30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 28% swell and shrinkage of 18%. The final volume of the compacted so
Question If on-site slump test fails, is it necessary that engineers allow a contractor to continue concreting works ? Answer This is an extremely traditional question raised by
soil sample investigation
natural phenomenon affecting the designs of harbours
Emulsion: An emulsion is a bituminous binder which is in a fluid form at atmospheric temperatures above O o C and requires no heating at all. Bitumen cab be converted to an e
what is imperfect frames ?
design a 3-meter cantilever slab to carry a uniform total dead load of 8.2KN/m^2 and a concentrated live load at the free end of 30 KN/m. f''c=28Mpa fy=420Mpa.
How to calculate the total loss of prestress As a general guide, it may be taken that total loss of prestress may be in the range of 20 to 25 percent of the initial prestress,
Q. Knife edge loads – representation of wheel axles? In BS5400 traffic loads for HA loading are given by uniformly distributed loads along loaded length and a knife edge load.
Question Which will be a better choice, a large diameter piles or a scheme of some smaller piles with same load capacity ? Answer Choice of a large diameter pile suff
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd