Emulsified asphalts or cutback asphalts, Civil Engineering

Assignment Help:

Question

Have to emulsified asphalts or cutback asphalts be selected as staple coat in bituminous road works?


Answer

Emulsified asphalt is a postponement of asphalt in water by using an emulsifying agent that imposes an electric charges on asphalt particles therefore they will be join and cement together. On other hand, cutback asphalt is purely asphalt dissolved in petroleum. Purpose of addition emulsifying agent in water or petroleum is to decrease viscosity of asphalt in low down temperatures.

 


Related Discussions:- Emulsified asphalts or cutback asphalts

Staircase, The Figure 1 below shows a section through a stairway for a gara...

The Figure 1 below shows a section through a stairway for a garage in a new proposed dwelling. The stairway is 3 meters wide with 300 mm wide treads(7 treads) and 170 mm high riser

Design of steel structure, design acolumn spice for column sections SC 250 ...

design acolumn spice for column sections SC 250 and SC 220 carrying a load of 500 KN

What is admixtures, Q. What is Admixtures? These are the substance whic...

Q. What is Admixtures? These are the substance which are added to the concrete to improve its qualities either its placing or in its subsequent performance. An admixture may be

Explain the principle of working of shock transmission unit, Explain the Pr...

Explain the Principle of Working of Shock Transmission Unit? The STU consists of a machined cylinder with a transmission rod that is connected at one end to the structure and a

Ocf, location of hydrolic jump

location of hydrolic jump

Energy equation, find the pressure head at 2-2 if the rate of flow in pipe ...

find the pressure head at 2-2 if the rate of flow in pipe is 0.36m^3/s

Calculate benefit cost ratio of most cost effective device, A city is tryin...

A city is trying to decide which of two traffic devices to install. Device A costs $1000 and has useful life of five years.  Device A can be expected to result in $300 savings annu

Show method of greasing, Method of Greasing : Greasing of fixed end require...

Method of Greasing : Greasing of fixed end requires 20 to 25 minutes. The lifting is hardly 10 mm, ensuring that the gap is created between saddle block and knuckle pin. Saddle is

Determine the coordinate for point r, For the project work points (x,y) sho...

For the project work points (x,y) shown in the figure the bearing of point R is due West. The coordinate for point R is most nearly:    Solution: Determine the length o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd