Disparity between working stress and limit state approach, Civil Engineering

Assignment Help:

Question

What is key disparity between working stress approach and limit state approach?

Answer

Working stress approach, service loads are used in whole plan and strength of material is not utilized in full extent. In this means of plan, stresses acting on structural members are intended based on flexible way and they are designed not to beat certain acceptable values. In fact, whole structure during lifespan may only knowledge loading stresses far below ultimate state and that is reason why this means is known as working stress approach. In such scenario, most economical plan can hardly be obtained by using working stress advance that is now commonly used in design of temporary works.

For maximum state approach, for each material and load, a biased safety factor is assigned independently depending on material properties and load lands. So, each element of load and material properties is exactly assessed resulting in an extra refined and accurate analysis of structure. In this relation, material strength be capable of be utilized to its greatest value during its lifespan and loads be capable of be assessed with practical probability of occurrence. Boundary state approach is frequently used for majority of reinforced concrete design as it ensures utilization of material strength with least construction price input.

 


Related Discussions:- Disparity between working stress and limit state approach

Foundation at Different Levels, Foundation at Different Levels on soft rock...

Foundation at Different Levels on soft rock. what is minimum distance in two between footing ?

Explain stopping sight distance on horizontal curve, Explain Stopping Sight...

Explain Stopping Sight Distance on Horizontal Curve Section Obstructions along the inside of curves can limit the available (chord) sight distance. A curve must be designed tha

Determine the maximum pressure at the base of the wall, A masonry retaining...

A masonry retaining wall of trapezoidal section with the vertical face on the earth side is 1.5 m wide at the top and 3.5 m wide at the base and is 5.0 m high. It retains a sand fi

Mild steel and high yield steel in water-retaining structure, Q. Mild steel...

Q. Mild steel and high yield steel in water-retaining structure? In designing water-retaining structures, movement joints may be installed in parallel with steel reinforcement

Define the impact damage - underwater inspection of bridge, Define the Impa...

Define the Impact Damage - underwater inspection of bridge? Impact from moving vessels or logs carried during the floods can inflict damage to the structure. The impact or coll

Mr Kamal Saxena, What is WBM road. How it is constructed?

What is WBM road. How it is constructed?

Explain the unconfined aquifer - ground water, Explain the Unconfined Aquif...

Explain the Unconfined Aquifer Also termed "free aquifer". Groundwater flows by gravity from high head to low head. The upper water surface is termed "water table", is influenc

Explain the ion exchange water softening, Explain the Ion Exchange water So...

Explain the Ion Exchange water Softening Softening is usually done using a resin (natural or synthetic long chain chemical with a sodium ion attached). When water containing ha

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd