Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. Differentiate between ISO and CMM?
Ans) The difference between CMM and ISO are as follows :-
- ISO 9000 is awarded by an international standards body. Thus, ISO 9000 certification can be quoted by an organization in official documents. Therefore, SEI CMM assessment is purely for internal use.
- SEI CMM was developed particularly for software industry and thus addresses many issues which are specific to software industry alone.
- SEI CMM goes beyond quality assurance and makes an organization to ultimately achieve Total Quality Management (TQM). In fact, ISO 9001 aims at level 3 of SEI CMM model.
- SEI CMM model gives a list of key process areas (KPAs) on which an organization at any maturity level requires to concentrate to take it from one maturity level to the next. Therefore, it gives a way for achieving gradual quality improvement.
Iterative Enhancement Model This model was developed to remove disadvantages of waterfall model. In this model, phases of software development remain the same however the cons
Define software testing? Software testing is a critical element of software quality assurance and shows the ultimate review of design, specification, and coding.
Q. What are the advantages of using testing tools? Ans: The merits of testing tools are They improve the productivity and quality of software development. Help in
Write about the types of project plan. Quality plan - This plan explains the quality procedures and standards that will be used in a project. Validation plan - This plan explai
User documentation consist descriptions of the functions of a system without reference to how these functions are implemented. Instances are installation guide and reference guide.
EXPLAIN COMPONENTS OF DATABASE MANAGEMENT
Provide an abstract superclass called EnergyRecord and subclasses called Contract and Transaction with default constructors (no-arg) and full-arg, overloaded constructors. Collect
Q. Show the Reasons of current software crisis? larger problem sizes, increasing skill shortage, and lack of adequate training in software engineering,
A walk-through is an informal meeting for informational purposes or evaluation.
What is live variable A variable is live from its first to its last reference within a process.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd