Electrical de-icing system maintenance, Other Engineering

Assignment Help:

ELECTRICAL DE-ICING SYSTEM MAINTENANCE:

Tests of the system must be carried out when the servicing schedule required it or when a component has been replaced.  Typical tests are outlined below.

  • Continuity and resistance checks should be carried out before the installation of a propeller or when the efficiency of an overshoe's heating surface is suspect. The values of resistance that the elements should have are laid down in the Maintenance Manual.
  • Insulation checks are required to ensure that there is no breakdown of the element's insulation from the propeller blades or other metallic objects.
  • Voltage proof checks are used to ensure that no insulation breakdown exists between the blade and heater element. They involve applying a high voltage between the blade and element and ensuring that no leakage exists. These checks are normally carried out after repairs to the overshoe.
  • Functional tests of the ice protection system chan be carried out noting the current displayed for each of the phases of a.c. power on the flight deck ammeter. To prevent overheating of the elements the engine must maintain a minimum speed while the heating is on, as this allows a flow of air over the blades and engine intake. Some types of aircraft reduce the voltage of the system when the air / ground sense is in the ground mode and this lower voltage must be taken into account when monitoring the ammeter.

Related Discussions:- Electrical de-icing system maintenance

Water chemistry, distinguish between priming and foaming

distinguish between priming and foaming

Unit cell, Q.  What is a unit cell? Ans. UNIT CELL AND LATTICE CONST...

Q.  What is a unit cell? Ans. UNIT CELL AND LATTICE CONSTANT: The smallest components of space lattice are known as unit cell or in other words when the smallest unit repea

Traffic management, (a) Discuss the requirements, specifications and specia...

(a) Discuss the requirements, specifications and special requirements for the  design of arterial road networks and residential area street networks in a developing suburban region

Demand schedual, How do I create a demand schedual for 1 year?

How do I create a demand schedual for 1 year?

Mba financial management , Which type of financing is appropriate to each f...

Which type of financing is appropriate to each firm caselet

Signal modulation, Signal modulation Modulation involves the modificati...

Signal modulation Modulation involves the modification of some property of a (usually sinusoidal) carrier waveform. The process of recovering the original signal from the modul

Asp.net, difference between inline code and code behind file in asp.net

difference between inline code and code behind file in asp.net

Propeller overspeed governors, PROPELLER OVERSPEED GOVERNORS: These dev...

PROPELLER OVERSPEED GOVERNORS: These devices protect against overspeed, they are separate governors to the P.C.U. and direct oil during an overspeed situation to coarsen the bl

The compression after impact test, This Compression After Impact (CAI) test...

This Compression After Impact (CAI) test fixture was developed by the Boeing Company. The specimen, typically, but not necessarily, a quasi-isotropic laminate, is 6" long, 4" wide,

Presintering, Presintering is an operation in which the powder metallurgy ...

Presintering is an operation in which the powder metallurgy components after compaction are heated for a short time to a temperature considerably below the final sintering tempera

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd