Engine oil replacement procedure, Mechanical Engineering

Assignment Help:

Engine oil replacement

  1. Motorcycle is thoroughly drained by kicking the vehicle several times.
  2. Inspect the drain bolt washer and replace if necessary.
  3. Tighten the drain bolt to the specified torque (2-2.5 kg-m).
  4. Engine oil has a great impact on the working and the service life of the engine. So use recommended engine oil only.
  5. If the engine is drained then measure 750-780 ml of engine oil in a clean container and fill in through dipstick hole.
  6. If the engine is disassembled then measure 900 ml of engine oil in a clean container and fill in through dipstick hole.
  7. Tighten the dipstick.


 


Related Discussions:- Engine oil replacement procedure

Management of financial requirements , Management of Financial Requirements...

Management of Financial Requirements:  To start an own workshop or any business you need monetary support. You need to ensure availability of the required money including working

What is one way shear, What is one way shear? Explain with a suitable demon...

What is one way shear? Explain with a suitable demonstration. One Way Shear This worked out seen a similar case is the case of wall footings. For square footings also the cr

Projection of solids., draw the projection of pentagonal pyramid have 30 mm...

draw the projection of pentagonal pyramid have 30 mm edge and axis 50 mm long having base on hp and an edge of the box parallel to vp

Separator-battery components , Separator:   Separator works as insulator b...

Separator:   Separator works as insulator between positive and negative plates. These separators are placed between each pair of plates.

Find the magnitude and position of maximum bending moment, A simply support...

A simply supported beam of length 5m takes a uniformly increasing load of 800 N/m at one end to 1600 N/m at the other end. Draw the shear force and the Bending moment diagrams for

Meaning, What different of blow hole and pin hole

What different of blow hole and pin hole

Sand blasting, Sand Blasting: Historically sand blasting was operated ...

Sand Blasting: Historically sand blasting was operated with only using sand only as abrasive media. Today the advance of technologies had brought manufacturer more variety in

Stress concentration factor, 1. Write a short note (not more than half A4 p...

1. Write a short note (not more than half A4 page) on your understanding on St. Venant's Principal for your engineering design analysis. 2.  Estimate the " Stress Concentration

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd