Differentiate between iso and cmm, Software Engineering

Assignment Help:

Q. Differentiate between ISO and CMM?

Ans) The difference between CMM and ISO are as follows :-

- ISO 9000 is awarded by an international standards body. Thus, ISO 9000 certification can be quoted by an organization in official documents. Therefore, SEI CMM assessment is purely for internal use.

- SEI CMM was developed particularly for software industry and thus addresses many issues which are specific to software industry alone.

- SEI CMM goes beyond quality assurance and makes an organization to ultimately achieve Total Quality Management (TQM). In fact, ISO 9001 aims at level 3 of SEI CMM model.

- SEI CMM model gives a list of key process areas (KPAs) on which an organization at any maturity level requires to concentrate to take it from one maturity level to the next. Therefore, it gives a way for achieving gradual quality improvement.


Related Discussions:- Differentiate between iso and cmm

What is program control instruction, What is Program Control Instruction ...

What is Program Control Instruction A program control type of instruction, when implemented, may change the address value in the program counter and cause the flow of control t

Explain in detail about data modelling, Explain in detail about data modell...

Explain in detail about data modelling. Data modeling makes use of the ERD. Having of 3 interrelated information. The data object. Attributes.  Relationsh

Incrementa lprocess model, name some software in which incremental process ...

name some software in which incremental process are used or possible to use it?

Why winrunner may fail to identify an object on a gui, Why WinRunner may fa...

Why WinRunner may fail to identify an object on a GUI? WinRunner may fail to recognize an object in a GUI in below cases: - If it isn't a standard windows object - If the

What are the various testing activities, What are the various testing activ...

What are the various testing activities? i. Test planning ii. Test case design iii. Data collection iv. Test execution v. Effective evaluation

State the term software is engineered, Justify the term "Software is engine...

Justify the term "Software is engineered" Software is engineered not manufactured. Although some similarities exist between software development and hardware manufacture, the t

Data Mining Question, This assignment uses the data set rent.txt, the Housi...

This assignment uses the data set rent.txt, the Housing Rent Prices in Munich file available at ">http://www.interactivegraphics.org/Datasets.html. 1.Produce a scatterplot of Re

Explain the software quality assurance, Software Quality Assurance and Soft...

Software Quality Assurance and Software Quality Control SQA verifies if the process that is followed to form a product is effective and does not have process defects while SQC

Explain length of code - software metrices, Explain Length of code This...

Explain Length of code This is a measure of the size of a program. Usually, the larger the size of the code of a component, the more difficult and error-prone that component is

What is eva, What is EVA? Earned Value Analysis is a process of perform...

What is EVA? Earned Value Analysis is a process of performing quantitative analysis of the software project. It gives a common value scale for each task of software project. It

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd