Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Thermodynamics, show that work is a path function and not a point funtion ?...

show that work is a path function and not a point funtion ?

What do you understand by steering gear mechanism, (a) Illustrate what do y...

(a) Illustrate what do you understand by Steering Gear Mechanism ? Describe any one Steering Gear Mechanism. (b) Write short note on Pantograph.

GD & T Expert needed to drawing chenck, Dou you have someone with good GD &...

Dou you have someone with good GD & T knowledge who can help me with ceheck, markup and comment mechanical drawings in PDF file format wich I will send?

Physics, Explain the super position of waves with neat diagrams

Explain the super position of waves with neat diagrams

Uniformly distributed load and uniformly varying load, Uniformly Distribute...

Uniformly Distributed Load and Uniformly Varying Load: Uniforml y Distributed Load (UDL) A UDL is one which is spread over beam in such a manner that the rate of loading

Expression for normal and shear stress, Expression for normal and shear str...

Expression for normal and shear stress: Derive expression for normal and shear stress on the plane AE inclined at an angle B with AB subjected to the direct stresses of compr

Generic cell control class architecture, Generic Cell Control Class Archite...

Generic Cell Control Class Architecture The initial step in designing the system is the development of classes. All classes are assigned responsibilities for specific tasks nee

Find out the deflection - vertical, Find out the deflection: Find out ...

Find out the deflection: Find out the deflection (vertical) at a distance 'a' from the tip in Example Solution As in this case there is no load at the point where the

Governor, spring combined gravity governor

spring combined gravity governor

Furnace, Tell me the type of furnace and their principle

Tell me the type of furnace and their principle

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd