Economic order quantity, Mechanical Engineering

Assignment Help:

Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Determine the reaction - cantilever, Determine the reaction: The cant...

Determine the reaction: The cantilever is shown in the figure given below; determine the reaction when it is loaded.   In cantilever at fixed end ( A ) there is three reac

Determine the economic order quantity, Determine the economic order quantit...

Determine the economic order quantity: Determine the economic order quantity and the reorder point. Given Annual demand (D) = 2,000 units Average daily demand (d) = 2,00

Radiative heat transfer, how to find view factor for a cylinder to humanbod...

how to find view factor for a cylinder to humanbody at a distance?

Desirable characteristics of the piston , Desirable Characteristics of the ...

Desirable Characteristics of the Piston Silent in operation. Seizure between piston surface and inside of cylinder should not occur. Sufficiently resistant to co

Discover the increase in pressure, Discover the increase in pressure: ...

Discover the increase in pressure: A copper tube of 50 mm diameter and 1200 mm length contains a thickness of 1.2 mm along closed ends. This is filled with water at atmospheri

Derive the finite element formulation-galerkin method, Derive the finite el...

Derive the finite element formulation  for a tapered bar element using Galerkin's method.                                                 1- Start with. 2- Use and as shap

Basic troubleshooting of motorcycle, Basic Troubleshooting of Motorcycle we...

Basic Troubleshooting of Motorcycle we have studied about the basic troubles in motorcycle operation and their solutions. It will help you in finding out the problem with the vehic

Air filter cleaning steps, Air Filter Cleaning :  Air filter filters the a...

Air Filter Cleaning :  Air filter filters the air, which enters into the carburetor. Then, this air mixes with fuel and this mixture enters into engine. If air is not clean, it wi

Compute the angular velocity of bar, Compute the angular velocity of bar: ...

Compute the angular velocity of bar: A bar AB as shown in slides so that its bottom point A has a velocity of 4 m/sec to the left along the horizontal plane. Compute the veloc

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd