Draw a block diagram of the control loop, Other Engineering

Assignment Help:

A speed control system has an amplifier-motor-control element capable of maintaining a speed of 4000 rpm at the output shaft with no external load and an input of 8 mV to the amplifier. A tacho-generator coupled to the output shaft gives 120 mV per 100 rpm and provides the feedback signal of the closed loop system.

a) Draw a Block diagram of the control loop (Use the block diagram of a closed-loop process control system in Figure 1.7 of the textbook as a guide)

b) For an output shaft speed of 4000 rpm, determine the values of the following signals on the Block diagram:

i) feedback signal Cm

ii) actuating (error) signal, E

iii) reference input (set point) signal, R

c) A load is now applied to the output shaft such that if the actuating (error) signal remained constant, the speed would fall to 3000 rpm (ie open loop). Calculate the approximate output speed in the closed-loop system.

d) A replacement motor is fitted and this produces a no-load speed of 2500 rpm for a 8 mV input. What must the reference input (set point) signal be to provide a speed of 4000 rpm.


Related Discussions:- Draw a block diagram of the control loop

Radar engineering, Calculate the maximum range when radar operates at 10GHz...

Calculate the maximum range when radar operates at 10GHz and has peak power=10 Mwatt,S/N ratio=10dB,antenna cross section=100 mm2,target cross section=10mm2.The gain of transmittin

Functional checks of chemical de-icing systems, FUNCTIONAL CHECKS OF CHEMIC...

FUNCTIONAL CHECKS OF CHEMICAL DE-ICING SYSTEMS: Once the correct flow rate of the fluid supply has been established the distribution of the fluid flow over the blades should be

Transistors, Transistors: The transistor can be a high or low resistanc...

Transistors: The transistor can be a high or low resistance device, hence the name, which is derived from TRANSfer resISTOR.  It is used in many switching and amplifier circ

model training, You are required to undertake the following tasks: 1.    ...

You are required to undertake the following tasks: 1.      Problem Identification Download the dataset assigned to you from the module Blackboard site. Read the data description

Risk Management, discuss the values of risk analysis and how it can help in...

discuss the values of risk analysis and how it can help in decision making of project management under conditions of uncertainty

Starting worki in ccs.., 1- plot and creat x1(t)=4exp(t/5),x2(t)=Sin(2pift+...

1- plot and creat x1(t)=4exp(t/5),x2(t)=Sin(2pift+Pi/2) 2-write a c fucntion to compute convolution of n2 finite series ands plot 3-implemet an FIR filter in c in CCS

Layout and operation of typical thrust reversing system, Layout and operati...

Layout and operation of typical thrust reversing system: Clamshell door system The clamshell door system is a pneumatically operated system, as shown in detail in fig Norm

Boroscope inspections of air craft engine, Boroscope inspections: Boros...

Boroscope inspections: Boroscope inspections involve looking at components within an engine using an optical probe. The probes are inserted in to the engine through ports in th

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd