engeneering surveying, Civil Engineering

Assignment Help:
demonstrate your understanding of the term setting out

Related Discussions:- engeneering surveying

Reasons of using compressed air as drilling fluid, Q. Reasons of using comp...

Q. Reasons of using compressed air as drilling fluid? For rotary drilling in ground investigation works, drilling fluid is generally used to clear and clean the cuttings from t

Convert reduced bearings into whole circle bearings, Example: Convert t...

Example: Convert the following reduced bearings into whole circle bearings: (i) N 65° E                           (ii) S 43° 15′ E (iii) S 52° 30′ W           (iv)

Explain the routine inspections - inspection of bridge, Explain the Routine...

Explain the Routine inspections - inspection of bridge? These determine the physical and functional condition of the structure, identifying changes from the inventory, baseline

Sub-base for concrete carriageway - non-strength provider, Sub-base for con...

Sub-base for concrete carriageway - non-strength provider Essentially sub-base for a concrete carriageway is provided for the below reasons: (i)  It provides aneven and smo

Stress corrosion of pre-stressing steel, Stress corrosion of pre-stressing ...

Stress corrosion of pre-stressing steel Stress corrosion is crystalline cracking of metals under tensile stresses in the presence of corrosive agents. Conditions for stress cor

How to calculate the coefficient of permeability, The discharge of water co...

The discharge of water collected from a constant head permeameter in a period of 15 minutes is 500 ml. The internal diameter of the permeameter is 5 cm and the measured difference

Elastic curve, elastic curve of a simply supported beam with triangular loa...

elastic curve of a simply supported beam with triangular load

Explain the dry density and buoyant unit weight, A partially saturated soil...

A partially saturated soil from an earth fill has a natural water content of 19% and a bulk unit weight of 19.33 kN/m 3 . Suppose the specific gravity of soil solids as 2.7, comput

Roads, wbm road step by step procedure

wbm road step by step procedure

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd