(a) Borrow pits must not be dug close to telegraph poles, electric poles, level crossings, bridges a culverts, or within 800 meters of the boundary.
(b) Borrow pits must be laid out as the Engineer directions. The pits must be rectangular. The sides of borrow pits next to the toe of bank must be sloped at one to two and else where at 1 to 1.
(c ) Where the ground is low end swampy, the outer or most distant half of the borrow pits is to be excavated first.
(d) In banks over 3 metres high, the outer halves only of the borrow pits are to be marked out.
what are the details of aluminium sections and how are they connected for making a door or window
If i want to find D, and D=2a, then a=1-5 how can i show the ans is:2&4&6&8&10
Late completion of road projects
discussion of each bitumen test, its significance and importance in understanding and working with bitumen
What is the binding material of the water bound macadam road
tupes of dam
contituents of paints
Aim,materials or tools required,procedure for constructing english bond bricks
how can I use reciprocal type of leveng method to level a ground, and a procedure
fabrication methods of ironmongery
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd