Determine the System Integration the life cycle process.

  • It is the process of putting hardware, software and user together to prepare a system.

System Installation Issues are

  • Environmental assumptions may be wrong.
  • There may be human resistance at the beginning of a new system.
  • System may be coexist with different systems for some period.
  • There might be happen some physical installation trouble (e.g. cabling trouble).
  • Operator training need to be identified.

 

 

 


Related Discussions:- Determine the system integration the life cycle process

What is meant by software prototyping, What is meant by software prototypin...

What is meant by software prototyping? Software prototyping is a process of creating a model for the software product. This is developed based on the currently known requiremen

Explain about core dumps debugging technique, Q. Explain about Core dumps d...

Q. Explain about Core dumps debugging technique? Debugging is the activity of locating as well as correcting errors. Core dumps: -A printout of all registers as well as rel

Stats free, system architecture block diagram

system architecture block diagram

Illustrate exploratory testing, Illustrate exploratory testing. - In ex...

Illustrate exploratory testing. - In exploratory testing approach testers are involved in maximum test execution and minimum planning. - Planning includes creation of a test

Software requirements specification, A Software Requirements Specification...

A Software Requirements Specification (SRS) is a complete description of the behavior of the system to be developed. It includes a set of use cases, describing the interactions

Determine the primary activities of spiral model, Determine the primary act...

Determine the primary activities of spiral model Below are the primary activities in this model: • Finalising Objective: Objectives are set for the particular phase of the

What is the use of knowledge of risk acceptance to engineers, What is the u...

What is the use of knowledge of risk acceptance to engineers?  The past experience and historical data give better information about safety of products designing there are stil

Explain in detail about the software process, Explain in detail about the s...

Explain in detail about the software process. It is explained as the structured set of activities that are required to develop the software system. Fundamental activ

Calculate the peak manning time, Q. Consider a project for which the manpow...

Q. Consider a project for which the manpower requirement is 200 PY and the development time is 2 years. calculate the peak manning time. Ans Software Project cost K=200 PY

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd