Economic Order Quantity:
Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.
Solution
d' in above example is
d = 500 /250 = 2 and lead time is 12 days.
From the equation,
R = d'L + z σL = 2 (12) + z (20)
Since, in this case z is 1.64. Substituting this value of z, we achieved
R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units
This illustrated that when the stock on hand gets down to 56 units, order 100 more.
Q What do you know about Series welds in spot welding? It is a welding method in which two or more spots are produced simultaneously with only one common but indirect current p
A Torsion dynamometer is used in a propeller shaft of a marine Engine. It is found that the shaft twists 2 o in a length of 20 meters at 120 r.p.m. If the shaft is hollow with 300
Beam: Sol.: A beam can be defined as a structural element which has one dimension (length) considerable larger As compared to the other two direction, which is breadth an
Resistance welding electrodes and holders Requisites For Electrodes : The resistance welding electrodes are meant for the following functions: Conducting electricity
How are footings described and introduced properly? The selection of different types of footings and the need for reinforcing the same are discussed in this unit. Methods of de
Methods of preventing it
Calculate the crack Stress Intensity Factor: If on the beam specimen of last problem two loads, each equal to 500 N, are applied at distance of 25 mm from central plane, calcu
WELDING PROCEDURE AND PERFORMANCE QUALIFICATION A total quality assurance scheme, embracing all aspects of manufacture would have necessarily made all attempts to ensure
Chassis Lubrication System : This lubrication system consists of outer body parts, which are lubricated from outside of the body. Table of Lubrication Points Sl.
a) What do ypu understand by production Planning and Control Function. Briefly mention the objective of PPC. b) There are 8 job in an auxiliary unit requiring processing on mach
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd