Economic order quantity, Mechanical Engineering

Assignment Help:

Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

How are the refrigerants classified, How are the refrigerants classified? D...

How are the refrigerants classified? Describe the desirable property of a good refrigerant. Explain in brief the thermodynamics, safe and physical working property of an ideal r

Laser sources-carbon dioxide (co2) lasers, Carbon Dioxide (CO 2 ) Lasers ...

Carbon Dioxide (CO 2 ) Lasers   The CO 2 laser is a gas discharge device and it operates by electric excitation of an active medium that is a mixture of helium, nitrogen an

Evaluate the support required by body on plane, Evaluate the Support requir...

Evaluate the Support required by body on plane: A body having weight 50KN rests in limiting equilibrium on rough plane, whose slope is 30º. The plane is raised to a slope of

Provision of aeration by sparging, Three basic types for microbial systems:...

Three basic types for microbial systems: Porous, nozzle and orifice Porous sparger  Laboratory operation, usually constructed from sintered glass or metal. Disadvantages a

Calculate stress to cause failure - creep parameters, Calculate stress to c...

Calculate stress to cause failure - Creep Parameters: From creep tests on 713 C alloy the constant C in Larson-Miller parameter is determined as - 85.75. In rupture test a spe

What are advantages and limitations of job evaluation, a) Describe producti...

a) Describe productivity. Give comparison of production and productivity. b) Write down characteristics of batch production. c) What are advantages and limitations of job eva

Manufacturing, #draw a net sketch of the geometry of a single point tool.

#draw a net sketch of the geometry of a single point tool.

Improvement of existing airport, Improvement Of Existing Airport: The ...

Improvement Of Existing Airport: The improvements that are usually needed for existing airports fall under the following categories : (a)        Extension of runway to acco

Clearence, what is clearance?what is the need of clearance?differences betw...

what is clearance?what is the need of clearance?differences between with clearance and with out clearance?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd