam, What is the extern...

What is the external load acting on a pre-stressed beam In the elastic range, a variation in the external load acting on a pre-stressed beam results in a change in the location

Embankment, Describe the various steps in embankment construction.

Describe the various steps in embankment construction.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd