engineering economics, Civil Engineering

Assignment Help:
Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working days of 10 hr each. The average height of excavation will be 18 ft, and the average angle of swing will be 80 degrees. The 3-cy shovel has a maximum digging height of 30 ft and the 5-cy machine;s maximum digging height is 34 ft. The efficiency factor will be a 50-min hour. Appropriate-size units can be used with either shovel. How many days will it require to complete the work? (5-cy machine, 105 days to complete
estion #Minimum 100 words accepted#

Related Discussions:- engineering economics

Engineering economics, Ask quA contractor has both a 3-cy and a 5-cy shovel...

Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 worki

Concrete cover to enhance fire resistance, Q. Concrete cover to enhance fir...

Q. Concrete cover to enhance fire resistance? In the event of exposing concrete structures to a fire, a temperature gradient is established across the cross section of concrete

Physics, about lenses & mirrors for assignment

about lenses & mirrors for assignment

Mechanics of solid, determine the end slope and deflection in the beam

determine the end slope and deflection in the beam

Example for beam flexure design, Example for Beam Flexure Design Select...

Example for Beam Flexure Design Select the lightest W section for the simply supported beam shown below.  The beam length is 12ft.  The nominal loading is: w d = 4.0 kip/ft (i

Maintenance of bituminous roads, Maintenance of Bituminous Roads: The...

Maintenance of Bituminous Roads: The common defects noticed in a bituminous road are : potholes cracks rutting corrugations shoving stripping and l

Tack coat – emulsified asphalts vs cutback asphalts, Tack coat - emulsified...

Tack coat - emulsified asphalts vs. cutback asphalts Emulsified asphalt is a suspension of asphalt in water by employing an emulsifying agent that imposes an electric charge o

Deflection of beams, 1) A propped cantilever beam ABC is 7m long.It has th...

1) A propped cantilever beam ABC is 7m long.It has the point C fixed and Point A on a roller support.It carries a 200Kn point load at a distance 3m from A.There is a moment of 80KN

Why we use air valves, Q. Why we use Air Valves? Air Valves - Air valve...

Q. Why we use Air Valves? Air Valves - Air valves of proper size and pressure rating at summits. Air valves ensure the safety of the pipe line against collapse when at points o

DC POWER SUPPLY, DESIGN A LINEAR DC POWER SUPPLY WITH THE FOLLOWING SPECIFI...

DESIGN A LINEAR DC POWER SUPPLY WITH THE FOLLOWING SPECIFICATION,SHOW DETAILS STEPS AND CALCULATION...Vload :12v Iload :0.07A Vripple load(p-p) :0.01v TA :45 DEGREE CELCUS

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd