2. A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 400,000bcy of common earth in a minimum of 130 working days of 5hrs each. The average height of excavation will be 15ft, and the average angle of swing will be 120o. The 3-cy shovel has a maximum digging height of 30ft and the 5-cy machine’s maximum digging height is 34ft. the efficiency factor will be a 45min/hour. Appropriate size haul units can be used with either shovel. How many days will it require to complete the work?

Related Discussions:- engineering economices

Cash Flows Components, A typical investment will have three components of c...

A typical investment will have three components of cash flows: • Initial investment • Annual net cash flows • Terminal cash flows. Initial investment Initial investme

Equivalent shaft horsepower - aircraft maintenance , Equivalent Shaft Horse...

Equivalent Shaft Horsepower (EHP) In practice there is always a certain amount of jet thrust in the total output of the turbo-propeller engine and this must be added to the s.h

Types of patterns in manufacturing, Types of patterns : These  depends upo...

Types of patterns : These  depends upon many factors like the bulk of casting, type of moulding processes, number of castings required and the anticipated difficulty of moulding,

Unconventional gas, hey i need help in unconventional gas assignment, pleas...

hey i need help in unconventional gas assignment, please let me know if u can do this so

Servo accelerometer, Servo accelerometer Electro-mechanical servo (forc...

Servo accelerometer Electro-mechanical servo (force balance) accelerometer uses an electromagnet to provide restoring force. The position of the seismic mass is measured by a p

Method of calculating the thrust forces-engine performance, Method of calcu...

Method of calculating the thrust forces: The thrust forces or gas loads can be calculated for the engine, or for any flow section of the engine, provided that the areas, pressu

NIRAN, Why spiral model is called meta model?

Why spiral model is called meta model?

Assembly buildings - fire risk assessment, Assembly buildings: Assembl...

Assembly buildings: Assembly buildings are high life risk premises.  People often very densely occupy such buildings and they do so in large numbers so they must be given good

ALGORITHM, write an algorithm to find a number that multiplies your name 10...

write an algorithm to find a number that multiplies your name 10 times

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd