How does an engineer determine digit of cells for concrete box girder bridges?

Answer
If depth of a box girder bridge exceeds 1/6 or 1/5 of bridge width, then it is optional to be designed as a single cell box girder bridge. However, if bridge depth is lesser than 1/6 of bridge width, after that a twin-cell or multiple cell is better choice as optional by Jorg Schlaich & Hartmut Scheef in 1982. However, one contain to note that even for wider bridges with small depths, number of cells must be minimized as readily available is not much improvement in transverse load distribution when number of cells of box girder is improved to three or more.

 


Related Discussions:- Digit of cells for concrete box girder bridges

Explain the bernoulli energy equation, Explain the Bernoulli Energy Equatio...

Explain the Bernoulli Energy Equation Accounts for the fluid energy at any point in a fluid flow system. Units are in ft. Developed for energy without friction. The total energ

Transportation engineering, what is difference between stopping sight dista...

what is difference between stopping sight distance and overtaking sight distance

True or false, an increase in consumer income will affect the supply of any...

an increase in consumer income will affect the supply of any given product

What do you mean by piston sampler, Q. What do you mean by Piston sampler? ...

Q. What do you mean by Piston sampler? In sampling silts orclays, Piston sampler is lowered into boreholes and piston is locked at bottom of the sampler. This stops debris from

Define resultant force on a given area of a horizontal plane, Resultant For...

Resultant Force on a Given Area of a Horizontal Plane By equation, the total vertical force applied to an area A on the plane is: Resultant Force R = ΡA = (lb/ft 2 )(ft 2 )

Explain the term - loss of prestress, Explain the term - Loss of Prestress ...

Explain the term - Loss of Prestress At the transfer stage, tendons produce compressive stresses in concrete. Sooner or later, the magnitude of  these stresses experiences a re

Bituminous macadam, Bituminous Macadam: Bituminous Macadam (BM) is a ...

Bituminous Macadam: Bituminous Macadam (BM) is a base course in which coarse aggregates are mixed with a bituminous binder. The mix is open-graded with 20-25 per cent voids.

Measurement of surface runoff and infiltration, Surface runoff travelling o...

Surface runoff travelling over ground surface to reach receiving water involves the following events: i) Rainfall intensity exceeds soil's infiltration rate; ii) Excess water

Standard mixes of concrete, In some nations such as Britain, specification ...

In some nations such as Britain, specification for concrete doesn'tusually require cube tests for standard mixes of concrete. Quality control of standard mixes in Britain is achiev

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd