Economic Order Quantity:
Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.
Solution
d' in above example is
d = 500 /250 = 2 and lead time is 12 days.
From the equation,
R = d'L + z σL = 2 (12) + z (20)
Since, in this case z is 1.64. Substituting this value of z, we achieved
R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units
This illustrated that when the stock on hand gets down to 56 units, order 100 more.
Illustration of CAM A cam rotating at consisted angular velocity operates an oscillating follower. Draw cam profile for the given data: Angular displacement of the follower
Industrial had been producing various types of medical products. One of the manufacture lines is Blade Department. Recently we had received a complained from Headquarter regarding
What is Drilling It is an operation by which holes are produced in solid metal by means of revolving tool known as „Drill?. The various operations on drilling machine.
Describe various classifications of instruments and differentiate between null type and deflection of instruments with suitable examples.
Determine the bending (o-, ) and shear stress ( Tx), ) at the surface element shown on the solid circular shaft below. Use Mohr's circle to determine the principle stresses, a l
In an orthogonal cutting process, following data were taken. Chip length of 80mm was obtained with an uncut chip length of 200mm and the rake angle used was20 degrees and depth of
What do you mean by refrigeration system
common formula for first law of thermodynamics #Minimum 100 words accepted#
Question: A 3-phase, 15 kV, 4-pole, cylindrical rotor synchronous generator is connected to infinite bus running at 50 Hz. The synchronous reactance of the machine is X s = 0.
Carburettor Cleaning: Carburettor needs to be cleaned otherwise the jets may get clogged which may supply an inadequate amount of air fuel mixture. Inadequate amount of air fuel
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd