Difference between road gullies and catch pits, Civil Engineering

Assignment Help:

Q. Difference between road gullies and catch pits?

Both road gullies and catchpits are the two fundamental types of drainage inlets of drainage system. However they are designed to catch stormwater, road gullies and catchpits are intended to catch stormwater at different locations. Catchpits are designed to receive stormwater from slopes and stream courses. There isn't any standard design of catchpits and they can take various forms and shapes such as inclusion of sand trap to improve the quality of collected stormwater and to stop the blockage of drains. Conversely road gullies are intended to receive stormwater from roads only.


Related Discussions:- Difference between road gullies and catch pits

Design of steel beam column with hot rolled steel built-up s, how to comput...

how to compute the compound elements particularly outstanding element of compression flange if 2-ismb300 are placed side by side

State the importance of structural element, State the importance of structu...

State the importance of structural element If this structural element is used as a beam element, subjected to self load and other imposed transverse loads, then the bottom fibr

Human values, give the two aspects of honesty& explain

give the two aspects of honesty& explain

Shear force and bending moment, relation between shear force and bending mo...

relation between shear force and bending moment and examples based on those relationship

State the net allowable bearing pressure, A footing, 2 m square, is founded...

A footing, 2 m square, is founded at a depth of 1.5 m in a sand deposit, for which the corrected value of N is 27. The water table is at a depth of 2 m from the surface. Verify the

Explain detention or retention ponds - hydrology, Explain Detention or Rete...

Explain Detention or Retention Ponds Detention/Retention Ponds: Designed to reduce and contain the peak runoff from developed areas (more impervious). Attempt to limit the runo

Theodolite, convert whole circle bearing to reduce bearing formula

convert whole circle bearing to reduce bearing formula

Write a short note on economic span of a bridge, Q. Write a short note on E...

Q. Write a short note on Economic Span of a Bridge? The span for which the total cost of bridge will be minimum is known as the economic span. The ratio of Cost of super str

State the term - total loss of prestress, Total loss of prestress The ...

Total loss of prestress The total amount of losses of prestresses may be accounted for in a prestressed concrete member by adding different losses which may take place for tha

Frction, Ask question laws of sollid friction #Minimum 100 words accepted#

Ask question laws of sollid friction #Minimum 100 words accepted#

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd