Economic order quantity, Mechanical Engineering

Assignment Help:

Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Breakwater , Let consider the breakwater configuration shown in the figure ...

Let consider the breakwater configuration shown in the figure below. The incident wave conditions at the breakwater are a wave height of 1.5m, wave period of 7.0s and a wave crest

Engine, maximum rpm at engine

maximum rpm at engine

Hydraulic detention time, a.The closest point to discharge treated effluent...

a.The closest point to discharge treated effluent is a lake, but the pipeline is extended so it discharges into the river draining the lake. This allows a conventional secondary tr

Compute the angular velocity of bar, Compute the angular velocity of bar: ...

Compute the angular velocity of bar: A bar AB as shown in slides so that its bottom point A has a velocity of 4 m/sec to the left along the horizontal plane. Compute the veloc

Plc, proportional controller for lube oil temperature of engine working dia...

proportional controller for lube oil temperature of engine working diagram

Determine the forces in the members, A truss of 12 m span is loaded as show...

A truss of 12 m span is loaded as shown in figure below. Determine the forces in the members of the truss by method of sections.

Maintenance of railway line, Maintenance of Railway Line Importance...

Maintenance of Railway Line Importance of Maintenance The need for maintenance of railway lines arises out of the following considerations : (a) The track rests on

Clearance volume, Clearance Volume ( V C ) : The nominal volume of the c...

Clearance Volume ( V C ) : The nominal volume of the combustion chamber above the piston when it is at the top dead centre is the clearance volume. It is designated as V C an

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd