Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working days of 10 hr each. The average height of excavation will be 18 ft, and the average angle of swing will be 80 degrees. The 3-cy shovel has a maximum digging height of 30 ft and the 5-cy machine;s maximum digging height is 34 ft. The efficiency factor will be a 50-min hour. Appropriate-size units can be used with either shovel. How many days will it require to complete the work? (5-cy machine, 105 days to complete
estion #Minimum 100 words accepted#

Related Discussions:- engineering economics

Systems approach to diagnose and solve the chronic w, systems approach to d...

systems approach to diagnose and solve the chronic water crisis in the city.

Desirable characteristics of a pavement, Desirable Characteristics of a Pav...

Desirable Characteristics of a Pavement: In order to fulfill the above function, the pavement has to have the following desirable properties : (a) It should be structurall

Horizontal capability of pile bents, Question For classic pile bents in...

Question For classic pile bents in marine piers, how can vertical loads related to horizontal capability of pile bents? Answer At first consider a pile bent with a top

Trigo, a pilot entering a bay on course

a pilot entering a bay on course

Chain, describe and sketch a survey chain

describe and sketch a survey chain

Explain the design of waterway, Q. Explain the Design of waterway? When...

Q. Explain the Design of waterway? When the river flows between high banks and the whole width is actively functioning during high floods, the bridge waterway should practicall

Determine about the post-tensioned concrete, Determine about the post-tensi...

Determine about the post-tensioned concrete The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling th

Calculate roller production, Calculate Roller Production An excavating ...

Calculate Roller Production An excavating contractor determined through a test strip, that a smooth steel-wheel vibrating roller compactor operating at 3-mph can compact a 6-in

Define limitations of radiography - inspection of bridge, Define Limitation...

Define Limitations of Radiography - Underwater Inspection of Bridge? i. Radiography is a costly and time consuming method, which re- quires extensive safety measures to be adop

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd