Economic order quantity, Mechanical Engineering

Assignment Help:

Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Objectives of tools and equipment , Objective: After studying tools and eq...

Objective: After studying tools and equipment, you should be able to list various tools, measuring equipment required in a motorcycle workshop, and identify and use ap

Heat engine - thermodynamics, HEAT ENGINE - Thermodynamics: HE A T ...

HEAT ENGINE - Thermodynamics: HE A T ENGINE. A heat engine is a thermodynamics system that operates in a cycle in which heat can be transferred from heat source to heat si

CAPP, Applications of capp

Applications of capp

Resistor-fundamentals of electricity , Resistor: The wire that oppose...

Resistor: The wire that opposes (resists) the flow of current through it by virtue of its property is called resistor. This property is known as resistance. The resistance is

Permanent way - railways, Permanent Way: Definition In railwa...

Permanent Way: Definition In railway engineering, the permanent way refers to the earthen formation and the track structure over it. Gauge The separation

Determine reactions of the overhanging beam, Determine reactions of the ove...

Determine reactions of the overhanging beam: Determine r eactions at points A and B of the overhanging beam as shown in the figure given below.

Chain conveyors, Chain conveyors consists of overhead mounted endless cha...

Chain conveyors consists of overhead mounted endless chain. It is supported from the ceiling and has a fixed path to travel. It saves valuable floor space. The arrangement i

Find out deflection under the load, Find out Deflection under the load: ...

Find out Deflection under the load: A beam of span 4 m is subject to a point load of 20 kN at 1 m from the left support and a Udl of 10 kN/m over a length of 2 m from the righ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd