Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Determine the air standard efficiency, Compare the efficiency of Diesel, ot...

Compare the efficiency of Diesel, otto and Dual combustion cycle on the basis of same compression ratio and same heat input. In an otto cycle air at 17 o c and 1 bar is compressed

Entropy, What is entropy microscopically

What is entropy microscopically

Optimization, what are the different method for worm gear optimization

what are the different method for worm gear optimization

Explain the hydrostatic sensor paver machine, Explain the Hydrostatic senso...

Explain the Hydrostatic sensor paver machine Machine Name: - Hydrostatic sensor paver machine   We give Mechanical Paver and Mechanical Screed, which are used for laying w

Explain milling fixture, Explain Milling Fixture? A milling fixture...

Explain Milling Fixture? A milling fixture is a work holding device which is firmly clamped to the table of milling machine. It holds the work piece in correct position as

Degree of super heat - thermodynamics, Degre e of Super Heat: It is d...

Degre e of Super Heat: It is difference between the temperature of superheated steam and saturation temperature resultant to the given pressure. So, the degree of superhea

Design wellheads and wellpads, Q. Design Wellheads and Wellpads? Hydroc...

Q. Design Wellheads and Wellpads? Hydrocarbon-producing wellheads and wellpads shall be located in open, well ventilated areas with as much segregation from other critical equi

Working of engine lubrication system , Working of Engine Lubrication System...

Working of Engine Lubrication System: The oil flows from oil pump into the distribution chamber, where it is divided into two parts. One part enters into the right crankcase cove

Compute the angular velocity of the wheel, Compute the angular velocity of ...

Compute the angular velocity of the wheel: A wheel of 0.5 m radius rolls over a horizontal surface without slipping as illustrated in Figure (a). The velocity of its centre is

What are the objectives of bearing capacity, What are the objectives of bea...

What are the objectives of bearing capacity? The objectives of bearing capacity: a. identify the possible modes of failure that a shallow foundation can undergo, b. under

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd