Enumerate the term - superposing the stress variations, Civil Engineering

Assignment Help:

Enumerate the term - superposing the stress variations

If the case of concentric pre-stressing is considered, we can appreciate that stress at any section of the beam is compressive in nature and its magnitude bver any cross-section is uniformly PIA. If no external load or self load of the beam is considered, the resultant force at any section shall be located at the centroidal axis. If other loads, such as external loads and self load of the beam, are also considered, stress pattern at any section is obtained by superposing the stress variations due to all loads. Knowing that the resultant force at any section is equal to the pre-stressing force, the location of this resultant force at any section can be determined so that the same stress pattern at the section is obtained.


Related Discussions:- Enumerate the term - superposing the stress variations

Calculate the flood discharg, Q. A bridge is to be constructed over a strea...

Q. A bridge is to be constructed over a stream having a catchment area = 20 miles 2 partly in plains and partly in hills. Portion in hills has a length of 1.7 miles and fall of 88

Designing lateral resistance of piles, Question While designing later...

Question While designing lateral resistance of piles , have to engineers only use earth pressure against pile caps simply? Answer In case of designing lateral loa

Los angeles abrasion test, Los Angeles Abrasion Test: In which the agg...

Los Angeles Abrasion Test: In which the aggregates are placed in a rotating drum in which a certain number of cast iron cylindrical balls are also placed, and the drum rotated

Mr Kamal Saxena, What is WBM road. How it is constructed?

What is WBM road. How it is constructed?

Cost-volume relationship, Cost-volume relationship: Cost-volume relati...

Cost-volume relationship: Cost-volume relationship is illustrated through a simple example dealing with the cost of operating an automobile. To perform the analysis following

Depth of boring for multi-storeyed building, Depth of Boring  for Multi-st...

Depth of Boring  for Multi-storeyed Building Peck has recommended that first drill hole is to be made up to depth at which the presence of a thick layer of soft clay with a hig

Embankment, Describe the various steps in embankment construction.

Describe the various steps in embankment construction.

Reinforcement detailing, i want to know about the detailing at beam -column...

i want to know about the detailing at beam -column joint & beam- wall joint

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd