ELECTRICAL DE-ICING SYSTEM MAINTENANCE:

Tests of the system must be carried out when the servicing schedule required it or when a component has been replaced.  Typical tests are outlined below.

  • Continuity and resistance checks should be carried out before the installation of a propeller or when the efficiency of an overshoe's heating surface is suspect. The values of resistance that the elements should have are laid down in the Maintenance Manual.
  • Insulation checks are required to ensure that there is no breakdown of the element's insulation from the propeller blades or other metallic objects.
  • Voltage proof checks are used to ensure that no insulation breakdown exists between the blade and heater element. They involve applying a high voltage between the blade and element and ensuring that no leakage exists. These checks are normally carried out after repairs to the overshoe.
  • Functional tests of the ice protection system chan be carried out noting the current displayed for each of the phases of a.c. power on the flight deck ammeter. To prevent overheating of the elements the engine must maintain a minimum speed while the heating is on, as this allows a flow of air over the blades and engine intake. Some types of aircraft reduce the voltage of the system when the air / ground sense is in the ground mode and this lower voltage must be taken into account when monitoring the ammeter.

Related Discussions:- Electrical de-icing system maintenance

MIMO, I need some help

I need some help

Wing design for a sports glider , Wing design for a sports glider  Th...

Wing design for a sports glider  The justification of the aerofoil selection with appropriate data, based on tunnel work or computational analysis.  Sizing of the wing in

Aerofoil aerodynamics -framework, Framework In the laboratory we will de...

Framework In the laboratory we will deal with low speed flows, at first using the potential flow solver. We will also investigate behaviour for the NACA 4-series of aerofoils.

Apu starting sequence in aircraft , Apu starting sequence in aircraft : ...

Apu starting sequence in aircraft : In figure the APU control unit receives its power from the aircraft battery. By moving the APU switch to ‘ON', power is provided to the i

Fire alarm systems, Fire alarm systems: All buildings require a means ...

Fire alarm systems: All buildings require a means by which the warning  of  fire  can  be  given  to  all occupants.  In the very smallest premises this might be achievable by

Cells, what are the advantage of lithium cell

what are the advantage of lithium cell

Project, list 10 major project topic in agricultural engineering

list 10 major project topic in agricultural engineering

Wireless sensor networks, can we construct a body area sensor network in ma...

can we construct a body area sensor network in matlab as in ns-2.

Case analysis, Construct the pro forma cash flow statements for Bloomington...

Construct the pro forma cash flow statements for Bloomington Clinics for five years into the future using the data given in the case plus the most likely growth estimates. a. Wha

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd