Determine the types of losses of prestress, Civil Engineering

Assignment Help:

Determine the types of losses of prestress

A loss of prestress will affect the stress distribution on a section of the member. It is therefore necessary to estimate the probable loss of prestress that may be incurred in a prestressed member. Total loss of prestress consists of those losses which are instantaneous at the transfer stage as well as those which are time dependent.

1995_types of losses.png


Related Discussions:- Determine the types of losses of prestress

Discuss about the fibre reinforced concrete, Discuss about the fibre reinfo...

Discuss about the fibre reinforced concrete Tensile strength of concrete may be improved by using a higher grade of concrete or by using special concretes such as fibre reinfor

Construction, #questidisadvantage of steelon..

#questidisadvantage of steelon..

Unsealed contraction joints in concrete pavement, Unsealed contraction join...

Unsealed contraction joints in concrete pavement For unreinforced concrete pavement, contraction joint is an approximately 3mm wide groove with a depth of about one-third to o

Define the meanings of texture, a) Define the meanings of 'texture' and 'st...

a) Define the meanings of 'texture' and 'structure' of a soil. b) Write the meaning of 'black cotton soil'? Indicate the geological and climatic conditions that tend to make

Highway economics, What is highway economics and what are its main contents...

What is highway economics and what are its main contents to study ?

Rcc and rbc, types mixing,curing,water cement ratio,qualities and workabili...

types mixing,curing,water cement ratio,qualities and workability

State the laws governing compaction of cohesion less soils, a) What are th...

a) What are the laws governing compaction of (i) cohesion less soils like sand and (ii) moderately cohesive soils like sandy clay ? b) To what compaction pressure does the

Break even point, Break even point: EM Electricals, Inc., contains fix...

Break even point: EM Electricals, Inc., contains fixed costs of Rs. 600,000 this period. Variable costs involved labour charges of Rs.100 per unit and material cost of Rs. 200

Closed traverse, closed traverse maths problems at list 5 station

closed traverse maths problems at list 5 station

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd