Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Physics, State and explain parallelogram law of vectors

State and explain parallelogram law of vectors

Isentropic flow through the nozzle, Isentropic flow through the nozzle: ...

Isentropic flow through the nozzle: In an isentropic flow through the nozzle, air flows at rate of 600Kg/hr. At inlet to the nozzle, the pressure is 2Mpa and temperature is 1

Find out the deflection at mid-span - cantilever beam, Find out the deflect...

Find out the deflection at mid-span - cantilever beam: A double overhanging beam of 12 m length rests on supports symmetrically, 8 m apart. A load of 80 kN acts at one free en

Hot pressing-manufacturing methods of ceramics, Hot Pressing This pres...

Hot Pressing This pressing requires application of pressure throughout sintering. In usual understanding hot pressing comprises in applying a unidirectional pressure via the a

Assignment help, i need help in my assignment it''s due few days

i need help in my assignment it''s due few days

Explain the Wire-frame models, WIRE-FRAME MODELS  The wire-frame model ...

WIRE-FRAME MODELS  The wire-frame model is perhaps the oldest way of representing solids. According to this model, any solid is represented by its edges and vertices. A wire-fr

Show hazard assessment of plant operation, Q. Show Hazard assessment of pla...

Q. Show Hazard assessment of plant operation? Using the hazard assessment of each plant operation will help establish the layout or orientation of process units within the plan

Describe shear force and bending moment, Describe the following terms:- ...

Describe the following terms:- a) Shear force and bending moment b) Concentrated load, Uniformly varying load and Uniformly distributed load c) Beam & Types of beam. d)

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd