Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Comparison of induction and dielectric heating , Comparison  of Induction ...

Comparison  of Induction and Dielectric Heating After  studying the induction and  dielectric  heating  followings  points  may consider for  comparison  between  induction an

Provide definition of signals, Provide Definition of Signals A continuo...

Provide Definition of Signals A continuous-time signal x(t) is a signal that is a function of real number t. For a discrete-time signal x[n], it is a method of discrete time in

Ac generators - the alternator, In practice, it is usually better to wind t...

In practice, it is usually better to wind the field coils on the rotor and supply the field current to them via slip rings.  As the rotor turns, the changing magnetic field expe

Explain the energy bands in solids, Explain the energy bands in solids. ...

Explain the energy bands in solids. There are as several energy bands in a solid as there are energy levels in the parent atoms. Many electrical properties of significance

Discuss the benefit and limitations of utilizing wind energy, a. Discuss th...

a. Discuss the benefits and limitations of utilizing wind energy for electricity generation. b. Draw the block diagram representation of a thermal power generation unit. Illustr

Determine the Service and Backwash Rates, Determine the Service and Backwas...

Determine the Service and Backwash Rates The system on site is a pressure sand filter, with a service curve. The filter is backwashed using the feed pump, at a higher flow rate, s

Dual-ramp analog to digital converter, Q. Dual-ramp analog to digital conve...

Q. Dual-ramp analog to digital converter? Figure (a) shows the block diagram of a dual-ramp (dual-slope) A/D converter. After a start-of-conversion pulse, the counter is cleare

Physics, what do we mean when we say that an equation is dimensionally corr...

what do we mean when we say that an equation is dimensionally correct?

Explain the term full duplex transmission, Explain the term full duplex tra...

Explain the term full duplex transmission. Data can travel in both directions concurrently. There is no require to switch from transmit to receive mode as in half duplex. It's

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd