Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Explain the effect of feedback on amplifier bandwidth, Q. Explain the effec...

Q. Explain the effect of feedback on amplifier bandwidth? The bandwidth of an amplifier is defined as the range of frequencies for which the gain remains constant.The gain -ban

What are magnetic materials, Magnetic materials (A) provide path to ma...

Magnetic materials (A) provide path to magnetic flux. (B) are good insulators. (C) are semiconductors. (D) None. Ans: Magnetic materials provide path to

Define the term paging unit, Define the term Paging Unit. Paging Unit:...

Define the term Paging Unit. Paging Unit: The paging mechanism functions along with 4K - byte memory pages or along with a new extension obtainable to the Pentium with 4M byt

Customer indexing, Customer Indexing: Customer indexing (CI) is a meth...

Customer Indexing: Customer indexing (CI) is a method for enumerating the total number of consumers in a utility and tagging them to their respective poles, transformers and f

Superhet receiver, Write a short summary of the AM superhet receiver, in ex...

Write a short summary of the AM superhet receiver, in exacting consider how the demodulation stage works, and remark on the choice of component values used.

Advanced mobile phone system, Q. Advanced Mobile Phone System? Cellular...

Q. Advanced Mobile Phone System? Cellular systems employed cells with a radius in the range of 5-18 km. The base station usually transmitted at a power level of 35 W or less, a

Octal number systems, Octal Number Systems Now the  question may  arise...

Octal Number Systems Now the  question may  arise in one mind  that why  to learn  octal  number  system when  neither  human  nor the  digital  systems  uses. It  hence it is

Commercial losses in electrical systems, Commercial Losses in Electrical Sy...

Commercial Losses in Electrical Systems Commercial losses are caused by pilferage, theft, defective meters, and errors in meter reading and in estimating un-metered supply of

Continuity equation - zero electric field, Continuity Equation: Expla...

Continuity Equation: Explain continuity equation and discus the special case of continuity equation when concentration is independent of time and with zero electric field.

Self inductance , If a current is passed through a coil, it creates a flux ...

If a current is passed through a coil, it creates a flux within the coil. Any attempt to change this flux will create a back emf that acts to oppose the change.   Consider again

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd