Economic order quantity, Mechanical Engineering

Assignment Help:

Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Context level data flow diagram, Context Level Data Flow Diagram In thi...

Context Level Data Flow Diagram In this section, the cell control model conversation in the former section is demonstrated by the data flow diagram as in following figure of co

Pnumatics, how to draw circuits using cascade

how to draw circuits using cascade

Yes, Which type of study require for mechanial engineering

Which type of study require for mechanial engineering

Hazardous areas classification, Hazardous Areas are formally ranked as bein...

Hazardous Areas are formally ranked as being a designated hazardous area using the relevant regional or country standards that are directly applicable to the plant design under con

What do you understand by interference, (a) Derive a mathematical expressio...

(a) Derive a mathematical expression for Maximum length of path of Contact, Maximum Length of Arc of Contact and Contact Ratio in case of Interference. (b) What do you understan

Couple, a couple can be balanced by a force equal to its magnitude?

a couple can be balanced by a force equal to its magnitude?

Entropy, Defrance between entrpy and enthalpy

Defrance between entrpy and enthalpy

What are the basic use of sand rammer, Q. What are the basic use of Sand ra...

Q. What are the basic use of Sand rammer? It is the apparatus of make specimens of moulding sand, for tests such as - permeable test, the various strength tests, and shatter te

The parts and design of the pocket amp, The problem: - Deaf blind peop...

The problem: - Deaf blind people have a huge problem when crossing the streets. They always need assistance from a sighted person or a trained dog to cross the street. There i

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd