Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Find out the maximum bending stress in beam, Q. A rectangular beam of 200 m...

Q. A rectangular beam of 200 mm in breadth and 400 mm in depth is simply supported over span of 4m  and carries distributed load of 10 KN/m. Find out the maximum bending stress in

Classification of cast iron, Classification of Cast Iron: CI having C...

Classification of Cast Iron: CI having C in form of cementite is named as white cast iron. Microstructure of that CI consists of pearlite, cementite and ledeburite. Whether C

Define the abrasive jet cutting machines, Define the Abrasive Jet Cutting M...

Define the Abrasive Jet Cutting Machines 1. Abrasive jet cutting machines which are used to cut sheet materials or to remove materials of work piece from a surface by generatin

What do you mean by risers and downcomers, Q. What do you mean by Risers an...

Q. What do you mean by Risers and Downcomers? Risers and downcomers shall be staggered along the shell of the WHB and steam drum for uniform water/steam circulation in the syst

Show hazards associated with plants, Q. Show Hazards associated with plants...

Q. Show Hazards associated with plants? Hazards associated with plants will typically include the following: • Inherent fire hazards presented by the release of flammable g

Evaluate the heat input per day, The input-output curve of a 60 MW power st...

The input-output curve of a 60 MW power station is provided by : I = 10 6 [8 + 8L + 0.4L 2 ] Kcl/hour where I is the input in the Kcal/hour and L is the load in MW. (a) Ev

Describe about chain-wire and tape gauges, Q. Describe about Chain-wire and...

Q. Describe about Chain-wire and tape gauges? Chain, wire and tape gauges are fixed on structures like bridges and the weight is lowered to touch the water surface. Movable sti

#tTORQUE, HOW TO CALCULATE OUTPUT TORQUE OF HELICAL GEAR BOX

HOW TO CALCULATE OUTPUT TORQUE OF HELICAL GEAR BOX

Air-gas cross-limiting and air-gas ratio control, Q. Air-Gas Cross-Limiting...

Q. Air-Gas Cross-Limiting and Air-Gas Ratio Control? The Steam Generator firing demand signal is directed to two discrete signal selectors. A low signal selector ensures that

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd