Economic order quantity, Mechanical Engineering

Assignment Help:

Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Computer aided synthesis, The basic aim of synthesis in design process is t...

The basic aim of synthesis in design process is to provide information which can tell you how to improve the design. In general the synthesis process gives many alternatives of

Working of boiler, Working of boiler : Water is filled in boiler ...

Working of boiler : Water is filled in boiler shell through the feed valve up to 2/3 rd of shell. Water flows down through the down take header by means of descending wa

Fatigue crack propagation, Fatigue crack propagation: If it is assumed...

Fatigue crack propagation: If it is assumed that no plastic deformation occurs around crack tip and law of fatigue crack propagation for place of above Example is da/dN =  10

Jigs and fixtures, state the purpose and function of work holder

state the purpose and function of work holder

Explain the protocol for stress testing, Q. Explain the protocol for stress...

Q. Explain the protocol for stress testing? The protocol for stress testing should be structured to include the following: 1) Continuous ECG monitoring. 2) Hard copy ECG

Determine components of the force vector, Problem - Newton's Second Law in...

Problem - Newton's Second Law in 2D A tow truck tows a 1000-kg car by applying a force of 1000 N north-northeast (67.5° above the x-axis).  a)  What are the components of th

Distance between nozzles, Every loaded blade rod is consists of 400 pieces ...

Every loaded blade rod is consists of 400 pieces of blades which around 25cm tall. The blasting nozzle vertical height different is just about 10 cm. The nozzle will blast the blad

Friction, FRICTION: you have learnt laws of friction and problems invo...

FRICTION: you have learnt laws of friction and problems involving dry friction. The relative sliding motion of one body on another body is resisted by forces called as frictio

Constant mesh type gear box , Constant Mesh Type Gear Box : Most of t...

Constant Mesh Type Gear Box : Most of the gearboxes on motorcycles are "constant mesh". That means all the gears are constantly meshed with one another and are always spinnin

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd