1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Which metal has material with lowest resistivity, The material with lowest ...

The material with lowest resistivity is (A) Constantan.         (B) Silver. (C) manganin.            (D) nichrome. Ans: The material with lowest resist

Power electronics, principle of 120 degree mode of operation of voltage sou...

principle of 120 degree mode of operation of voltage source intverter

Describe the phasor equations, Q. Describe the following phasor equations r...

Q. Describe the following phasor equations represented in the time domain: (a) ¯ E = K1e-¯ γz (b) ¯ E = K2e ¯ γz where z is the space coordinate, K1 and K2 are constants,

Automatic frequency control , Discuss the requirement for automatic gain co...

Discuss the requirement for automatic gain control in AM receiver and automatic frequency control in FM. How are these 'control' voltage formed and used?

Use of computers in power systems, Q. Use of Computers in Power Systems? ...

Q. Use of Computers in Power Systems? The control and stability of any electric power system is indeed extremely important, in particular when a system is expected to maintain

Explain what is interrupt latency, Interrupt latency refers to the amount o...

Interrupt latency refers to the amount of time among when an interrupt is triggered and when the interrupt is observe by software.

Extended industry standard architecture, How is EISA bus different from ISA...

How is EISA bus different from ISA bus? The Extended Industry Standard Architecture (EISA): it is a 32 bit modification to the ISA bus. Since computers became larger and had wi

Surge current - thyristor, Surge Current It is  the maximum admissib...

Surge Current It is  the maximum admissible peak value of  a sinusoidal half  cycle of 10 ms duration at a frequency of 50Hz. The  value is specified at a given junction tem

Explain the application of clippers, Q. Explain the application of clippers...

Q. Explain the application of clippers. There are numerous clipper applications. In general clippers are used to perform one of the following two functions: · Changing the s

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd