Environmental Question, Civil Engineering

Assignment Help:
An activated sludge tank treats 1 MGD from the primary clarify and has an X of
2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank
and has an [SS] of 3980 ppm. The concentration of the BOD exiting the primary clarier is 200
ppm.
(a) What are Qw and Xw?
(b) What are Qc and Xc?
(c) What are Q1 and X1?
(d) What is Xe? (Answer = 24.4 ppm)
(e) Calculate the volume of the tank that will satisfy the following requirements:
(e-1) BOD loading < 35 lb BOD/1000 ft3day
(e-2) Sludge age > 5 days
(e-3) Aeration period > 4 hr

Related Discussions:- Environmental Question

Internal force of preloaded fasteners, Q. Internal force of preloaded faste...

Q. Internal force of preloaded fasteners? Force in a bolt in a bolted joint relies on the preloading force applied to it at the time of the tightening operation. For example, w

Explain the critical flow - hydrolic system, Explain the Critical Flow ...

Explain the Critical Flow Critical flow occurs where the flow depth is at the critical depth. One location in an open channel is where the flow is approaching a free outfall.

Beam to column connection, what are the characteristics of the beam to colu...

what are the characteristics of the beam to column connection?

Levelling, difference between fly levelling and differential levelling

difference between fly levelling and differential levelling

RCC, WHAT IS RCC

WHAT IS RCC

General, hi, im interested in doing engineering after i finish school but i...

hi, im interested in doing engineering after i finish school but im just wondering what is involved in it? im interested in the math side of it and i know there is a certain amount

Sway porta frame, how to sway portal frame both end fixed due to eccentric ...

how to sway portal frame both end fixed due to eccentric loading with diagram

Stacking of materials for building, briefly explain the stacking of materia...

briefly explain the stacking of materials in the site for general building

Surveying, Distance ABC was measured with a 30m. Chain tested and found to ...

Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was

Necessity of pile tip cover for rock-socketed H-piles, Q. Necessity of pile...

Q. Necessity of pile tip cover for rock-socketed H-piles? In current practice concrete cover is generally provided at the pile tips of pre-bored H-piles socketed in rock. The o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd