Electrical de-icing system maintenance, Other Engineering

Assignment Help:

ELECTRICAL DE-ICING SYSTEM MAINTENANCE:

Tests of the system must be carried out when the servicing schedule required it or when a component has been replaced.  Typical tests are outlined below.

  • Continuity and resistance checks should be carried out before the installation of a propeller or when the efficiency of an overshoe's heating surface is suspect. The values of resistance that the elements should have are laid down in the Maintenance Manual.
  • Insulation checks are required to ensure that there is no breakdown of the element's insulation from the propeller blades or other metallic objects.
  • Voltage proof checks are used to ensure that no insulation breakdown exists between the blade and heater element. They involve applying a high voltage between the blade and element and ensuring that no leakage exists. These checks are normally carried out after repairs to the overshoe.
  • Functional tests of the ice protection system chan be carried out noting the current displayed for each of the phases of a.c. power on the flight deck ammeter. To prevent overheating of the elements the engine must maintain a minimum speed while the heating is on, as this allows a flow of air over the blades and engine intake. Some types of aircraft reduce the voltage of the system when the air / ground sense is in the ground mode and this lower voltage must be taken into account when monitoring the ammeter.

Related Discussions:- Electrical de-icing system maintenance

Fire precautions - fire protection engineering, Fire precautions - fire pro...

Fire precautions - fire protection engineering: Fire precautions include: Protecting escape routes in fire resisting construction, Providing fire doors between

Dsp, relationship between z plane and s plane in bilinear transformation me...

relationship between z plane and s plane in bilinear transformation method

Chromizing, advantages and disadvantages

advantages and disadvantages

Assignment, all about pepsi company symbol PEP 1. What is the name of the ...

all about pepsi company symbol PEP 1. What is the name of the company? What is the industry sector? 2. What are the operating risks of the company? 3. What is the financial risk

Basic instrumentation system, A basic instrumentation system consists of a ...

A basic instrumentation system consists of a transducer, conditioning amplifier, and analog digital converter connected (in general) by analog and digital transmission lines.

Totipotency, Why do only plant cell have totipotency?

Why do only plant cell have totipotency?

Design a pavilion , i need somone to design a pavilion for me

i need somone to design a pavilion for me

Crystal structure, how can we determine the crystal structure of material b...

how can we determine the crystal structure of material by having interplanar spacing d?

Difference between soldering, Q. What are the differences between soldering...

Q. What are the differences between soldering, brazing and welding? Ans. S.No.  Welding Soldering Brazing

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd