Elaborate the term - prestressed concrete pipes, Civil Engineering

Assignment Help:

Elaborate the term - Prestressed concrete pipes

Liquid retaining structures, such as circular pipes, tanks and pressure vessels are suited for circular prestressing. The circumferential hoop compression produced in concrete by prestressing counterbalances the hoop tension developed due to the internal fluid pressure. A reinforced concrete pressure pipe requires a large amount of reinforcement to ensure low-tensile stresses resulting in a crack-free member. Circular prestressing produces the required condition of a crack-free member and the material is used more efficiently. Shrinkage cracks also are eliminated in such a situation.

 


Related Discussions:- Elaborate the term - prestressed concrete pipes

Write a short note on economic span of a bridge, Q. Write a short note on E...

Q. Write a short note on Economic Span of a Bridge? The span for which the total cost of bridge will be minimum is known as the economic span. The ratio of Cost of super str

Co, compressive stenght assigments.

compressive stenght assigments.

Ocf, location of hydrolic jump

location of hydrolic jump

Find the normal stress, Find the normal stress: Figure 1 shows the pro...

Find the normal stress: Figure 1 shows the projection of a rectangular prism ABCD, formed by adhesive bonding of two triangular prisms ABC and ACD. The state of stress in the

Remedial measures for problems in turbid water - refraction, Define Remedia...

Define Remedial measures for Problems in Turbid Water - Refraction? There is little that can be done to overcome the effects of refraction. Image definition and contrast in tur

Topographical survey and preparation of drawings, Topographical Survey and ...

Topographical Survey and Preparation of Drawings: Topographical Survey for a road project consists of three sequential stages: (a) Reconnaissance Survey, including a study

Survey.., collect the field deta manualy and drw the drawing as per scale

collect the field deta manualy and drw the drawing as per scale

Determine the head added by the pump, Primary effluent wastewater at 60 o F...

Primary effluent wastewater at 60 o F (v = 1.217 x 10 -5 ) is pumped to the top of a trickling filter (TF) a total of 75 vertical feet through schedule-40 welded steel pipe. The fl

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd