Differentiate between iso and cmm, Software Engineering

Assignment Help:

Q. Differentiate between ISO and CMM?

Ans) The difference between CMM and ISO are as follows :-

- ISO 9000 is awarded by an international standards body. Thus, ISO 9000 certification can be quoted by an organization in official documents. Therefore, SEI CMM assessment is purely for internal use.

- SEI CMM was developed particularly for software industry and thus addresses many issues which are specific to software industry alone.

- SEI CMM goes beyond quality assurance and makes an organization to ultimately achieve Total Quality Management (TQM). In fact, ISO 9001 aims at level 3 of SEI CMM model.

- SEI CMM model gives a list of key process areas (KPAs) on which an organization at any maturity level requires to concentrate to take it from one maturity level to the next. Therefore, it gives a way for achieving gradual quality improvement.


Related Discussions:- Differentiate between iso and cmm

Developing prototype software, Introduction Energy consumer in the comp...

Introduction Energy consumer in the computer system is getting critical all around the globe now. Therefore, the ability to figure out the components that consume energy in sys

What are the general activities in design process, What are the general act...

What are the general activities in design process? i. System structuring - The system is separated into principle subsystems components and communications among these subsystem

Describe design walk throughs and critical design review, Q. Describe desig...

Q. Describe design walk throughs and critical design review. Ans. A design walkthrough is a excellence practice that allows designers to acquire an early validation of desi

How does the risk factor affect the spiral model, How does the risk factor ...

How does the risk factor affect the spiral model of software development? Ans: Risk Analysis phase is the most significant part of "Spiral Model". In this phase all possible (a

System analyst, Explain the role and functions of a Systems Analyst in the ...

Explain the role and functions of a Systems Analyst in the overall project development.

Explain key process areas of cmm, Key process areas of CMM. 1.  Require...

Key process areas of CMM. 1.  Requirements management which establishes a common relationship among the customer and developer 2.  Software project planning where reasonable

Which is not the purpose of full annealing, Which is not the purpose of ful...

Which is not the purpose of full annealing Produces hardest material.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd