Determine the optimal solution nonlinear programming model, Operation Management

Assignment Help:

The Hickory Cabinet and Furniture Company makes chairs and tables. The company has developed the following nonlinear programming model to determine the optimal number of chairs (x1) and tables (x2) to produce each day to maximize profit, given a constraint for available mahogany wood.

Maximize 280x1 - 6x1^2 + 160x2 ¡ 3x2^2

Subject to 20x1 + 10x2 = 800 board feet x1; x2 > or equal to 0

Determine the optimal solution to this model.


Related Discussions:- Determine the optimal solution nonlinear programming model

How many stamping machines are required, Bloomsday Outfitters produces T-sh...

Bloomsday Outfitters produces T-shirts for road races. They need to acquire some new stamping machines to produce 30,000 good T-shirts per month. Their plant operates 200 hours per

Outline suggestions for stimulate strategic entrepreneurship, As the invest...

As the investment community watches to see if Blockbuster will be able to sustain a double-digit growth rate under the new direction, the CEO is reviewing his actions as the strate

Explain capacity is the maximum rate of output of a process, 1. Capacity is...

1. Capacity is the maximum rate of output of a process. 2. Capacity decisions should be made separate from strategic decisions. 3. Capacity can be expressed by output or inpu

What are the three sequential operations, A manufacturing process consists ...

A manufacturing process consists of three sequential operations. At maximum capacity operation A can output 125 units per hour, Operation B can output 120 units per hour, and Opera

Line balencing, What do you understand by “line balancing”? What happens if...

What do you understand by “line balancing”? What happens if balance doesn’t exist?

Line balancing, What do you understand by “line balancing”? What happens if...

What do you understand by “line balancing”? What happens if balance doesn’t exist?

Explain interpret the meaning of the p-value in this problem, Initially, th...

Initially, the mean turnaround time for a stress test was 68 hours. After incorporating changes into the stress-test process, the quality improvement team collected a sample of 50

Determine the wbs shown below, Consider the WBS shown below: 1.00.00 1.1...

Consider the WBS shown below: 1.00.00 1.1.0 1.1.1 1.1.2 1.2.0 1.2.1 1.2.2 If the total program costs $100,000 and 1.2.1 and 1.2.2 are each $20 K, then the cost of 1.1.0 is:

Explain what use of the term sale rather than demand presume, What does use...

What does use of the term sales rather than demand presume?

Simulation, Which of the following probability distributions cannot be simu...

Which of the following probability distributions cannot be simulated ?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd