Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
QuestionHow does an engineer determine digit of cells for concrete box girder bridges?
AnswerIf depth of a box girder bridge exceeds 1/6 or 1/5 of bridge width, then it is optional to be designed as a single cell box girder bridge. However, if bridge depth is lesser than 1/6 of bridge width, after that a twin-cell or multiple cell is better choice as optional by Jorg Schlaich & Hartmut Scheef in 1982. However, one contain to note that even for wider bridges with small depths, number of cells must be minimized as readily available is not much improvement in transverse load distribution when number of cells of box girder is improved to three or more.
In designing of elastomeric bearings, why are steel plates inserted inside Bearings?
an opening of width 3m and height 2.7 in a brick masonary has to be provided with door cum window. plan, elevation, section and 2 joining details
For a system or Net Work Done = Net Heat Added
Loads
The integration of strain over the depth is settlement. The method of producing the settlement is non-recoverable when the intensity of stress is removed. Hence, a permanent reduc
A clay layer 24 metres thick has a saturated unit weight of 18 kN/m 3 . Ground water level occurs at a depth of 4 metres. It is proposed to construct a reinforced concrete foundati
Describ the construction and working of Michelson interferometer and discuss tha method to determine wavelength of monochromatic
A 4-m-long, 6-cm-diameter cylinder placed normal to the flow is used to measure the velocity of an air stream. If a force of 50 N is measured, the air velocity is nearest (for air
A sample in a variable head permeameter is 8 cm in diameter and 10 cm high. The permeability of the sample is estimated to be 10 × 10 -4 cm/s. If it is desired that the head in th
Low Cost Roads Connecting Villages: Problem of Village Connectivity It is estimated that nearly 45 per cent of India's villages are not connected by an all-weather ro
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd