Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Explain the types of coupling, Problem : a) What is the definition of E...

Problem : a) What is the definition of Electromagnetic Compatibility (EMC) according to the International Electrotechnical Commission (IEC) and why is it gaining increasing imp

Energy conservation, Energy Conservation Our country has a vast poten...

Energy Conservation Our country has a vast potential of energy saving. It is estimated in which measures for energy conservation and improving energy efficiency have the pote

Discuss about signal distortion in optical waveguides, Discuss about signal...

Discuss about signal distortion in optical waveguides Ans: The major reason for signal distortion within optical waveguide is dispersion. Dispersion of the transmitted

Explain the voltage regulation, Explain the Voltage Regulation? The per...

Explain the Voltage Regulation? The percent of voltage regulation of a generator is defined as the ratio of the change in voltage from no-load to full-load to the full-load vol

Solve for the time-domain forced response of the resultant, Consider an RLC...

Consider an RLC series circuit excited by v(t) = V m cos ωt in the time domain. By using superposition, solve for the time-domain forced response of the resultant current through

Mips simulator, The coursework requires you to work in pairs to write a Jav...

The coursework requires you to work in pairs to write a Java application that will take a numerical representation of a MIPS program and simulate its execution. MIPS is a Load-S

Current trasnsformer, A 13.8 kV feed er circui t breaker has a 600:5 multir...

A 13.8 kV feed er circui t breaker has a 600:5 multira tio curr ent transform er with charact eristics as show n in Figure 5.11. Th e max - imum load on the feed er is 80 A pri mar

Can you explain honorarium?, Can you explain Honorarium? Ans: Honora...

Can you explain Honorarium? Ans: Honorarium is a remuneration for work performed which is intermittent or occasional in character and either so laborious or of such special

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd