Energy Conservation Building Codes

It encompass the norms and standards of energy consumption expressed in terms of per square meter of the area wherein energy is used.

The main provisions of the Act on Energy Conservation Building Codes are as given below:

  1. The BEE would prepare guidelines for Energy Conservation Building Codes (ECBC);
  2. ECBC would be remembered to suit local climate conditions or other compelling factors through the respective states for commercial buildings constructed after the rules relating to energy conservation building codes have been notified. Additionally, these buildings should have a linked load of 500 kW or contract demand of 600 kVA and above.
  3. Energy audit of specific designated commercial building consumers would also be prescribed. Through energy audit, we mean verification, monitoring and analysis of energy use involving submission of technical report containing recommendations for improving energy efficiency with cost advantages analysis and an action plan to decrease energy consumption.

Related Discussions:- Energy conservation building codes

Lift control unit, You are required to design and document  the hardware de...

You are required to design and document  the hardware design  for a 68HC12D60 based Lift Control Unit (LCU). This design includes  the Input/Output hardware for interfacing with  l

Explain the terms dielectric constant and dielectric loss, Explain the term...

Explain the terms dielectric constant and dielectric loss. Dielectric Constant or Permittivity: all insulating materials possess an electrical capacitance. The capacitance of

Factors affecting high commercial losses, Factors Affecting High Commercial...

Factors Affecting High Commercial Losses Commercial losses in our country occur mainly because of the following reasons: Incorrect assessment of the energy consum

Bode plot, Hai.. i have been given a open loop transfer function to draw a...

Hai.. i have been given a open loop transfer function to draw a bode plot with a particular K value and they asked me to find the value of K for which the phase margin becomes 45d

Phantom or fictitious loading method, Phantom or Fictitious Loading Method ...

Phantom or Fictitious Loading Method While the capacity of meters under test is extremely high, testing with actual load method would includes a considerable loss of power and

Explain the magnetisation- curves of magnetic materials, Explain the magnet...

Explain the magnetisation- curves of magnetic materials. The major characteristic of a ferromagnetic substance is domain structure of it. Every crystal of a ferromagnetic subst

Compute the load power factor, Considering Figure, let balanced positive-se...

Considering Figure, let balanced positive-sequence, three-phase voltages with ¯V AB = 100√3 0° V (rms) be applied to terminals A, B, and C. The three-phase wye-connected balanced

Temperature triggering , Temperature Triggering At high temperature th...

Temperature Triggering At high temperature the leakage current  of junction J 2 increases. This leakage  current is collector  current of tr 1 and Tr 2 . So rise in temperat

Dynamic response of control systems, Q. Dynamic Response of Control Systems...

Q. Dynamic Response of Control Systems? The existence of transients (and associated oscillations) is a characteristic of systems that possess energy-storage elements and that a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd