Electrical de-icing system maintenance, Other Engineering

Assignment Help:

ELECTRICAL DE-ICING SYSTEM MAINTENANCE:

Tests of the system must be carried out when the servicing schedule required it or when a component has been replaced.  Typical tests are outlined below.

  • Continuity and resistance checks should be carried out before the installation of a propeller or when the efficiency of an overshoe's heating surface is suspect. The values of resistance that the elements should have are laid down in the Maintenance Manual.
  • Insulation checks are required to ensure that there is no breakdown of the element's insulation from the propeller blades or other metallic objects.
  • Voltage proof checks are used to ensure that no insulation breakdown exists between the blade and heater element. They involve applying a high voltage between the blade and element and ensuring that no leakage exists. These checks are normally carried out after repairs to the overshoe.
  • Functional tests of the ice protection system chan be carried out noting the current displayed for each of the phases of a.c. power on the flight deck ammeter. To prevent overheating of the elements the engine must maintain a minimum speed while the heating is on, as this allows a flow of air over the blades and engine intake. Some types of aircraft reduce the voltage of the system when the air / ground sense is in the ground mode and this lower voltage must be taken into account when monitoring the ammeter.

Related Discussions:- Electrical de-icing system maintenance

Eng, all projrct is correct excpet for last part it will not fire a table...

all projrct is correct excpet for last part it will not fire a table

Thermodynamics.., Steam enters in the turbine at 6 MPa and 450 deg C and ex...

Steam enters in the turbine at 6 MPa and 450 deg C and expands at some intermediate pressure 60 % of steam is extracted and remainder expands to 10 kPa at this Investigate the effe

Operations research, At a machine tool plant, five jobs must be completed e...

At a machine tool plant, five jobs must be completed each day. The time it takes to do each job depends on the machine used to do the job. If a machine is used at all, there is a s

Imaging seekers , Imaging Seekers  Although there are a wide variety...

Imaging Seekers  Although there are a wide variety of imaging sensors (cameras), the majority of modern aircraft systems are based on conventional TV camera technologies (al

Cisco, how can i operate cisco switches without packet tracer?

how can i operate cisco switches without packet tracer?

Engineering Risk and Reliability , The demand placed on a system is describ...

The demand placed on a system is described by a lognormally distributed random variable with mean 50 and standard deviation of 10. The capacity of the system is modeled by a Weibul

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd