Discuss in brief about iterative waterfall, Software Engineering

Assignment Help:

Discuss iterative waterfall

Iterative waterfall model

a) Requirement collecting  phase in which all requirements are specified.

b) The design phase is responsible for creating architectural outlook of the software.

c) The implementation stage in which the software design is changed  into coding.

d) Testing is a kind of stage in which the developed software component is completely tested.

 

 


Related Discussions:- Discuss in brief about iterative waterfall

Differentiate between failures and faults, Differentiate between failures a...

Differentiate between failures and faults.   Failure:- Failure is the departure of external results of program operation from requirements. So failure is dynamic. Failure can

How software metrics is beneficial for sfotware engineer, How software metr...

How software metrics is beneficial for sfotware engineer Using software metrics, software engineer measures software processes and requirements for that process. Software measu

Name some common software standards, Name some Software Standards Num...

Name some Software Standards Numerous terms related to software engineering are regularly standardised by organisations like IEEE (Institute of Electrical and Electronics Engi

What is open box testing, Open box testing is similar as white box testing....

Open box testing is similar as white box testing. It's a testing approach that consider the application's program structure, and derives test cases from the application's program l

Allocate operations to the entity life history diagram, QUESTION 1 (a) ...

QUESTION 1 (a) Suggest how the atomicity of EV1 "Request for estimate" could be improved (b) Document any five events listed above (Tip: state the actor, system agent, input

Define kpas level associated with maturity model, Define KPAs level associa...

Define KPAs level associated with maturity model KPAs are defined by SEI and associated with different maturity levels.  These are described below: Level 1 KPAs : There is

Iterative Enhancement Model, what is the advantage of Iterative Enhancement...

what is the advantage of Iterative Enhancement Model in developing a system?

What is test schedule, The test schedule is a schedule that signifies all t...

The test schedule is a schedule that signifies all tasks needed for a successful testing effort, a schedule of all test activities and resource needs.

Srs, Why is SRS document known as black box specification of a system

Why is SRS document known as black box specification of a system

State lehman first law, State Lehman's First law A program that is used...

State Lehman's First law A program that is used in real world environment of necessity must change or become progressively less useful in that environment.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd