Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.
Solution
d' in above example is
d = 500 /250 = 2 and lead time is 12 days.
From the equation,
R = d'L + z σL = 2 (12) + z (20)
Since, in this case z is 1.64. Substituting this value of z, we achieved
R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units
This illustrated that when the stock on hand gets down to 56 units, order 100 more.
#question.I am doing a ,ini project on Hovercrafts .As i am from mechanical i need assistance regarding control over brushless motors.
Requirements for Standard Interface The interface must be capable of handling all kinds of manufacturing data. There should be no information loss when data is transf
Example of simple exponential smoothing: A TV manufacturer utilizes simple exponential smoothing with α = 0.1 to forecast demand. For the first week of March, the forecast was
Use three frame elements to analyse the frame structure as depicted in the image below subjected to combined loadings: a) a concentred load applied on Element 1 at its 1/3 leng
how it works
A semi-elliptic multi-leaf spring is needed for the suspension of the rear axle of a truck. It consists of two extra full-length leaves and ten graduated length leaves including th
Industrial had been producing various types of medical products. One of the manufacture lines is Blade Department. Recently we had received a complained from Headquarter regarding
Determine the concurrent forces: Four coplanar concurrent forces act at point and keep it at rest. These are mention in Figure. Determine the forces P and Q. Solution
Potential energy (PE) The energy possessed by body or system by virtue of its position above the datum level. The work done is because of its falling on earth's surface. Po
a concrete column of 350mm diameter is reinforced with 4 bars of 25mm diameter . find the stress when the concrete is subjected to a stress of 4.5 MPa . also find the safe load in
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd