Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Explain pole core and pole shoe - dc generator, Pole core and pole shoe ...

Pole core and pole shoe The pole cores are made of steel laminations that are insulated from each other and riveted together. Every pole core has a pole shoe having a curved su

OPITZ alternative, I am looking for an alternative coding system to the OP...

I am looking for an alternative coding system to the OPITZ coding system for my essay thanks

Determine in brief about the residual soils, Determine in brief about the R...

Determine in brief about the Residual soils Residual soils are generally very complex and varied. They are the products of in-situ disintegration of rocks and weathering. The g

What are the instructions to charge a battery?, (a) How is specific gravity...

(a) How is specific gravity of electrolyte (battery water) measured and what should be the value of specific gravity? (b) How would you measure battery voltage and what is its reco

Explain sand and moulding sands, Q. Explain Sand and moulding sands? Sa...

Q. Explain Sand and moulding sands? Sand according to the amount of clayey matter they contain, the moulding sands are classified as: • Silica sand: Up to 20% clay. •

Hydraulic ram, definition and picture of hyreaulic ram

definition and picture of hyreaulic ram

Find out the forces in cantilevers frame, Find out the forces in cantilever...

Find out the forces in cantilevers frame: Find out the forces in the members of the cantilevers frame by the method of sections. Solution Let the equilibrium of the fr

Engineering mechanics, what is the reason that rails are made in I-section ...

what is the reason that rails are made in I-section form and not in the form of rectangular section.

Estimate the weight of the casting, Estimate the Weight of the Casting ...

Estimate the Weight of the Casting A Yoke casting shown in Figure is to be produced by sand casting process. Estimate the weight of the casting if the density of the material

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd