Draw the data flow diagram, Software Engineering

Assignment Help:

Go to Blackboard, and print the project scenariolocated under the Project folder. Using Visio, draw a Physical DFD ofall three business processes described in theproject scenario. The following diagrams must be included:

- Diagrams

  • Context Diagram (1)
  • Level 0 Diagram (1) - for this project the Level 0 will contain only3 main processes
  • Level 1 Diagrams (3) - one for each process on the Level 0

- Tips:

  • Start drawing the three Level 1 diagrams first. Then the Level 0 followed by the Context.
  • Draw one process symbol per paragraph!
  • Follow the DFD Requirements below!
  • Any assumptions that you make because of information not specifically stated in the assignment or the project scenario should be documented on a separate page.

Related Discussions:- Draw the data flow diagram

What is cm plan, What is CM plan? Explain the types of documents to be ...

What is CM plan? Explain the types of documents to be managed and a document naming scheme. Explain who takes responsibility for the CM procedures and creation of baselines.

Determine the meaning of vertical partitioning, Determine the meaning of ve...

Determine the meaning of vertical partitioning? Vertical partitioning often called factoring suggests that the control and work should be distributed top-down in program struct

What is a variant, What is a variant Ans) "Variants" are versions of a p...

What is a variant Ans) "Variants" are versions of a program.

Discrete mathematics, Within the discussion board area, respond to the foll...

Within the discussion board area, respond to the following questions with your thoughts, ideas, and comments. This will be the foundation for future discussions by your fellow clas

Explain in detail about the real time systems, Explain in detail about the ...

Explain in detail about the real time systems. Hard and soft real time systems. Real time and high performance. Real-Time control. Real time software design

Why software change occurs, Why software change occurs? Software change...

Why software change occurs? Software change happens because of the following reasons. New needs emerge when the software is used. The business environment changes. Errors need

What is stress testing and performance testing, What is stress testing and ...

What is stress testing and performance testing? A stress testing executes a system in a way that demands resources in abnormal quantity, volume or frequency. Performance te

Various attributes of cost drivers used in cocomo model, Various attributes...

Various attributes of cost drivers used in COCOMO model are: 1.  Physical attributes: These are concerned with needed characteristics of the software product being developed.

List the pre-requisites for white-box testing, List the pre-requisites for ...

List the pre-requisites for white-box testing The pre-requisites for white-box testing are same to that of black-box testing with one main difference: - During white-box tes

What are the various testing activities, What are the various testing activ...

What are the various testing activities? i. Test planning ii. Test execution iii. Test case design iv. Data collection v. Effective evaluation

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd