Develop a new product from the given product ingredient, Project Management

Assignment Help:

To develop a new product from the given product ingredient.

• explore new ideas for product development,

• understand the concept of development of a process,

• gain knowledge about a technique,

• determine the factors affecting the process of development,

• explain the concept of variations, and

• appreciate the packaging and labeling requirements of the product developed.

Methodology

The process of development of the product in laboratory would involve:

1) Study of the ingredient characteristics

2) Idea generation

3) Feasibility

4) Technique standardization

5) Variations

6) Product standardization

7) Product development

8) Sensory evaluation

9) Product modification

10) Final product

11) Label design and Packaging

Important considerations for the process of development

The process of development would involve exploration of various ideas for example, if the product ingredient provided is  Soya,  one need to study the product characteristics first like it being a rich source of proteins and fat. And also that as it is having low moisture content it can be ground, or made in powdered form.

Thus, the product ideas can be of types:

Soya powder, or paste used in the formation of: Soya flakes
                                                                            Soya papad
                                                                            Soya biscuits
Soya granules can be used for:                                  Namkeen preparation
                                                                           Or any other snack preparation (can be used as filling or in the base product)

Soya milk can be extracted and  products such as shrikhand, sweets, paneer, butter can be prepared.

However, it should be kept in mind that the given ingredient should be the basic or major ingredient in any product formulation.


Related Discussions:- Develop a new product from the given product ingredient

Explain the new performance management system, Question 1: (a) How does...

Question 1: (a) How does Training differ from Development? (b) Elaborate on the different training methods, highlighting their relative advantages and disadvantages. Ques

Work breakdown structure, Work breakdown structure: The work breakdown ...

Work breakdown structure: The work breakdown structure, as its name suggests, represents an organised and logical break down of the project into its component parts. Thus break

Element of total quality management, In order to adopt and initiate TQM ...

In order to adopt and initiate TQM within any organization it is necessary to understand the key elements. These elements which form the essential core of the TQM phil

Techniques of project management tools, Over the years, E has had a number ...

Over the years, E has had a number of business successes in the building trade and property development. Her latest venture is to build a hotel in YX town. E has already gained the

Use of operational approach in development process, Q. Use of Operational a...

Q. Use of Operational approach in development process? It has been defined as the application of scientific methods, technology and tools to operation of system with optimum s

Disadvantages of product layout - high overhead charges, Disadvantages of P...

Disadvantages of Product Layout - High Overhead charges Due to heavy investment, the overhead fixed charges also tend to be high. A decline in demand for the product will rend

Possible stages of a project, Project stages A project may consist of o...

Project stages A project may consist of one or more stages depending on the size of the project, its nature and client needs. Each stage has several tasks.  Possible stages

What are the causes of poor industrial relations, What are the Causes of Po...

What are the Causes of Poor Industrial Relations? Purposes of Poor Industrial Relations situation for good IR are as follows: a. Inadequate fixation of wages and wage struct

Individual values and team behaviour, Teams  are made up of  individuals, v...

Teams  are made up of  individuals, values and beliefs drive team behavior. Individuals represent an important dynamic in the study and application of team behavior. Individuals pr

What is the use of critical path analysis as a tool, What is the use of cri...

What is the use of critical path analysis as a tool? The use of critical path analysis as a tool: a. It is good visual communication and planning tool for effectual time man

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd