Economic Order Quantity:
Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.
Solution
d' in above example is
d = 500 /250 = 2 and lead time is 12 days.
From the equation,
R = d'L + z σL = 2 (12) + z (20)
Since, in this case z is 1.64. Substituting this value of z, we achieved
R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units
This illustrated that when the stock on hand gets down to 56 units, order 100 more.
A horizontal line ABCD measuring 9m is acted upon by forces of magnitude 400, 600, 400 and 200 N at points A, B, C, D respectively with downward direction. These point are so locat
Two concentric perforared plates are seperated by a 200mm launder and form the flow exit for a clarifier (figure 1). The inlet water flow of 1200 mcubed/hour into the clarifier is
r
Select a standard rolled steel I-section for the simply supported beam shown in figure below. Select an appropriate factor of safety and material strength. Include references for
why there is heat is not completely converted into work in ideal case?
Q. Painting of structural components of skid? Sandblasting and priming shall be carried out prior to assembly, and shall include all bolt holes, flange faces, etc. Flange gaske
If Engine Keeps on Running after Ignition is Switched Off Causes of Problem Remedy Pre-ignition due to very hot spark plug used
ES 347 - Thermodynamics Project Assigned: 3/28/2013 Due: 4/25/2013 Problem specification 5 kg of air is contained in a piston-cylinder device, initially at a pressure of 2MPa and a
Use of hartung governor
Takt Time for sand blasting: Tatk time is crucial in manufacturing process. It determines the speed of production to produce a product. Time is money toward prod
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd