Economic order quantity, Mechanical Engineering

Assignment Help:

Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Production test rings, Q. Production Test Rings? The frequency for the ...

Q. Production Test Rings? The frequency for the tests shall be as follows: • One sample at the 10th joint • One sample at the 75th joint • One sample at the 300th join

Calculate the angle of heel, a) Derive a mathematical expression for stabil...

a) Derive a mathematical expression for stability of an automobile while accelarating in a curved path? b) A motorcycle and its rider together have a mass of 250Kg and their cen

Section modulus and value of bending moment, Q. Wha t do you mean by secti...

Q. Wha t do you mean by section modulus ( Z )? What is value of bending moment in the terms of section modulus? Sol.: Section modulus is ratio of M.I. about neutral ax

Turnouts, Turnouts: A turnout is an assembly of various components wh...

Turnouts: A turnout is an assembly of various components whereby a train running on one track may be diverted to another. A sketch of a left-hand turnout is given in Figur

Asset utilization, Asset Utilization: The data listed in Tables 1 and ...

Asset Utilization: The data listed in Tables 1 and 2 provide information about M/S Forge Private Limited. Table: Annual Balance Sheet with Partial Information

Calculate days of inventory, Calculate days of inventory: From the dat...

Calculate days of inventory: From the data provided in table 1 and 2, calculate days of inventory. Solution Average Inventory Investment = (Last year inventory + Curre

Determine change in length of the bar, Determine change in length of the ba...

Determine change in length of the bar: A steel bar is subjected to loads as shown the given figure. Determine change in length of the bar ABCD of 18 cm diameter. E = 180

Kinematics in one and two dimensions , A person climbs up a escalator in 60...

A person climbs up a escalator in 60s . When he stands on it , then he is carried in the moving escalator in 30s . How much time will he take in climbing up in a moving escalator?

Cantilevered beam, A cantilevered beam is to be made of 7075-T6 aluminum ...

A cantilevered beam is to be made of 7075-T6 aluminum with a uniaxial yield strength of 469 MPa. The beam is 1m long, and is loaded with the following limit loads: a bending mome

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd