Enumerate the term - Failure Due to Crushing of Concrete

Over reinforced pre-stressed concrete members, provided with a large amount of pre-stressing steel or relatively small compression flanges, are likely to encounter this mode of failure pattern. In this mode of  failure, deflections are small, steel does not go upto the yield and concrete is crushed at the stage of failure.

 


Related Discussions:- Enumerate the term - failure due to crushing of concrete

CUBE STRENGTH, IN CASE CUBE IS FAIL WHAT CAN IDO

IN CASE CUBE IS FAIL WHAT CAN IDO

Elongation, Elongation of bar due to self weight

Elongation of bar due to self weight

Check rail on curve, Check Rail on Curve - Check Rails are basically p...

Check Rail on Curve - Check Rails are basically provided on sharp curves to reduce the lateral wear on the outer rail. They also prevent the outer wheel flange from mounting o

Flash point test, Flash Point Test: The flash point is the temperatur...

Flash Point Test: The flash point is the temperature at which the bitumen gives off vapours which ignite in the presence of a flame. The flash point temperature gives the cri

Torsion, Asolid circular shaft of 25 cm diameter is to be replaced by a hol...

Asolid circular shaft of 25 cm diameter is to be replaced by a hollow shaft .The ratio of external to internal diameters being 2to1.Find the size of the hollow shaft if the maximum

Question.A , #q strain gauge arrangement is used to measuuestion..

#q strain gauge arrangement is used to measuuestion..

Define the alternate depths - hydrologic system, Define the Alternate Depth...

Define the Alternate Depths In open channels, two alternate depths of flow have the same energy for the same flow rate. As shown in the figure, the hyperbolic plot of energy (x

Draw the variation in total stress, Draw the variation in total stress, eff...

Draw the variation in total stress, effective stress, and pour water pres- sure up to a depth of 6 m below ground level, given the following data. The water table is 2 m below grou

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd