Q. Differences between pipe jacking and micro-tunnelling?
Pipe jacking is a general scheme of installation of pipes with a tunnelling shield in front and the pipes are jacked from a jacking pit toa receiving pit. Tunnelling shield for pipe jacking can be mechanical and electrical equipment for conducting the excavation work or itcould be a manual shield for workers going inside the shield to do manual excavation. For microtunneling, it is a type of pipe jacking of small sized non-man-entry pipes that are remotely controlled. Generally there are two general kinds of micro-tunnelling machines:
(ii) Pressurised slurry
Similar to Pressurised slurry TBM, excavated material is transported from excavation face to surface suspended in aslurry.
(iii)Auger machine
Excavated material is transported from excavation face to drive pit by a cased screw auger.
A rectangular channel is 3 m in width and draws water from a lake. The channel slope is 0.001 and the Manning’s n is 0.0013. What will be the discharge in the channel when the lake
WHY WBM ROAD SURFACE RENEWE?
Define the Predominant factor in atmospheric corrosion? The predominant factor in atmospheric corrosion in areas located above splash zone is moisture as there is an excess ava
Q. The field density of a compacted fill is determined by means of a core cutter whose empty weight is 1000 g and volume is 1000 cm 3 . The cutter full of soil weights 2890 g. If
Figure, working,principle of prismatic compass
Los Angeles Abrasion Test: In which the aggregates are placed in a rotating drum in which a certain number of cast iron cylindrical balls are also placed, and the drum rotated
with a neat well labelled sketch, explain reciprocal ranging.
Features of a Stratigraphical Survey phase The principal features of a Stratigraphical Survey phase are: a) Determination of depth of ground water, thickness, extent and ap
if the diameter of the base remains constant by what factor should the altitude be multiplied to produce a cone with twice volume as the original
The soil in a borrow pit has a void ratio of 0.90. A fill-in-place volume of 20,000 m 3 is to be constructed with an in-place dry density of 18.84 kN/m 3 . If the owner of borr
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd