Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Electron beam focused to a fine spot, Q. How is the electron beam focused t...

Q. How is the electron beam focused to a fine spot on the face of the CRT? Sol. The functional diagram of an electrostatic focusing arrangement is shown below. The pre-accele

Explain the energy bands in solids, Explain the energy bands in solids. ...

Explain the energy bands in solids. There are as several energy bands in a solid as there are energy levels in the parent atoms. Many electrical properties of significance

Why do we cascade amplifiers, Q. Why do we cascade amplifiers? Why is RC co...

Q. Why do we cascade amplifiers? Why is RC coupling the most widely used coupling between 2 stages of a cascading amplifier? The voltage or power gain or frequency response obt

Successive-approximation analog to digital converter, Successive-approximat...

Successive-approximation analog to digital converter This converter, shown in Figure, also contains a D/A converter, but the binary counter is replaced by a successive-approxim

Dc generator, A 20kw 220v shunt generator has armature resistance of 0.07 a...

A 20kw 220v shunt generator has armature resistance of 0.07 and a shunt field resisitance 900 ohm find field loss?

Compare dispersion effects single mode and multimode fibre, Compare dispers...

Compare dispersion effects in single mode and multimode fibres? The optical fibres were categorized within two according to the number of modes it passes as: • Single mode fibre

Find the mmf needed to establish a magnetic flux, Q. Consider the toroid sh...

Q. Consider the toroid shown in figure made up of three ferromagnetic materials. Material a is nickel-iron alloy having a mean arc length la of 0.6 m; material b is medium silicon

Sketch phasor diagrams for lagging power factor load, Q. For a transmission...

Q. For a transmission-line model that includes only the series impedance Z, sketch phasor diagrams for: (a) Lagging power factor load. (b) Leading power factor load.

Sampled-data and digital control systems, Q. Sampled-data and digital contr...

Q. Sampled-data and digital control systems? These differ fromthe continuous-data systems in that the signals at one or more points of the system are in the form of either a pu

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd