Q. Earth work in high embankments?
(a) Borrow pits must not be dug close to telegraph poles, electric poles, level crossings, bridges a culverts, or within 800 meters of the boundary.
(b) Borrow pits must be laid out as the Engineer directions. The pits must be rectangular. The sides of borrow pits next to the toe of bank must be sloped at one to two and else where at 1 to 1.
(c ) Where the ground is low end swampy, the outer or most distant half of the borrow pits is to be excavated first.
(d) In banks over 3 metres high, the outer halves only of the borrow pits are to be marked out.
define structure?
important considerations in case doors and windows
Surface Dressing: Surface dressing is an application of a thin film of bituminous binder followed by a coat of aggregates of single size, rolled into position. Surface dressi
Q- Mention 5 essential properties a water proofing system should have? Ans.- water proofing system should have the following essential properties :- a) It should be im
A project engineer has ordered 100 hardwood boards, 1-1/4-in thick by 8-in wide and 8-ft long. The total board feet ordered is most nearly: Solution: 1.25" x 8" x 8' x 100
Define the statements about error analysis? I. The expected value (or: most likely; probable value) of a measurement is the value that has the highest value of being correct.
We need all types of Upper floor
calculate height of instrument?
what is reciprocal method?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd