QuestionHow does an engineer determine digit of cells for concrete box girder bridges?
AnswerIf depth of a box girder bridge exceeds 1/6 or 1/5 of bridge width, then it is optional to be designed as a single cell box girder bridge. However, if bridge depth is lesser than 1/6 of bridge width, after that a twin-cell or multiple cell is better choice as optional by Jorg Schlaich & Hartmut Scheef in 1982. However, one contain to note that even for wider bridges with small depths, number of cells must be minimized as readily available is not much improvement in transverse load distribution when number of cells of box girder is improved to three or more.
which section is most effective for a design of beam and why
Instruments used in chain survey
AFor the given reinforced concrete moment frame school building determine; 1. The wind load acting on the middle truss in the roof truss assembly. 2. The net wind pressure (Wnet) o
Define Storms - underwater inspection of bridge? Storms can have a detrimental effect on bridge substructure. The velocity and depth of water and debris carried increase in rel
State the algebraic equations showing the variation of safe bearing capacity of soil (for clay and sand to be given separately) in shallow foundation with: (i) depth of foundati
Q. Define Shear slump and collapse slump in slump test? There are three kinds of slump which can take place in a slumps test, namely, true slump, shear slump and collapse slump
Question What is main difference in application of surface-protecting fenders and energy-absorbing fenders ? Answer Surface-protecting fenders are fenders that make
Determine the problems formed while design of pre-stressed concrete Two types of problems are encountered by the engineer engaged in the design of pre-stressed concrete membe
Geotechnical project specifications require that the soil's optimum moisture content of 24% be maintained during the roadbed's construction. The field moisture test finds that fi
About Doors,windows&vendilators
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!