Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Define 3-d lathe tool dynamometer, Define 3-D lathe Tool Dynamometer It...

Define 3-D lathe Tool Dynamometer It is possible to measure three dimensional cutting tool component with the help of 3-D lathe tool dynamometer. In spite of that we are gone f

Heat treatment, what is properties , uses and process ?

what is properties , uses and process ?

Beam, calculate the vertical reaction at A in Newtons

calculate the vertical reaction at A in Newtons

Roller conveyors, Roller conveyors are flat circular or spiral. They con...

Roller conveyors are flat circular or spiral. They consist of rollers supported in frames over which materials are allowed to move. They are driven through gravity. Genera

Design standards - planning a new airport , Design Standards: The fol...

Design Standards: The following design standards for a modern airport facility catering to latest models of aircraft may be noted for guidance.

Milling, milling machine time calcutation

milling machine time calcutation

Embrittlement-metallurgical defects, Embrittlement For use, at high str...

Embrittlement For use, at high strength, coupled with good notch toughness, all weld structure must  be Tempered low carbon martensite. Carbon and alloy steels having more than

Plastic part manufacturing process, Q. Plastic part manufacturing process? ...

Q. Plastic part manufacturing process? Plastic belongs to the family of organic materials. Organic materials are those materials which derived directly from carbon. They consis

Define the disadvantages of abrasive jet cutting machines, Define the Disad...

Define the Disadvantages of Abrasive Jet Cutting Machines Slow material removal rate. Stray cutting and hence accuracy is not good. Abrasive powder cannot be reused

Describe loose piece pattern, Loose piece pattern This type of pattern ...

Loose piece pattern This type of pattern is also used when the contour of the part is such that withdrawing the pattern from the mould is not possible. Hence during moulding th

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd