Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.


Related Discussions:- Economic order quantity

Hazardous areas classification, Hazardous Areas are formally ranked as bein...

Hazardous Areas are formally ranked as being a designated hazardous area using the relevant regional or country standards that are directly applicable to the plant design under con

Principles governing rural roads design standards, Principles Governing Rur...

Principles Governing Rural Roads Design Standards: The following principles should govern in design of rural roads : (a) Rural Roads are low volume facility serving an acc

Schedule selection -schedule evaluation-heuristics, Schedule Evaluation ...

Schedule Evaluation The schedules are evaluated as per to the criterion weighted loss of slack. Now let t 0 si be the slack (time buffer) of job I as per to the initial sched

Manufacturing technology, Details of rolling process,Different rolling meth...

Details of rolling process,Different rolling methods,

Compute monitoring and control, Compute Monitoring and Control: These are t...

Compute Monitoring and Control: These are the direct application in which the computer is connected directly to the manufacturing process for the purpose of monitoring or contr

Stresses., temparature stresses in composite bars

temparature stresses in composite bars

Willson hatnell governor, use, application benifits and working of willson ...

use, application benifits and working of willson hartnell governor

Stenght of Material, Give the assumption of pure torsion derivation of shea...

Give the assumption of pure torsion derivation of shear stress produced in circular shaft subjected to torsion

Plant layout and equipment spacing, Q. Plant layout and equipment spacing? ...

Q. Plant layout and equipment spacing? Layout refers to the location of plants (and process/power units within the plants and associated utilities (or balance of plant)) as wel

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd