Q. Earth work in high embankments?
(a) Borrow pits must not be dug close to telegraph poles, electric poles, level crossings, bridges a culverts, or within 800 meters of the boundary.
(b) Borrow pits must be laid out as the Engineer directions. The pits must be rectangular. The sides of borrow pits next to the toe of bank must be sloped at one to two and else where at 1 to 1.
(c ) Where the ground is low end swampy, the outer or most distant half of the borrow pits is to be excavated first.
(d) In banks over 3 metres high, the outer halves only of the borrow pits are to be marked out.
Ask questiPermanent Way:on #Minimum 100 words accepted#
What is the minimum radius, R min , that can be used on a horizontal curve with a 70 mph design speed, a maximum superelevation, e max = 8%, and a side friction factor, f = 0.10?
State the method of Pre- Tensioning It is a method of prestressing concrete in which tendons are stretched or tensioned before concreting. In this form of construction, concr
ADVANTAGE OF FLEMISH BOND
how the effective mass of charge carrier less than the rest mass
what is plastic?its types and composition and its uses as engineering material
Why hoisting and conveying equipment is very important in civil engineering?
what is black cotton soil in dry condition
pert disadvantages of software support, datacollection , interpretation of results issues
whatiscreepofmetal&typesdescribe
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd