Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Theory of machine, In turning moment diagram. why we start to draw curve fr...

In turning moment diagram. why we start to draw curve from o degree?

Storage and handling of epoxy powder, Q. Storage and Handling of Epoxy Powd...

Q. Storage and Handling of Epoxy Powder? Coating materials shall be stored, handled and applied in strict accordance with procedures as outlined by the coating manufacturer, ex

MOS, limitations of euler''s theory

limitations of euler''s theory

Communication , is effective communication an integral aspect in the mechan...

is effective communication an integral aspect in the mechanical engineering field?

Working of lacashire boiler, Working of lacashire boiler: WORKIN G: ...

Working of lacashire boiler: WORKIN G: Water is filled through feed check valve. On burning fuel over grate, the hot gasses are produced which move in flue gas tubes.

Total tension in cable of the elevator, Total tension in cable of the eleva...

Total tension in cable of the elevator: An elevator having weight 5000N is ascending with an acceleration of 3m/sec 2 . During this ascent its operator which is having weig

Schedule selection -schedule evaluation-heuristics, Schedule Evaluation ...

Schedule Evaluation The schedules are evaluated as per to the criterion weighted loss of slack. Now let t 0 si be the slack (time buffer) of job I as per to the initial sched

Explain the process for using the two small pipes, Method:- Using the two s...

Method:- Using the two small pipes - Radial Drilling machine First we make a base. Then we attach column to the base. Then show the table atmiddle of the column. Then after we

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd