Determine the total head and total pressure of water flowing at in a pipe which has the following data:
Flow= 2,500 gpm; Elevation = 30 ft; Pressure = 40 psi; Pipe Diameter = 12 inch; velocity = 7 ft/sec; ??water = 62.4 lb/ft3.
Solutions: Ep = (40 psi)(2.31 ft/psi) = 92.4 ƒt
Ev = (V2/2g ):= (7)2 / (2)(32.2) = 0.76 ƒt
Ez = 30 ƒt
H = Total Head = Ep + Ev + Ez = 92.4 ƒt + 0.76 ƒt + 30 ƒt = 123.2 ƒt
P = Total Pressure = γH = (62.4 lb / ƒt3)(123.2 ƒt) = 7,688 lb/ ƒt2 = 53.3 psi
Construction and working of calomel electrode
in what condition curve s-t curve is concave and convex
Ask question #WHAT is presentation skill #
What is the minimum radius, R min , that can be used on a horizontal curve with a 70 mph design speed, a maximum superelevation, e max = 8%, and a side friction factor, f = 0.10?
defference between direct and indirect ranging..
Formaldehyde and phenol are polymerised to resultant product that was known as Answer: This is known as bakelite.
m25 mix water cement ratio
what is road survey ?
Explain the Statements about the Construction Contract Process I. Surety bond assures the project owner a guarantee of funds equivalent to a promissory note. The surety bond is
difference between RCC and RBC
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd