Determine work done per second, Mechanical Engineering

Assignment Help:

A nozzle of 50 mm. dia. delivers a stream of water that strikes a flat plate which is held normal to the axis of stream. If the issuing jet has a velocity of 15 m/sec., determine:

(i) Work done per second, if plate held stationary.

(ii) Force exerted on the plate, if plate held stationary.

(iii) Jet efficiency, if plate if plate moves in the direction of jet at 5m/sec.

(iv) Work done if plate is removed by a series of plate moving with a velocity 5m/sec.


Related Discussions:- Determine work done per second

Newtons third law, Problem - Newton's Third Law Newton's Third Law of M...

Problem - Newton's Third Law Newton's Third Law of Motion states that if two objects interact, the force F 12 exerted by object 1 on object 2 is equal in magnitude and oppos

Construction of boiler, CONSTRUCTIO N FEATURES : Comprises of a water ...

CONSTRUCTIO N FEATURES : Comprises of a water drum which is connected to two headers at the front and back ends. The headers are connected by large number of water tubes which

Explain working of belt transmission type dynamometer, Explain construction...

Explain construction and working of Belt transmission type Dynamometer?

Point and path function - thermodynamics, Point and Path Function - Thermod...

Point and Path Function - Thermodynamics: Poin t Function A point function is single valued function which always possesses a single - value is all states. For instance

Production drawing, use of productin drawing in manufacturing technolagy

use of productin drawing in manufacturing technolagy

Scope of pipeline systems, Q. Scope of pipeline systems? This specifica...

Q. Scope of pipeline systems? This specification covers the specific materials, surface preparation, method of application, quality assurance, and repair necessary for the appl

Evaluate piston effect, In a double acting vertical steam engine running at...

In a double acting vertical steam engine running at speed of 360 r.p.m., cylinder diameter is 25 cm, stroke is 30 cm, diameter of piston rod is about 3.75 cm and length of the conn

Submerged arc welding, Submerged Arc Welding   Single pass filler we...

Submerged Arc Welding   Single pass filler welds upto (8.0 mm) maximum and groove welds made with a single pass or a single pass each side, may be made using an E7os-x elect

Actual vapour compression cycle, diffrence between actual and idealactual v...

diffrence between actual and idealactual vapour compression cycle

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd