Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Cylinder series test, Cylinder Series Test A series of round bars of ...

Cylinder Series Test A series of round bars of various diameters are austenitized and quenched into oil or water. The bars are long sufficient hence the cooling of section at

Flange assembly with torque measurement, Q. Flange Assembly with Torque Mea...

Q. Flange Assembly with Torque Measurement? Select the proper bolts and gasket for the intended service. Use only new, undamaged gaskets. Lubricate the bolt threads and nut

Storage and handling of epoxy powder, Q. Storage and Handling of Epoxy Powd...

Q. Storage and Handling of Epoxy Powder? Coating materials shall be stored, handled and applied in strict accordance with procedures as outlined by the coating manufacturer, ex

Evaluation of machine design, With the help of diagram , depict the evaluat...

With the help of diagram , depict the evaluation of Machine Design. Discuss in detail Technical feasibility, finanacial and economic feasibility, social and environmental feasib

How is aluminium conductor steel reinforced used, ACSR (Aluminium Conductor...

ACSR (Aluminium Conductor Steel Reinforced) are used as  (A)  over head transmission lines.  (B)  super conductors. (C)  fuse  (D)  underground cables.

Punches -tool and equipment , Punches Figure: Punches A bar wh...

Punches Figure: Punches A bar which carries a sharp point at one end and used to make a permanent mark on a part is called punch. The point is hard and tempered so tha

Test analysis, Test Analysis:             First new sand blasting mach...

Test Analysis:             First new sand blasting machine prototype had arrived Asia. Installation of the machine had been carry out by external vendor. We test run the machi

Explain several materials used for cutting tools, What are the factors resp...

What are the factors responsible for the development of newer tool materials. Explain several materials used for cutting tools. List four kinds of tool wear.

Determine the springs needed to absorb the energy, Determine the springs ne...

Determine the springs needed to absorb the energy: A vehicle weighing 28 kN and running at 2.5 m/sec is to be brought to rest by a buffer springs. Determine the number of spri

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd