ENMIN5018, Other Engineering

Assignment Help:
Design a detailed surface mine excavation plan.
Detail development requirements.
Detail Production requirements including a full description of the method selected.
Number of production units required/rate of production/other scheduling.
Describe loading/haulage requirements
Equipment
Processing
Personnel
Safety
Briefly describe power & drainage requirements
As well as any other salient points as required by the mining system, for economic analysis use current market prices in A$ for the commodity as required. Accurate costing is not an essential aspect to the project but some notional economic modelling is required to illustrate the viability of the method detailed.
State and justify all assumptions.
Gold-silver mineralisation in the deposit is hosted by an epithermal quartz vein system, which developed in a sequence of hydrothermally altered quartz-bearing andesite’s of Miocene age. Gold occurs as electrum (a gold-silver alloy) and is generally very fine grained. The steeply dipping vein system extends over 1,600 metres of strike length. Pervasive oxidation centred on the larger veins extends to a depth of about 200 metres.
This ore resource has been estimated to be approximately 11.25 million tonnes at 3.3 grams per tonne gold and 26 grams per tonne silver; equivalent to approximately 1,200,000 ounces of gold and 9.6 million ounces of silver.
The final pit will have approximate dimensions of 860 metres long by 600 metres wide at the original surface by 250 metres deep. The original surface has a fairly flat topography with minimal cover of topsoil and subsoil (10m or less). Typically, the waste rock consists of a thick sequence of volcanic lavas, breccia’s and tuff’s of generally andesitic composition as such geomechanically these are classed as reasonably competent rocks.
Ore is delivered to the processing plant; the processing plant has a planned output of up to a maximum of 1.25 million tonnes per annum.
The climate of the area is similar to that of Ballarat.

Related Discussions:- ENMIN5018

Life cycle of a product from raw materials, The Task: This project is a...

The Task: This project is a 50% of the whole assessment of the course. You are required to assess a life cycle of a product from raw materials, through the supply chain, manufa

Limiting travel distances - means of escape, Limiting travel distances - Me...

Limiting travel distances - Means of Escape: Some buildings, or parts of buildings, do not have alternative exits and do not have protected escape routes leading to a place of

Removing aircraft engines, Removing Aircraft Engines: To prepare an air...

Removing Aircraft Engines: To prepare an aircraft for engine removal, check that the aircraft weight and balance will not be adversely effected when the engine is removed. Mos

Auto cad, Assignment Title: Die Press Assembly Drawing The objective of th...

Assignment Title: Die Press Assembly Drawing The objective of this assignment is to demonstrate the following concepts of design. • Extrude • Revolve • Fillet • Dimensioning • To

Aerodynamics-source of drage, Source of drage Total Drag on an aerofoil...

Source of drage Total Drag on an aerofoil is called profile drag - Skin friction • due to tangential force arising from friction - Pressure • Form - due to the inte

Cro, types of blocking osicillators

types of blocking osicillators

Caselet- 2, suggestion regarding credit limit. should it be approved or not...

suggestion regarding credit limit. should it be approved or not what should be the amount of

Aad instruction, Ask question #Minimum 100 words acexplanation of aad with ...

Ask question #Minimum 100 words acexplanation of aad with examplescepted#

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!