Economic Order Quantity:
Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.
Solution
d' in above example is
d = 500 /250 = 2 and lead time is 12 days.
From the equation,
R = d'L + z σL = 2 (12) + z (20)
Since, in this case z is 1.64. Substituting this value of z, we achieved
R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units
This illustrated that when the stock on hand gets down to 56 units, order 100 more.
What do you mean by refrigeration system
what is the dimensions of drum peel strength testing fixtures
POWER SOURCES FOR ARC WELDING Electric arc welding processes constitute a majority of all the welding processes. Most of the weldable materials can be joined by arc welding. D
Atomic Hydrogen Welding In this process, an arc is struck between two tungsten electrodes using AC power supply.The Streams of hydrogen gas are passed from orifices around the
Compound Stress: Define Compound Stress. Sol.: Simple stresses mean tensile stress or compressive stress or shear stress. The tensile and compressive stresses act on p
Arm of Couple: Explain couple and Arm of couple? Sol.: If the two equal and opposite parallel forces (that is equal and unlike) are acting on a body, they do not have a
A fictious force or pseudo force is an imaginary force that acts on a body in non inertial frame. it is opposite in direction of accelaration of non inertial frame.
Q. What is Issued for Approval? This initial formal issue of the P&IDs to the Customer incorporates the process development agreed to in the approved IFD level PFDs. In additi
There is risk of wet H 2 S corrosion in all emulsion and gas lines from the Inlet Separator up to and including the Treater. Full compliance to NACE is highly recommended to contro
offset method to draw parabola
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd