Engine misfires motorcycle problem, Mechanical Engineering

Assignment Help:

If Engine Misfires

Causes of Problem

Remedy

  • Incorrect Electrode gap of spark plug
  • Electrode worn out
  • Fouled spark plug
  • Shorter reach plug used
  • More than one gasket used
  • Aged spark plug
  • Interrupted/Insufficient/Wrong polarity/High Tension Voltage reaching spark plug terminals
  • Compression low
  • Valves sticky
  • Valve springs weak
  • Tappet clearance incorrect
  • Valve timing incorrect
  • Fuel-air mixture too lean

 

  • Correct

 

  • File and adjust gap
  • Clean
  • Use correct reach plug
  • Remove extra gasket
  • Replace
  • Check ignition System and rectify the problem
  • Rectify
  • Rectify
  • Replace
  • Adjust
  • Adjust
  • Adjust carburettor

Related Discussions:- Engine misfires motorcycle problem

Calculate steady state response, A light cantilever of rectangular section ...

A light cantilever of rectangular section (5cm deep and 2.5 cm wide) has a mass fixed at its free end. Find the ratio of frequency of free lateral vibration in vertical plane to th

Metallurgy, Write a literature review on the manufacture and application of...

Write a literature review on the manufacture and application of metallurgical cokes in Nigeria.

COMPRESSOR PROBLEM FROM CUSTOMER, OUR CUSTOMER HAD APROBLEM WITH OUR CUSTO...

OUR CUSTOMER HAD APROBLEM WITH OUR CUSTOMER ,AND ME AS AMECHANICLAL ENGINEER FOUND THE PROBLEM

Explain the working of radial drilling machine, Normal 0 false ...

Normal 0 false false false EN-IN X-NONE X-NONE MicrosoftInternetExplorer4

Production management, Production management: In this Secetion, you ha...

Production management: In this Secetion, you have studied the introduction of production management. Functional units in an organization, features of production management and

Show the support locations for truckable skid, Q. Show the support location...

Q. Show the support locations for truckable skid? Unless instructed otherwise by Engineer, support locations for truckable skid shall be determined by skid Vendor. Support loca

Implementation of material requirement planning, Implementation of Material...

Implementation of Material Requirement Planning: The total requirements for a material from an MRP schedule are given in the following table :

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd