Economic order quantity, Mechanical Engineering

Assignment Help:

Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Define maximum allowable working pressure, Q. Define Maximum Allowable Work...

Q. Define Maximum Allowable Working Pressure? The MAWP to be marked on the Section VIII nameplate is defined as the maximum gauge pressure permissible at the top of a completed

Calculate the temperature at the center of the pipe, Heat generated uniform...

Heat generated uniformly in Stainless steel plate having k=20 W/m. 0 C. The thickness of the plate is 1cm and the heat generation rate is 500 MW/m 3 . If the two sides of the plate

Lubrication, what are the necessity of lubrication ?

what are the necessity of lubrication ?

[email protected], how i can know moulair plant calculation?

how i can know moulair plant calculation?

Calculate the pressure using density , An open test tube at 293 K is filled...

An open test tube at 293 K is filled at the bottom with 24.2 cm of Hg, and 11.2 cm of water is placed above the Hg. Calculate the pressure at the bottom of the test tube if the atm

Determine m.i. of i section about 2 centroidal axes, Q.  An I section has d...

Q.  An I section has dimensions Top flange = 8 cm × 2 cm; Bottom flange = 12 cm  × 2 cm; Web = 12 cm × 2 cm; Over all the depth of section = 16 cm. Determine M.I. of  I s

What are the advantages of powder metallurgy, Power metallurgy is much fast...

Power metallurgy is much faster production whereas holding closer sizes.

Copper and its production, Copper And Its Production Copper is marked ...

Copper And Its Production Copper is marked via a host of good engineering properties. The foremost is copper's good electrical conductivity and bulk of copper is utilized as e

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd